ML20135G078
ML20135G078 | |
Person / Time | |
---|---|
Site: | Nine Mile Point, Columbia, Yankee Rowe, 05000000 |
Issue date: | 09/13/1985 |
From: | Shingleton R PACIFIC NUCLEAR SYSTEMS, INC. |
To: | Bernard H Office of Nuclear Reactor Regulation |
Shared Package | |
ML20135G079 | List: |
References | |
CK-9770, NUDOCS 8509180133 | |
Download: ML20135G078 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7971999-10-20020 October 1999
[Table view]Submits Results of Review of 990521 & 0709 Ltrs Which Provided Core Shroud Insp Results & Tie Rod Stabilizer Assemblies ML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G1291999-10-15015 October 1999 Forwards Errata to Safety Evaluation for Amend 168 Issued to FOL DPR-63 on 990921.Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML20217C1051999-10-0808 October 1999 Forwards Amend 153 to License DPR-3 & Safety Evaluation. Amend Revises TS Section 6.0,Administrative Controls,By Deleting TS Sections 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20212K8601999-10-0606 October 1999 Responds to Concern in 990405 Petition Re Residual Heat Removal Alternate Shutdown Cooling Modes of Operation at Nine Mile Point Nuclear Station,Unit 2 ML20212J2231999-10-0101 October 1999 Forwards Copy of Environ Assessment & Fonsi Re 990317 Application for Amend to Revise TS Section 6.0 by Deleting TS Section 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212J4651999-09-30030 September 1999 Informs of Completion of mid-cyle PPR of Nine Mile Point Nuclear Station on 990916.Determined That Problems in Areas of Human Performance & Work Control Required Continued Mgt Attention.Historical Listing of Plant Issues Encl ML20212J8831999-09-30030 September 1999 Informs That Util 980810 & 990630 Responses to GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at NPPs Acceptable. NRC Considers Subj GL to Be Closed for Plant ML20212K8641999-09-30030 September 1999 Informs That During 990927 Telcon Between J Williams & J Bobka,Arrangements Were Made for Administration of Exams at Plant During Wk of Feb 14,2000.Preliminary RO & SRO License Applications Should Be Submitted 30 Days Prior Exam ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212B2821999-09-14014 September 1999 Responds to 990712 Correspondence Which Responded to NRC Ltr Re High Failure Rate for Generic Fundamentals Exam of 990407 for Nine Mile Point.Considers Corrective Actions Taken to Be Acceptable ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211J5001999-08-31031 August 1999 Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML20211K5031999-08-30030 August 1999 Responds to Ltr Addressed to Chairman Dicus, Expressing Concerns Involving 990624 Automatic Reactor Shutdown.Insp Findings & Conclusions Will Be Documented in Insp Repts 50-220/99-06 & 50-410/99-06 by mid-Sept 1999 ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211J2711999-08-27027 August 1999 Forwards Amend 152 to License DPR-3 & Safety Evaluation. Amend in Response to Application Dated 990324,deletes License Condition 2.C (10) Which States: Licensee Shall Maintain FFD Program IAW Requirements of 10CFR26 ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat ML20211P5161999-08-26026 August 1999 Discusses Submitted on Behalf of Niagara Mohawk Power Corp Written Comments Addressing 10CFR2.206 Petition & Request That Ltr & Attached Response Be Withheld from Public Disclosure.Request Denied ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211G4921999-08-26026 August 1999 Advises That Info Re Comments Addressing 10CFR2.206,dtd 990405 Will Be Withheld from Public Disclosure,In Response to ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML17284A8981999-10-14014 October 1999
[Table view]Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211J5001999-08-31031 August 1999 Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML20210S0621999-08-10010 August 1999 Forwards semi-annual fitness-for-duty Program Performance Data for six-month Period of 990101-990630,IAW 10CFR26.71(d) ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML20210F3691999-07-21021 July 1999 Submits Response to NRC Request for Clarification of Certain Details of Yaec Proposed Mods to Yankee Nuclear Power Station Defueled TS ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) 1999-09-09 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML19325E9001989-10-19019 October 1989
[Table view]Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request Response ML19327A8441989-10-11011 October 1989 Forwards Pleadings,Motions & Orders Filed in Alchemie Reorganization Action.Alchemie Currently Preparing Reorganization Plan Which Will Serve as Framework for Future Company Business Activities ML19327B2491989-10-0606 October 1989 Forwards Justification for Extension of Applicability of 890807 SER Re Acceptance of BAW-10175, Rod Exchange Methodology Topical Rept. ML19327A8511989-10-0505 October 1989 Forwards Wh Arowood 890907 Ltr & Other Supplemental Info to Replace Info Previously Filed ML20247F4121989-08-31031 August 1989 Advises That Response to Order Modifying Licenses & Order to Show Cause Why Licenses Should Not Be Revoked Will Be Sent. Responses to NRC Three Basic Questions Re Status of Licensee Finances & Rationale for Having License Provided ML20246B1671989-08-0808 August 1989 Forwards Response to 890717 Request for Info Re Filings W/ Us Bankruptcy Court & Financial Capabilities.Ownership of Unclassified Equipment Remains Unchanged ML20247Q5521989-05-24024 May 1989 Notifies That J Smelser Contract Ended,Effective 890517. Mgt of Company by Listed Board of Director Members Will Continue Until New Chief Executive Officer Selected ML20247P8071989-04-0404 April 1989 Forwards Ltr in Which Concerns for Potential Significant Deficiency Under 10CFR21 Expressed ML20247G4991989-03-30030 March 1989 Forwards Proprietary BAW-10175P, Rod Exchange Methodology, Developed for Calculating Parameters While Performing Control Rod Measurements Using Rod Exchange Technique to Be Used at Plants.Rept Withheld (Ref 10CFR2.790) ML19324C3151989-02-20020 February 1989 Informs of Change in Vendor Plans for Inspecting Fuel Rods Containing Fuel Pellets Supplied by Ge.Ultrasonic Insp of Fuel Rods at Oconee 1 Found No Failed Rods in three-cycle, Discharged Fuel Assemblies ML20235M8971989-02-10010 February 1989 Requests Withholding of Proprietary WCAP 12125, Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per 10CFR2.790 ML20206D6241988-11-11011 November 1988 Forwards Projected Decommission Costs of Centrifuge Machines to Be Transferred to New Facility at Oliver Spring,Tn. Licensee Will Be Able to Offset Total Decommissioning Costs by Setting Aside Annual Decommissioning Cost Plus Reserve ML20205Q6331988-11-0202 November 1988 Forwards Revised Proprietary Pages to BAW-10164P, RELAP5/Mod2-B&W,Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis. Cso Film Boiling Correlation Replaced w/Condie-Bengston IV Correlation & Typos Corrected ML20205P9511988-11-0101 November 1988 Forwards Rev 6 to Security Plan for Alchemie Facility 1 - Cpdf,Oak Ridge,Tn & Rev 6 to Security Plan for Alchemie Facility 2 - Oliver Springs,Oliver Springs,Tn. Revs Withheld (Ref 10CFR2.790(d)) ML20195E4291988-10-31031 October 1988 Forwards Numbers 1-5 of Rev 5 to Alchemie Security Plans. Requests Replacement of Pages 23-25 & 35 & Encl Rev Page ML20205N3301988-10-27027 October 1988 Forwards Sketch of Feed Sys,Withdrawal Sys Refrigeration Cart & Typical Withdrawal,Large & Small,Pumping Stations ML20195B6091988-10-21021 October 1988 Forwards Summary of B&W Fuel Co Position Re Small Break LOCA Calculations Contained in Util FSARs for Upcoming Reload Cores Which Will Contain Fuel Mfg by B&W ML20154K3841988-09-12012 September 1988 Forwards Enhanced Facts Re Adequacy of Funding for Decontamination & Decommissioning (D&D) of Facilities. Intends to Establish Funded Reserve for D&D at Completion of Sale of Unclassified Equipment Not Needed for Production ML20154E6451988-08-31031 August 1988 Requests That 880722 & 0812 Ltrs Re Security Sys Components Be Withheld from Public Disclosure (Ref 10CFR2.790(d)) ML20207L7651988-08-30030 August 1988 Requests That Proprietary WCAP 11935, McGuire Unit 2 Evaluation for Tube Vibration Induced Fatigue, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20151H9381988-07-25025 July 1988 Forwards Proprietary BAW-10168P, B&W LOCA Evaluation Model for Recirculating Steam Generator Plants ML20151M9211988-07-20020 July 1988 Responds to 880621 Request for Addl Info Re Enrichment of Naturally Occurring radioisotopes.Te-123 Will Be Enriching Approx 60 G to About 50% ML20151L3321988-07-20020 July 1988 Forwards DOE Ltr Indicating Acceptance of Classified Matter. Licensee Agrees to Remove Any Toxic or Hazardous Matl from Classified Equipment Prior to Transfer to DOE for Disposal ML20151G9761988-07-14014 July 1988 Forwards Rev 2 to Security Plan for Shipment of Classified Matter.Rev Withheld (Ref 10CFR2.790) ML20150F1561988-07-0808 July 1988 Advises of Changes to Alchemie Board of Directors,Per 880618 Annual Stockholders Meeting ML20155F4441988-05-0404 May 1988 Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104 ML20151F7661988-03-29029 March 1988 Forwards Updated Pages to Proprietary BAW-10171P, REFLOD3B- Model for Multinode Core Reflooding Analysis, Per ECCS Methodology for Facilities Reloads.Mod Removes Henry Quench Temp Criteria & Potential Conflict in Logic.Pages Withheld ML20234C2231987-12-28028 December 1987 Forwards Proprietary BAW-10164P, RELAP5/MOD2-B&W,Advanced Program for LWR LOCA & Non-LOCA Transient Analysis. Rept Describes Computer Code Used to Analyze RCS Behavior During Blowdown Phase of LOCA Transient.Rept Withheld ML20234D1101987-12-14014 December 1987 Forwards Proprietary BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis. Rept Describes Computer Code That B&W Will Be Using to Analyze RCS Behavior During Refill of LOCA Transient.Rept Withheld ML20237C3611987-11-24024 November 1987 Requests That Proprietary Rev 2 to WCAP-11386, Byron/ Braidwood T-Hot Reduction Final Licensing Rept, Be Withheld (Ref 10CFR2.790(b)(4)) ML20236C0261987-10-22022 October 1987 Forwards Proprietary BAW-10165P, FRAP-T6-B&W:Computer Code for Transient Analysis of LWR Fuel Rods. Rept Describes Computer Code That B&W Will Be Using for Future Transient Analyses of LWR Fuel Rods.Rept Withheld (Ref 10CFR2.790) LD-87-056, Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request1987-09-18018 September 1987 Forwards Summary of C-E Fuel Irradiated &/Or Discharged in 1986 on plant-by-plant Basis in Response to 870807 Request ML20236H4971987-07-29029 July 1987 Forwards Draft Proprietary Topical Rept BAW-10166P, Beach Computer Code for Reflood Heat Transfer During Loca. Draft Submitted to Permit Interaction Between B&W,Nrc & Util. Affidavit for Withholding Encl.Fee Paid ML20236B4141987-07-13013 July 1987 Forwards Proprietary Draft 1 of BAW-10168P, ...B&W LOCA Evaluation Model for Recirculating Steam Generator Plants, to Be Used for LOCA Analysis of Catawba & McGuire Reload Fuel Cycles.Rept Withheld (Ref 10CFR2.790).Fee Paid ML20196K1621987-07-0909 July 1987 Partially Deleted Ltr Submitting Addl Info in Response to NRC 861230 & 870211 Requests Re 860918 Application for Exemption from Requirement to Convert from High Enriched U to Low Enriched U for Reactor Fuel,Per Generic Ltr 86-12 ML20215L0591987-06-22022 June 1987 Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl ML20215D4081987-05-15015 May 1987 FOIA Request for Reactor Vessel Surveillance Capsule Repts for Turkey Point 4,Zion 2 & DC Cook 1 ML20237D2761987-04-27027 April 1987 Forwards List of 200 Parameters That Company Will Provide to Offsite Agencies,Per Request to D Schultz.List of Parameters That Will Be Available to NRC Via Zion Data Link During Coming Federal Field Exercise & Dryrun Also Encl ML20209F9801987-04-16016 April 1987 Informs That All Three Items on Page 1 of Encl Completed,Including Replacement Lever Arms for Util,Life Test for Cracked Lever Arm & Exam of Riveting Process to Ensure Against Overstressing.Recommends Matter Be Closed ML20212R4711987-04-15015 April 1987 Forward Proprietary Draft 1 to BAW-10171P, REFLOD3B,Model for Multinode Core Reflooding Analysis, for Review of ECCS Methodology for Plants Fuel Reloads,Per . W/Affidavit.Draft Withheld (Ref 10CFR2.790).Fee Paid LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days1987-04-10010 April 1987 Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days ML20206E7851987-04-0202 April 1987 Confirms Intention to Use FOAM2 Computer Program as Part of ECCS Evaluation Model for Westinghouse Designed Plants. Review of Applicability of Code to Westinghouse Designed Plants Requested Prior to 880701 ML20237D6431987-03-25025 March 1987 Forwards Technical & Cost Proposal for Task Order 009, Continuing Exercise Support to NRC Operations Ctr, Electronic Transmission of Plant Parameters During Exercises, Under Contract NRC-05-86-170 ML20237D6681987-03-0404 March 1987 Forwards Revised Draft Statement of Work Proposed for Task Order 009, Continuing Exercise Support to NRC Operations Ctr,Electronic Transmission of Plant Parameters During Exercises, for Contract NRC-05-86-170 ML20237D6881987-02-14014 February 1987 Forwards Parameters & Computer Points That Author Will Be Attempting to Get Util to Make Available for Transmission to NRC During Federal Field Exercise - 2 ML20205G1591987-01-20020 January 1987 Requests Proprietary Responses to NRC Review Questions Re Resistance Temp Detector Bypass Elimination Be Withheld (Ref 10CFR2.790) NRC-87-3194, Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted1987-01-0707 January 1987 Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted ML20214P1911986-11-19019 November 1986 Forwards Proprietary NEDC-31336, GE Instrument Setpoint Methodology, Per Lrg Instrument Setpoint Methodology Group .Rept Applicable to Listed Plants & Withheld (Ref 10CFR2.790) ML20213H0151986-11-14014 November 1986 Forwards Proprietary Draft 1 to BAW-10165P, FRAP-T6-B&W Computer Code for Transient Analysis of LWR Fuel Rods. Rept Submitted to Permit Interaction Between NRC & B&W to Support Util Schedule Needs.Rept Withheld (Ref 10CFRF2.790) ML20207H9471986-11-12012 November 1986 Requests Withholding of Proprietary WCAP-11323, Resistance Temp Detector Bypass Elimination Licensing for Byron 1 & 2 & Braidwood 1 & 2, from Public Disclosure,Per 10CFR2.790. Affidavit Encl 1989-08-08 |
Text
,
- $Q W KIFIE @rC b og NU[LE/lR S Y S~i E mis September 13, 1985 Ref. CK/9770 Mr. Harold Bernard Nuclear Reactor Regulation Special Projects Branch U.S. Nuclear Regulatory Commission 7920 Stop P-340 Washington, DC 20014
Dear Mr. Bernard:
Enclosed please find 10 copies of Topical Report TP-05, Rev. O dated August 26, 1985 covering the Pacific Nuclear System's Radwaste Solidification System. This Topical Report covers the equipment that we plan to use to solidify the decontamination waste produced at Vermont Yankee in September and October of this year. This equipment will also be used to solidify waste produced from additional decontamination projects that we expect to perform in early 1986, as well as waste produced at WPPSS Unit 2 and Nine Mile Point, contracts which we are currently bidding on. This Topical Report is being submitted to you under the NRC Topical Report Program for review and acceptance for referencing in licensing actions. Also enclosed is our application fee in the amount of $150 We welcome your questions and comments and are prepared to submit additional informatilon, if necessary to support approval of this report at your earliest convenience.
Sincerely, PACIFI NUCLEAR SYSTEMS, INC.
Roger Shingleton Vice President-
Enclosure:
10 copiea of TP-05, Rev. 0 3 Application fee: $150.00 10 l
RLS/skh co
~
8 p
M' 1 86R 838PDR% , poQ d'VA p90 l
Pacihc Nuclear Systems Inc. 1010 South 336th Street federal Way. Washington 98003 (206)874 2235 Telex 152667 PNSIUD i
L j