MONTHYEARML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20216E5841998-03-12012 March 1998 Notice of Violation from Insp on 980202-12.Violation Noted: on 980211,inspector Identified That Derailer Was Not Locked in Derail Configuration,Per Plant Security Procedure PS-012-101,rev 9 IR 07100029/20120011998-03-12012 March 1998 Notice of Violation from Insp on 971201-980205.Violation Noted:From 971029-1201,licensee Failed to Initiate Condition Rept When Adverse Condition Was Identified ML20216E1311998-03-12012 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted: Licensee Did Not Make Surveys Reasonable Under Circumstances to Ensure Compliance w/10CFR20.1501(a) ML20203L2081998-03-0303 March 1998 Notice of Violation from Insp on 980202-06.Violation Noted: on 971226,two Individuals Did Not Make Surveys That Were Reasonable Under Circumstances to Ensure Compliance w/10CFR20.1201(a)(2)(ii) ML20199L2851998-02-0505 February 1998 Notice of Violation from Insp on 971215.Violation Noted:On 971110,two Independent Trains of Auxiliary Component Cooling Water Were Not Maintained Operable in Mode 1 ML20198M2751998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Licensee Failed to Require Adequate Postmaintenance Testing to Insure That Equipment or Sys Capable of Performing Intended Safety Function ML20202E2831997-12-0202 December 1997 Notice of Violation from Insp on 970922-26 & 1006-10. Violation Noted:On 960704,desired Changes Identified for Entries in Table 3.8-1 of Technical Requirements Manual & as of 971010,had Not Been Evaluated Under 10CFR50.59 Process ML20199F7291997-11-19019 November 1997 Notice of Violation from Insp on 970921-0001.Violation Noted:Administrative Procedure UNT-007-006 Not Implemented ML20217K8831997-10-23023 October 1997 Notice of Violation from Insp on 970929-1003.Violation Noted:Procedures Not Maintained for EOP in That Licensee Failed to Revise EOP OP 902-008 to Provide Operators W/Instructions for Closing Containment Spray Valves ML20211Q3641997-10-17017 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:As of 970731,Condition Rept 97-0989 Identified 3 Addl Valves That Had Non Qualified Thermal Overload Relays Installed in TS Required Equipment ML20211Q5131997-10-0909 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted: on 970110,0507 & 24,0611 & 12,radiation Workers Entered Radiological Controlled Area W/O Required Electronic Dosimeter or Thermoluminescent Dosimeter or Both ML20210R3661997-08-28028 August 1997 Notice of Violation from Insp on 970629-0809.Violation Noted:As of Jan 1997,for Emergency Ls,Licensee Failed to Establish Goals Commensurate W/Safety as Described in 10CFR50.65(a)(1) ML20210R5231997-08-27027 August 1997 Notice of Violation from Insp on 970707-25.Violation Noted: Final Safety Analysis Rept Updated File in May of 1996 Did Not Include Latest Matl Developed 6 Months Prior to Date of Filing ML20149J9081997-07-22022 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:On 970520,procedure UNT-005-003 Was Not Implemented Properly & W/O Independent Review by Licensed Operator ML20141B5901997-06-19019 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:As of 970404,design Basis Not Correctly Translated Into Procedures in That Procedural/Instructional Requirements to Limit Emergency DG Loading Not Implemented ML20140J3041997-06-16016 June 1997 Notice of Violation from Insp on 970428-0502.Violation Noted:Licensee Failed to Translate Design Requirements for Cold Weather Operation of Wet Cooling Tower Into Sys Operating Procedure OP-002-001, Accws, Rev 10 ML20148E2621997-05-29029 May 1997 Notice of Violation from Insp on 970421-25.Violation Noted: Licensee Determined That Waterford 3 Security Superintendent Had Not Been Notified Prior to or Concurrently W/Depature from Plant Site of Approx 10 Contract Employees ML20141K0331997-05-23023 May 1997 Notice of Violation from Insp on 970421-25 w/in-ofc Insp & follow-up Continuing Through 970501.Violations Noted: Measures Did Not Assure That Welding Was Controlled IAW Requirements in Listed Examples ML20148C3201997-05-0909 May 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:From 951031 to 960823, Licensee Operated Facility W/O Assuring That Two Independent Groups of Containment Cooling Fans Were Operable ML20138K2241997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violations Noted:Licensee Failed to Implement Requirements of TS 6.2.2.e & Procedure UNT-005-005 Between 970201 & 0301 ML20137E8511997-03-24024 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970218,licensee Did Not Perform Surveys Required by 10CFR20.1501 That Resulted in Failure to Post Caution, Radioactive Matl Sign ML20134K1831997-02-0707 February 1997 Notice of Violation from Insp on 961201-970111.Violation Noted:Security Patrol Officer Observed Protective Lighting Sys Deficiency When Lighting Was Needed & Did Not Immediately Notify Central or Secondary Alarm Station ML20133A0511996-12-26026 December 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Actual Design Configuration of Containment Vrs Different from That Described in Amend 28 to Plant FSAR from 1985 - Jul 1996 ML20132G0551996-12-19019 December 1996 Notice of Violation from Insp on 961013-1130.Violation Noted:On 961001,licensee Failed to Secure Airborne Radioactivity Removal Sys After Stopping Containment Purge ML20132E1441996-12-13013 December 1996 Notice of Violation from Insp on 960123-0628.Noncompliance Noted:On 960111,RM Gracin,Employee of Entergy Operations, Inc,Deliberately Provided Info to NRC Inspector & Licensee Representatives That Was Inaccurate Re Unescorted Access ML20134K7781996-11-13013 November 1996 Notice of Violation from Insp on 961021-25.Violations Noted:Licensee Failed to Verify Operational Readiness of Valves Whose Function Required for Safety IAW Section 11 of ASME Boiler & Pressure Vessel Code ML20129K2341996-11-0404 November 1996 Notice of Violation from Insp on 960901-1012.Violation Noted:Licensee Used a Pressure Instrument w/full-scale Range That Exceeded Three Times Ref Value or Less ML20129D7531996-09-20020 September 1996 Notice of Violation from Insp on 960721-0831.Violation Noted:Work Authorization 01149346 Not Appropriate to Circumstances by Not Requiring Return of Manual/Automatic Setpoint to Original State Prior to Returning Sys to Svc ML20149F3031994-08-0505 August 1994 Notice of Violation from Insp on 940529-0709.Violation Noted:In Violation of TS 6.8.1a,CVC Sys Flow Diagram Failed to Show All Letdown Radiation Monitor Purge Connections & Component CWS Flow Diagram Failed to Show All Valves in Sys ML20059H0181994-01-20020 January 1994 Notice of Violation from Insp on 931031-1211.Violation Noted:Maint Technician Made Entries Into Overhead on +46 Foot Level of Radiation Controlled Area W/O Contacting Health Physics Personnel Prior to Making Entries ML20058H4871993-12-0707 December 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:On 930201-0930,one of Two Independent Spray Sys Inoperable & Required Actions Not Taken ML20058E6251993-11-29029 November 1993 Notice of Violation from Insp on 930919-1030.Violation Noted:On 930817,Valve CMU-1131 Was Opened & Left in Open Position Until 931019 ML20059J8821993-11-0505 November 1993 Notice of Violation from Insp on 930913-14 & 1019-22. Violations noted:hand-carried Item Entered Protected Area W/O Being Searched by X-ray Exam Device or Being Physically Searched by Security Officer ML20059E1561993-10-28028 October 1993 Notice of Violation from Insp on Stated Date.Violation Noted:Nrc Identified That Site Directive W4.1.1 Inadequate for Initiating Evaluation to Determine Reportability of Event or Condition ML20057G2011993-10-15015 October 1993 Notice of Violation from Insp on 930913-17.Violation Noted: No Nasal Wipes Were Obtained from Individuals Who Were Identified as Having Facial Contamination on 920925 & 930729 ML20057D4461993-09-28028 September 1993 Notice of Violation from Insp on 930726-30 & 0826.Violation Noted:Licensee Failed to Identify & Initiate Nonconformance Condition Identifications for ASME Section III Pressurizer Safety Valves Exceeding + or - 1% Tolerence Specified in TS ML20046A1271993-07-20020 July 1993 Notice of Violation from Insp on 930516-0626.Violation Noted:Diesel Generator Air Receiver B2 Outlet Isolation Valve EGA-152B Found to Be Unlocked in Open Position ML20045D4481993-06-24024 June 1993 Notice of Violation from Insp on 930607-11.Violation Noted: Between Nov 1990 & Aug 1992 Chemical Vol Control Sys Filter Samples Not Collected & Submitted for Offsite Analysis ML20045A8311993-06-0909 June 1993 Notice of Violation from Insp on 930404-0515.Violation Noted:Operators Failed to Refer to off-normal Procedure OP-901-102,upon Determining That part-length CEA 28 Immovable During Performance of Surveillance Procedure ML20036A3561993-05-0404 May 1993 Notice of Violation from Insp on 930324-0401.Violation Noted:On 930324,fire Watch Patrol in Valve Operating Encl Bay a Room Inadequate in That Personnel Performing Patrol Failed to Observe Area for Fire Hazards ML20128D1181993-02-0101 February 1993 Notice of Violation from Insp on 921129-930109.Violation Noted:Corrective Actions Taken in Response to Violations 50-382/8941-02 & 50-382/9201-01 Inadequate,As Evidenced by Listed Examples 1999-06-15
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area IR 05000382/19980171998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals IR 05000382/19980161998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering 1999-09-08
[Table view] |
Text
.
APPENDIX A NOTICE OF VIOLATION Louisiana Power and Light Company Docket:
50-382 Waterford Unit 3 Permit:
NPF-26 During an NRC inspection conducted on February 11-15, 1985, violations of NRC requirements were identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violations are listed below:
A.
Inadequate Documentation for EBASCO Safety-Related Ventilation Heating System and Replacement Parts Used With Charcoal Filters 10 CFR 50, Appendix B, Criterion VII, requires that documentary evidence that material and equipment conform to design procurement requirements on which the plant was licensed shall be available at the nuclear power plant.
Contrary to the above, licensee documentation from the vendor stated that the purchase order requirements were considerably beyond those under which the original equipment was manufactured, though original equipment procure-ment procurement documents contained these requirements. The licensee deleted the design procurement requirements and accepted the replacement parts.
This is a Severity Level IV (Supplement II.d) (50-382/8504-01).
B.
Licensee Procedures for Maintenance of Equipment Qualification and Procurement of Spare Parts 10 CFR Part 50, Appendix B, Criterion V, requires, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Contrary to the abr ve, the licensee did not have procedures which:
1.
Verified supplier acceptance of, and certification of compliance (where required), of changes to safety-related purchase orders which affect design or quality.
2.
Required design change review, including 10 CFR 50.59 review, for Purchase Order major exceptions which delete technical or quality requirements contained in Architect Engineer (AE) or other design specifications used to assure the design base upon which the plant J
was licensed.
SuTd8A$8Ega G
L tt
. n 3.
Assured the review of previously procured spare and replacement material, parts and components, and future procurement of such parts are reviewed against the final, "as-built" Ebasco design and procurement specifications for design and quality changes which affect reactor plant safety.
4.
Implemented maintenance of equipment qualification prior to fuel load as committed in Section A6. of Revision 2 (November 1982) of LP&L's Waterford SES Unit No. 3 Response to NUREG-0588.
This is a Severity Level IV Violation (Supplement II.d) (50-382/8404-03).
Pursuant to the provisions of 10 CFR 2.201, Louisiana Power and Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the reason for the violations if admitted,
.(2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this 9th day of Oct., 1985.