Notice of Violation from Insp on 850211-15
ML20133G724
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/09/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20133G722 List:
References
50-382-85-04, 50-382-85-4, NUDOCS 8510160100
Download: ML20133G724 (2)


Text

.

APPENDIX A NOTICE OF VIOLATION Louisiana Power and Light Company Docket:

50-382 Waterford Unit 3 Permit:

NPF-26 During an NRC inspection conducted on February 11-15, 1985, violations of NRC requirements were identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violations are listed below:

A.

Inadequate Documentation for EBASCO Safety-Related Ventilation Heating System and Replacement Parts Used With Charcoal Filters 10 CFR 50, Appendix B, Criterion VII, requires that documentary evidence that material and equipment conform to design procurement requirements on which the plant was licensed shall be available at the nuclear power plant.

Contrary to the above, licensee documentation from the vendor stated that the purchase order requirements were considerably beyond those under which the original equipment was manufactured, though original equipment procure-ment procurement documents contained these requirements. The licensee deleted the design procurement requirements and accepted the replacement parts.

This is a Severity Level IV (Supplement II.d) (50-382/8504-01).

B.

Licensee Procedures for Maintenance of Equipment Qualification and Procurement of Spare Parts 10 CFR Part 50, Appendix B, Criterion V, requires, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."

Contrary to the abr ve, the licensee did not have procedures which:

1.

Verified supplier acceptance of, and certification of compliance (where required), of changes to safety-related purchase orders which affect design or quality.

2.

Required design change review, including 10 CFR 50.59 review, for Purchase Order major exceptions which delete technical or quality requirements contained in Architect Engineer (AE) or other design specifications used to assure the design base upon which the plant J

was licensed.

SuTd8A$8Ega G

L tt

. n 3.

Assured the review of previously procured spare and replacement material, parts and components, and future procurement of such parts are reviewed against the final, "as-built" Ebasco design and procurement specifications for design and quality changes which affect reactor plant safety.

4.

Implemented maintenance of equipment qualification prior to fuel load as committed in Section A6. of Revision 2 (November 1982) of LP&L's Waterford SES Unit No. 3 Response to NUREG-0588.

This is a Severity Level IV Violation (Supplement II.d) (50-382/8404-03).

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power and Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for the violations if admitted,

.(2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this 9th day of Oct., 1985.