APPENDIX A NOTICE OF VIOLATION i
i Entergy Operations, Incorporated Docket No.:
50-382 i
Waterford Steam Electric Station, Unit 3 Operating License No.: NPF-38 l
l During an NRC inspection nducted on September 19 through October 30, 1993, l
one violation of NRC requi ements was identified.
In accordance with the i
" General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, the violation is listed below.
l A.
Technical Specification 6.8.1 requires, in part, that written procedures be established, implemented, and maintained covering the activities j
i referenced in Appendix A of Regulatory Guide 1.33, Revision 2, j
February 1978.
j Section 1 of Appendix A of Regulatory Guide 1.33 requires safety-related activities to be covered by written procedures, which includes maintenance of the ultimate heat sink.
j System Operation Procedure OP-003-004, Revision 6, " Condensate Makeup,"-
i requires that the recirculation header isolation valve, CMU-1131, be l
closed after transferring water from the demineralized water storage i
tank to the condensate storage tank.
l Contrary to the above, on August 17, 1993, Valve CMU-1131 was opened and I
left in the open position until October 19, 1993. As a result of this j
misalignment, the automatic makeup system for the safety-related wet cooling tower basins did not function as designed, allowing the level of the basins to decrease to a point below the Technical Specification required minimum level.
i i
This is a Severity Level IV violation.
(Supplement I) (382/93-32-01)
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc. is hereby l
required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice of Violation l
(Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the l
corrective steps that have been taken and the results achieved, (3) the
(
corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not 1
received within the time specified in this Notice, an order may be issued to l
show cause why the license should not be modified, suspended, or revoked, or l
l 1
.f i
9312070082 931129 PDR ADOCK 050003B2 O
PDR_
l
. b
l 1 l why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
f i
Dated at Arl'ngton, Texas, dayoff 1993 l
this p g u
i
]
i o
i i
-l