Notice of Violation from Insp on 980202-12.Violation Noted: on 980211,inspector Identified That Derailer Was Not Locked in Derail Configuration,Per Plant Security Procedure PS-012-101,rev 9
ML20216E584
Person / Time
Site: Waterford 
Issue date: 03/12/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20216E562 List:
References
50-382-98-05, 50-382-98-5, NUDOCS 9803180089
Download: ML20216E584 (2)


Text

.

E.NCLOSURE1 NOTICE OF VIOLATION Entergy Operations, Inc.

Docket No.:

50-382 Waterford Steam Electric Station, Unit 3 License No.: NPF-38 During an NRC inspection conducted on February 2-6 and 10-12,1998, one violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

License Condition 2.E of the Waterford Steam Electric Station, Unit 3, Operating License NPF-38, dated December 19,1995, requires that the licensee fully implement and maintain in effect the Commission approved Physical Security Pian, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p).

Watelford 3 Physical Security Plan, Revision 17, dated March 1996, Chapter 3, paragraph 3.2.6, " Vehicle Denial," states, in part, " Railroad derailers are installed inside the protected area on the railroad spurs that enter the site."

Plant Security Procedure PS-011-103, " Vehicle Access Control," Revision 8, Section 5, paragraph 5.1.3.2.C, states, in part, " Railroad derailers are installed inside the protected arca on rail spurs that allow entry into the protected area."

Plant Security Procedure PS-012-101, " Perimeter Barriers," Revision 9, Section 5.6, paragraph 5.6.1, states, " Security Officers will inspect the derailers to ensure that they are locked in the derail configuration. This check will be made twice each shift."

Contrary to the above, on February 11,1998, the inspector identified that the derailer was not locked in the derail configuration. This degraded condition had existed since November 11,1997.

This is a severity level IV violation (Supplement Ill)(382/98-05-03).

Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc., is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulator / Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV. 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (a) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not

)

9803180089 980312 i

PDR ADOCK 05000382 G

PDR

. be taken Where good cause is shown, consideration will be given to extending the response time.

If you contest this enforcement action, you should also provide a copy of your response to the Director. Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

i Because your resoonse will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction, if personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected ond a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of informatien will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, p! ease provide the level of protection described in 10 CFR 73.21.

Dated at Arlington, Texas this 12th day of March 1998 l