APPENDIX A NOTICE OF VIOLATION Entergy Operations, Incorporated Docket:
50-382 Waterford Steam Electric Station, Unit 3 License: NPF During an NRC inspection conducted June 7-11, 1993, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:
Technical Specification 6.13.1 requires that the licensee have an approved Process Control Program.
Administrative Procedure RW-001-210, " Process Control Program,"
Revision 5, Section 5.4.1.2 requires that annual analysis be performed on the waste streams to determine the isotopic abundance of gamma emitting isotopic in the streams as described in Reference 2.2.8 (RW-002-110, " Waste Sample Collection and Isotope Evaluation").
Technical Procedure RW-002-110, " Waste Sample Collection and. Isotope Evaluation,"
Section 10.1.8, states, in part, "In order to meet the-requirements of 10 CFR 61 for classification of radioactive wastes, Waterford 3 will conduct a program for implementing the waste classification system.
This program.... includes periodic offsite
[ sample] analysis, at least annually and/or whenever system changes.
[ occur] that could impact radionuclide concentration, for all nuclides listed in 10 CFR 61.55 for all waste streams."
Section 10.2.3 lists the chemical volume control system filters as an example of a waste. stream.
Contrary to the above, the inspector determined on June 11, 1993, that the chemical volume control system filter samples were not collected and submitted for offsite analysis between November.1990 and August 1992.
l This is a Severity Level IV violation (Supplement IV) (382/9210-01),
~
Pursuant. to the provisions of 10 CFR Section 2.201, Entergy Operations, Inc.,
is hereby required to. submit a written statement or explanation to the 4
U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk,-
Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This' reply.should be clearly marked as a " Reply to a Notice of Violation" and :should include :for each violation:
(1) the reason for the violation, or, if. contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in
- this Notice, an order or demand for information may be issued as to why'the' license should not be modified, suspended, or revoked, or why such other i
9306290034 930624
~
PDR ADOCK 05000382 O
< l action as may be ' proper should not be taken. Where good cause is shown, consideration will be given to extending the response time..
' Dated at' Arlington, Texas, this 24th day of June 1993 t
6 S
i I
.?l i
. - -