Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments ML17313A7671999-01-15015 January 1999 Forwards LER 96-003-00 Prepared & Submitted Pursuant to 10CFR50.73.LER Reports TS Violation Involving Nuclear Power Channel Calibrations,Due to Precedural Deficiency 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML17305B0681990-09-17017 September 1990 Forwards Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Exam Dates,Anticipated Number of Candidates & Requalification Exam Schedules for FY91-FY94 Also Encl ML17305B0491990-09-12012 September 1990 Forwards Palo Verde Nuclear Generating Station Unit 2 Steam Generator Eddy Current Exam,Second Refueling Outage Apr 1990. ML17305B0281990-08-27027 August 1990 Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d) ML17305B0111990-08-15015 August 1990 Responds to Request for Addl Info Re Emergency Lighting,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25. Availability Info Provided in Ref 2,most Appropriate Analysis of Lighting Sys Availability ML17305B0021990-08-0909 August 1990 Provides Update on Status of Record 546 post-restart Item, Per 900412 Ltr.Record Will Revise Procedures for Analyzing & Disseminating Incident Investigation,Operations & Maint Experience to Appropriate Dept ML17305A9871990-08-0303 August 1990 Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25 ML17305A9791990-07-31031 July 1990 Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated ML20056A4161990-07-31031 July 1990 Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790) ML17305A9831990-07-27027 July 1990 Requests Temporary Waiver of Compliance from Limiting Condition for Operation 3.6.3 to Allow Corrective Maint to Be Performed on Main Feedwater Isolation Valves by Extending Allowed Outage Time to 12 H Instead of 4 H ML20055J1031990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances ML17305A9771990-07-25025 July 1990 Forwards Status of Corrective Actions to Min Multiple Control Element Assembly Drop Events at Plant.Insp of Insulation Coils & Replacement of Defective Coils for Units 1 & 2 Completed ML20055J1711990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances for Plant,Per 10CFR50.75(b) & 50.33(k)(2) ML20055J2671990-07-25025 July 1990 Forwards Info Constituting Decommissioning Financial Assurance Certification Rept,Per 10CFR50.33(k)(2) & 50.75(b) ML17305A9411990-07-20020 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. ML17305A9431990-07-17017 July 1990 Forwards Rev 1 to Palo Verde Nuclear Generating Station Annual Radiological Environ Operating Rept for 1987. Rev Results from Internal Review Bu Nuclear Safety Group & Audit Performed by Radiation Protection Stds ML17305A9601990-07-13013 July 1990 Forwards Preliminary Response Re Justification for Continued Operation of Fire Protection Sys Equipment,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25 ML17305A9331990-07-12012 July 1990 Discusses Util Compliance w/fitness-for-duty Program Implementation.Lab Specialists,Inc Audited & Monitored W/ Satisfactory Results.Ltr of Agreement Has Been in Place Since 900202 ML17305A9391990-07-0909 July 1990 Forwards Endorsement 44 to Maelu Policy MF-116 & Endorsement 62 to Nelia Policy NF-266 ML17305A9341990-07-0909 July 1990 Submits Results of 900514-18 NUREG-1220 Audit,Per NRC 900608 Request,Per Insp of Plant.Remaining Licensed Operators Found to Be in Conformance W/Medical Exam Requirements of 10CFR50.55 ML17305A9151990-06-29029 June 1990 Forwards Emergency Lighting Failure Data Update,Per 900621 Request ML17305A9061990-06-26026 June 1990 Suppls 891114 Response to Violations Noted in Insp Rept 50-528/89-16.Application for Amend to License NPF-41 Will Be Submitted in Oct 1990 to Permit Lower Flow Rate for RCS & Shutdown Cooling Sys ML17305A9111990-06-25025 June 1990 Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues. ML17305A9081990-06-25025 June 1990 Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates ML17305A9051990-06-25025 June 1990 Forwards Endorsement 45 to Maelu Policy MF-116 & Endorsement 63 to Nelia Policy NF-266 ML17305A9171990-06-24024 June 1990 Confirms Compliance W/Agreed Upon Course of Action for Restart of Facility as Outlined in 891224 Ltr & Completion of Items Contained in Restart List Provided as Attachment to 900111 Ltr ML17305A9121990-06-24024 June 1990 Forwards Discharge Test Voltage Curve,Per 900623 Request for Completion of Emergency Lighting Exide Power Supply Prior to Entry Into Mode 2 ML17305A8961990-06-20020 June 1990 Responds to NRC 900521 Ltr Re Violations Noted in Insp Repts 50-528/90-12,50-529/90-12 & 50-530/90-12.Corrective Action: Wiring in PPS Cabinets & Cabinet Drawers Reworked in Accordance W/Approved Work Authorization Documents ML17305A9041990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite IR 05000528/19900021990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A8891990-06-15015 June 1990 Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions ML17305A8871990-06-14014 June 1990 Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36 ML17305A8731990-06-0808 June 1990 Responds to Bulletin 88-005 Re Product Forms Other than Fittings & Flanges for Plant.Significant Number of Lugs Delivered to Plant.Util Should Be Notified,If NRC Previous Review of Records Has Identified Other Product Forms ML17305A9421990-06-0101 June 1990 Forwards Pinnacle West Response to State of Az Corp Commission Complaint Filed W/Us Securities & Exchange Commission on 900521,to Revoke Exemption from Public Utils Holding Co Act ML17305A8571990-05-31031 May 1990 Forwards Amended Pages of Feb,Mar & Apr 1990 Monthly Operating Repts for Palo Verde Nuclear Generating Station Unit 2 ML17305A8391990-05-31031 May 1990 Forwards 1990 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ML17305A8661990-05-31031 May 1990 Forwards Projected 1990 Cash Flow Statements ML17305A8201990-05-23023 May 1990 Provides Status of Improvements to Eliminate Possibility of Multiple Control Element Assembly Drop Events.Licensee Developed Mod to Ground Fault Detection Sys to Assure Continuous Monitoring & Annunciation of Any Future Faults ML20043B6421990-05-19019 May 1990 Forwards Amend 26 to Security Plan.Amend Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML17305A7841990-05-15015 May 1990 Forwards Special Rept 2-SR-90-002 Re Steam Generator Tube Plugging Due to Inservice Insp Activities.Twenty Tubes Plugged in Steam Generator 1 & ninety-one Tubes Plugged in Steam Generator 2 ML17305A8721990-05-14014 May 1990 Forwards Arizona Corp Commission Complaint Filed W/Us Securities & Exchange Commission Seeking Revocation or Mod of Exemption of Pinnacle West Capital Corp.Complaint Wholly W/O Merit ML17305A7621990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-528/90-03,50-529/90-03 & 50-530/90-03.Corrective Actions: Night Order Written for Guidance on Use of Instrumentation W/Maint Tag Present ML17305A7921990-05-0808 May 1990 Forwards Public Version of Rev 2 to EPIP-14, Dose Assessment. W/900523 Release Memo ML20043A0511990-05-0303 May 1990 Forwards Public Version of Revised Epips,Including Procedure Change Notice 11 to Rev 12 to EPIP-04 & Procedure Change Notice 1 to Rev 6 to EPIP-15 ML17305A7421990-05-0303 May 1990 Responds to 900330 Enforcement Conference Re Violations Noted in Insp Repts 50-528/90-04,50-529/90-13 & 50-530/90-13.Corrective Action:Special Locking Mechanisms Installed on Currently Posted Radiation Area Doors & Gates ML17305A8861990-04-30030 April 1990 Forwards EPIP Update,Including Rev 7 to EPIP 02,Rev 12 to EPIP 03 & Rev 9 to EPIP 20.W/o Encl ML17305A7381990-04-30030 April 1990 Forwards Annual Environ Operating Rept for 1989 & Annual Rept for Salt Deposition Monitoring Program 1989. ML17305A7131990-04-20020 April 1990 Responds to NRC 900321 Ltr Re Violations Noted in Insp Rept 50-530/90-08.Corrective Action:Plant Guideline Providing Addl Guidance Re Prioritization of Work Promulgated ML17305A6891990-04-16016 April 1990 Forwards Rev to Cycle 3 Reload Analysis Rept,Submitted 891024.Rev Reflects Early end-of-cycle Unit Shutdown & Replacement of Eight New Fuel Assemblies ML17305A7011990-04-12012 April 1990 Forwards Rev 3 to Palo Verde Nuclear Generating Station Post-Restart Actions, Per JB Martin 891224 Ltr ML17305A7081990-04-0909 April 1990 Forwards post-exam Security Agreements for Dk Hendrick, D Ensign,M Alavi & Author.Agreement Certifies That Signatories Will Not Divulge Info Re 900320 Exams 1990-09-17
[Table view] |
Text
_
Arizona Nuclear Power Project P O. box 52034
July 10, 1985 il2G;CNV!SE U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. 50-530 NRC Violation 50-530/85-09/06 NRC Deviation 50-530/85-09/03, 05 File: 85-019-026; D.4.33.2
Reference:
Ietter from D. F. Kirsch (NRC) to E. E. Van Brunt, Jr. (ANPP),
dated June 11, 1985,
Subject:
NRC Inspection Report 50-529/85-14, 50-530/85-09 NRC Inspection of Palo Verde Units 2 and 3
Dear Sir:
This letter refers to the inspection conducted by Messrs.
M.
Pe ranich, S.
Stein, and K.
Hooks on March 25-29, 1985.
Based on the results of this inspection, one Notice of Violation and one Notice of Deviation were issued concerning the new fuel racks in Unit 3, classification of components listed in the FSAR and cable tray design.
Our responses to the Notice of Violation and the Notice of Deviation are provided as Attachments A and B, respectively.
Very truly yours, IIVomb
&/
m E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/TRB/jle Attachments cc:
A. C. Gehr (All with Attachments)
E. A. Licitra R. P. Zimmerman R. C. Sorenson 8507300357 850725 PDR ADOCK 05000530 0
PDR I
t ATTACHMENT A NRC NOTICE OF VI01ATION 50-530/85-09/06 10CFR 50, Appendix B, Criterion V, as implemented by Section 17 of the FSAR states in part that " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings and shall be accomplished in accordance with instructions procedures or drawings."
Joseph Oat Corporation Drawing No. 6676 " Typical Module-New Fuel Racks" states in the general inspection notes that all welds shall be visually examined-per Quality Control Procedure No. QC-8012-60, " Visual Examination of Welds."
Quality Control Procedure No. QC-8012-60 states in Section 5.0,
" Acceptance Standards" that "Ihe weld surface and adjacent base material shall. be essentially free of weld splatter and slag and shall bc free of are strikes,"
and that "The minimum size of fillet welds shall be as indicated on the shop drawings."
Contrary to the above, new fuel rack modules, lA3, 1B1, 1B2, 1B3, 1El, and 1E2, intended for installation in Unit 3 were found to have vendor welds exhibiting areas of incomplete fusion, slag, unconsumed filler material, undercut, spatter, lack of penetration, etc.
All welding identified above was inspected and accepted by Quality Control inspectors of the Joseph Oat Corporation for module IA3 on July 21, 1980, for modules 1B1,1B2, and 1B3 on August 6, 1980, and for modules 1El and 1E2-on December 4, 1980.
Mr. D. F. Kirsch ANPP-32994 Attachment A Page Two 1.
Corrective Steps Which Have Been Taken and the Results Achieved Representatives from Combustion Engineering (CE), Bechtel and Joseph Oat Corporation have performed a preliminary examination of the six (6) Unit 3 new fuel racks identified in the subject violation.
The examination identified conditions similar to those which were identified by the NRC relative to the welding.
Also, two 3" welds located behind the backing plate (Joseph Oat drawing 6678 and 6679) are missing on several racks.
NCR WC-1321 was issued to document the identified conditions and was interimly dispositioned to inspect the new fuel racks.
The following action will be taken to evaluate the conditions discovered on the new fuel racks.
A re-analysis of the Joseph Oat report, " Stress Analysis of Fuel Storage Racks for ANPP PVNGS," will be performed using the original design criteria indicated in the purchase order to establish the minimum design welding configuration.
The re-analysis will include the missing welds identified during the visual examination.
CE will be responsible for the performance of a weld inspection of the Unit 3 new fuel racks to. determine the compatibility of the existing conditions to that of the assumptions made in the re-analysis.
Based on the combined results of the re-analysis and weld inspection, CE will' recommend action on the nonconformance conditions which presently exist on the new fuel racks.
CE will be responsible for weld inspection of the new fuel racks in Units 1 and 2 as required.
The criteria for these additional inspections will be defined based on the results of the weld inspection for Unit 3.
CE will be responsible for a sample review and inspection of other Joseph Oat-supplied equipment to PVNGS.
The root causes of the noted conditions and subsequent violation have been determined to be:
1.
Discrepancies between the Acceptance Standards as defined in Section 5.0 of the Joseph Oat Corporation Quality Control Procedure for. Visual Examination of Welds, 8012-60, Rev.
O, and the actual as-built weld conditions were not identified during the review process.
L
Mr. D. F. Kirsch ANPP-32994 Attachment A Page Three 2.
CE's Quality Assurance program failed to reveal that a potential existed at Joseph Oat Corporation for a breakdown in this vendor's Quality Control program.
2.
Corrective Steps Which Will Be Taken to Avoid Further Items of Nonconformance To address the root causes of this condition the following actions will be performed:
1.
Joseph Oat Corporation will review their in-house Quality Control program which was used in the fabrication of the new fuel racks.
The intention of this review is to identify what deficiencies existed in that program at ' the time the new fuel racks were fabricated which could have resulted in the failure to meet approved inspection standards.
CE will perform a review of Joseph Oat findings to ensure the adequacy of the Joseph Oat Quality Control program and any necessary Joseph Oat corrective actions.
2.
CE will review in-depth the Joseph Oat Quality Control Inspection procedure for Visual Examination of Welds to determine the adequacy of the procedure as applied to the new fuel racks.
Appropriate corrective action will be identified and taken, as necessary.
3.
CE will evaluate their own Quality Assurance program to determine if their existing procedures for qualification and in-shop surveillance of a vendor to CE Specifications No. 00000-WQC-5.1,
" Vendor' Quality Control Specification for Power Supply Group (PSG)
Quality Class 2A," is adeciuate.
3.
Date When Full Compliance Will be Achieved The re-analysis of the stress report, performance of the Unit 3 new fuel racks weld inspection, sample review and inspection of other equipment supplied by Joseph Oat to PVNGS, and the actions to address the root causes are expected to be completed by August 15, 1985.
Nonconforming conditions identified during the Unit 3 weld inspection will be corrected, as necessary, prior to fuel receipt for Unit 3.
Weld inspection of the new fuel racks for Units 1 and 2 will be performed.
as necessary, based on the results of the re-analysis and Unit 3 weld inspections.
If necessary, this action will be completed prior to the storage of any additional new fuel received for the respective units.
m ATTACHMENT B NOTICE OF DEVIATION 50-530/85-09/05 and 03 1.
The Palo Verde-FSAR in Table 3.2-1,
" Quality Classification of Structures, Systems and Components,"
lists the quality assurance classification for new fuel racks as being Quality Class Q and Seismic Category I.
Additionally, page 3.2-37, note No.
4, of the FSAR states that - Quality Assurance Class (Q) requires compliance with 10CFR 50, Appendix B.
Contrary to the above, under its contract 'with Bechtel Corporation, the licensee's prime contractor, Combustion Engineering procured new fuel racks from a subvendor, Joseph Oat Corporation, under Combustion Engineering Specification No.
00000-WQC-5.1,
" Vendor Quality Control Program Specification for PSG Quality Class 2A."
Items designated by Combustion Engineering as Class 2A do. not have a Quality Assurance Program applied which provides for compliance with 10CFR 50 Appendix B.
2.
Contrary to the current approved design of Drawing 13-E-ZAC-043 Revision 17 and Design Change Package 3CC-ZJ-038, a vertical member of cable tray hanger No. H106 in the. Unit 3 lower cable spreading room is not located within one inch of the structural steel center line and was not identified nor analyzed as required by the Design Qiange Package.
T
,-,, J. -
IMr. D. F. Kirsch ANPP-32994
-Attachment B Page Dro 50-530/85-09/05 1.
Corrective Steps Which Have Been Taken and the Results Achieved An investigation ' was initiated to determine what quality program CE applied to the fabrication. of the new fuel racks.
The racks are designated in the' FSAR as being Quality Class "Q"
and Seismic Category I.' The following are the results of the investigation.
CE has identified that the new fuel racks are designed to store new fuel in a noncritical configuration.
To fulfill this function, the new fuel racks are required to remain intact following a seismic event while maintaining the_ minimum surface-to-surface separations between bundles under all of the following conditions:
1.
A fuel assembly dropped.from a height of 2.0 feet, which then falls horizontally across the top of the rack (Note:
a subsequent fuel rack modification has been completed to provide suitable structural support to withstand a fuel assembly dropped from a height of 4.5 feet);
2.-
Safe Shutdown Earthquake (SSE);
3.
A tensile load of 5,000 pounds on any one cavity; 4.
Fabrication tolerances; 5.
Fully loaded rack.
The design analysis was_. performed by CE's subvendor, Joseph Oat Corporation and was reviewed and approved by CE.
Since the new fuel racks are not credited with preventing or mitigating the consequences of any postulated accidents, they were designed and constructed in accordance with the CE Power Supply Group (PSG) Quality Class 2 Specification - WQC-5.1.
The new fuel racks were classified as PSG Quality Class 2A and are appropriately qualified as Seismic Category I.
CE has documentation to support this position.
The CE 2A Quality Program includes procedural controls and requirements for vendor approval, qualification of welders, use of approved welding procedures, inspection and test, material traceability, and corrective actions.
CE and' their subvendor, Joseph Oat Corporation, have a complete record of all inspections, tests and procedures involved in the rack manufacturing process.
-Mr. D. F. Kirsch ANPP-32994 Attachment B Page Ihree To clarify the Palo Verde FSAR, Table 3.1-1,
" Quality Classification of Structures, Systems and Components," a SAR Change Notice will be initiated to add a footnote clarifying the actual Quality Assurance program for the new fuel racks.
The Quality Assurance program does not fully meet the criteria of 10CFR-50 Appendix B.
However, since the only safety related function of these racks is to maintain the minimum surface-to-surface separation between fuel bundles, a modified QA program is acceptable.
The
- design, specific components, and fabrication processes critical to the structural integrity of the fuel racks provide that this equipment will withstand the effects of the SSE and remain functional as per Regulatory Guide 1.29.
2.
Corrective Steps Which Will Be Taken to Avoid Further Items of Nonconformance The apparent cause of this deviation was the inconsistencies between the Quality Class called for in the FSAR and the Quality Program implemented by CE.
Consequently, Bechtel Engineering has begun a review of the CE documentation for the FSAR safety-related components provided by CE to determine if any other quality classification inconsistencies exist.
3.
Date When Full Compliance Will Be Achieved The SAR Change is expected to be approved by ANPP by September 1, 1985.
The Engineering review of the CE documentation is also expected to be completed by September 1, 1985.
At that time, any additional required actions will be planned and scheduled for resolution as needed.
r.
.o r Mr. D. F. Kirsch ANPP-32994 Attachment B
.Page Four 50-530/85-09/03 1.
Corrective Steps Which Have Been Taken and the Results Achieved At.the_l time of the NRC Inspection, Bechtel Engineering conducted a preliminary review of hanger No.
H106 and concurred with the NRC Inspector. that the condition did not meet design requirements.
A subsequent in-depth review has shown (as describe'd below) that incorrect conclusions were reached during the preliminary review with the NRC Inspector.
Engineering has performed a verification inspection of the support.
This support is a vertical column member supported by a slab floor and only attached at. the top to. a structural steel beam to provide lateral stability.- An engineering review has determined that it is acceptable to attach the top end of column supports to beam. members without regard to the offset from the structural steel beam vertical centerline because the
~
slab floor carries the column support dead. weight in ~ lieu of the beam member.
The concern is with torsion on horizontal structural steel beam members aused by the dead weight of hangers. located offset:from the beam centerline.
Therefore, the support is acceptable as' is, and no further action is required for Units 1, 2, or 3.
2.
Corrective Steps Which Will Be Taken' To Avoid' Further Items of Noncompliance
~
Engineering will revise Note 13 on Drawing 13-E-ZAC-043 to clarify that the one-inch offset limitation is applicable to hangers exclusively supported off structural steel.
Engineering has reviewed other applicable raceway drawings and has determined that no other revisions are necessary.
3.
Date When Full Compliance Will Be Achieved Drawing 13-E-ZAC-043 will be revised by DCN-by July 12, 1985.