Responds to NRC Re Violations Noted in Insp Repts 50-348/85-05 & 50-364/85-05.Corrective Actions:Properly Rated Links Installed on All Containment Cooler Dropout Plates in Unit 2
ML20127N903
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/25/1985
From: Mcdonald R
ALABAMA POWER CO.
To: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20127N890 List:
References
NUDOCS 8505230641
Download: ML20127N903 (2)


Text

- -

g* .. Camng Address

  • Alibama Power Company 600 North 18th Street Post Office Box 2641 Birmingham l Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice rresident  % {.gR aJg c p .}cu Flintridge Building AlabamaPower me L ren ear c sfwu March 25, 1985 Docket No. 50-348 Docket No. 50-364 Mr. D. M. Verrelli U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, GA 30323

SUBJECT:

J. M. Farley Nuclear Plant NRC Inspection of January 11 - February 10, 1985 RE: Report Numbers 50-348'/85-05 50-364/85-05

Dear Mr. Verrelli:

This letter refers to -the violation, cited in the subject inspection reports, which states:

"The following violations were identified during an inspection conducted on January 11 - February 10, 1985 The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 50, Appendix B, Criterion VIII, requires measures to be established for identification and control of materials, parts, and components. These measures shall be designed to prevent use of incorrect material, parts and components. Section 8.4.1 of the Operations Quality Assurance Manual requires verification of identification incident to item replacement.

Contrary to the above, measures were not established to verify identification incident to item replacement in that incorrect fusible links were installed on the 28 and 2C containment building coolers.

This is a Severity Level IV violation (Supplement I)."

G505230641 850404 PDR ADOCK 05000348 O PDR

T: ..

tg .; . . . ..)

- Mr. .D. M. Verrelli

March 25,>1985-Page Two

. Admission or Denial The above- violation _ occurred as' described in .the subject report.

~

Reason for Violation Several links- had been replaced in the 28 and 2C coolers on 11-26-82.

It could not be determined which links were replaced, nor the source of the replacement links. Therefore, the incorrect 160 F -links.may have been

. installed on the above date, or may have been installed during construction.

. Correct'ive Action Taken and Results Achieved Properly- rated links were installed on all containment cooler dropout plates in Unit' 2. A review of Unit I records indicates that all links that-

-have been replaced are of the correct rating.- However, all links will be inspected in the April 1985 refueling outage.

-Corrective Steps Taken to Avoid Further Violations A Maintenance Procedure will be written covering installation and inspection of containment cooler fusible links.

Date'of Full Compliance April 30,1985 Affirmation I affirm that this response is true and complete to the best of my knowledge, information and -belief.

The'information contained in this letter is not considered to be of a proprietary nature. -

Yours very truly, d N ,

R. P.-Mcdonald ,

RPM: sam /F-2