BSEP-84-2619, Forwards Monthly Operating Repts for Nov 1984 & Corrected Monthly Operating Repts for Aug,Sept & Oct 1984 for Unit 1

From kanterella
(Redirected from ML20114A267)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Nov 1984 & Corrected Monthly Operating Repts for Aug,Sept & Oct 1984 for Unit 1
ML20114A267
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/03/1984
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20114A269 List:
References
BSEP-84-2619, NUDOCS 8501280041
Download: ML20114A267 (1)


Text

l P.

e ,a

,c

_ . . .w . v . . m _ .

Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 December 3, 1984 FILE: B09-13510C SERIAL: BSEP/84-2619 Mr. R. C. DeYoung, Dir'ector Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1984.

Also included are the~ corrected Operating Data Reports for the months of August, September, and October 1984 for Brunswick Unit 1. This completes the resolution of the problem with that unit's gross thermal energy generation values as noted in the October 5, 1.984, transmittal to you.

Very truly yours, dty C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/jlh/LETCG i Enclosures cc: Ms._J. C. Baker 3 ' .!

irFMSRISBidM':i/2:/

M g gj111S kESIGg[TED ORIG Mr. J. L. Harness Mr. S. W. EcDowell ).g [

Mr. J. P. O'Reilly CdT #d I INPO 8501280041 841203 ~

PDR ADOCK 05000324 R PDR