Corrected Monthly Operating Repts for Aug 1984
ML20114A282
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/31/1984
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20114A269 List:
References
NUDOCS 8501280051
Download: ML20114A282 (1)


Text

4 OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 11/20/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.

UNIT NAME: BRUNSWICK UNIT 1 i N'OTES I

2.

REPORTING PERIOD: AUGUST 84 I

i 3.

LICENSED THERMAL POWER (MWT): 2436 I

i 4.

NAMEPLATE RATING (GROSS MWE): 867.0 l

I 5.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 1

I 6.

MAX DEPENDABLE CAPA. CITY (GROSS MWE): 815.0 l I

7.

MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 5855.00 65376.00
12. NUMBER OF HOURS REACTOR CRITICAL 704.13 5233.45 41631.43
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 687.08 5100.80 39189.33.
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1569857.79 11885532.42 80312826.99
17. GROSS ELEC. ENERGY GEN. (MWH) 514820.00 3950886.00 26497937.00
18. NET ELEC. ENERGY GENERATED (MWH) 499334.00 3836161.00 25450001.00
19. UNIT SERVICE FACTOR 92.35 87.12 59.94
20. UNIT AVAILABILITY FACTOR 92.35 87.12 59.94
21. UNIT CAP. FACTOR (USING MDC NET) 84.96 82.94 49.28
22. UNIT CAP. FACTOR (USING DER NET) 81.75 79.80 47.42
23. UNIT FOxCED OUTAGE RATE 7.65 8.33 21.47
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY

~~

INITIAL ELECTRICITY COMMERCIAL OPERATION 85012800g1Bg0 i

R 1.16 - 9