i OPERATING DATA REPORT DOCKET'NO. 050-0325 DATE 11/20/84 COMPLETED BY FRANCES HARRESON
^
TELEP' HONE (919)457-952 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2.
REPORTING PERIOD: SEPTEMBER 84 I
I 3.
LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
i 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
i 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10 REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 720.00 6575.00 66096.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 584.85 5818.30 42216.23
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 551.25 5652.05 39740.58
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1208819.20 13094351.62 81521646.19
- 17. GROSS ELEC. ENERGY GEN. (MWH) 401745.00 4352631.00 26899682.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 388170.00 4224331.00 25838171.00
- 19. UNIT SERVICE FACTOR 76.56 85.96 60.13
- 20. UNIT AVAILA.BILITY FACTOR 76.56 85.96 60.13
- 22. UNIT CAP. FACTOR (USING DER NET) 65.67 78.26 47.61
- 23. UNIT FORCED OUTAGE RATE 23.44 10.06 21.50
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION R
1.16 - 9
.