ML20114A301
Jump to navigation
Jump to search
| ML20114A301 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/31/1984 |
| From: | Harrison F CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20114A269 | List: |
| References | |
| NUDOCS 8501280060 | |
| Download: ML20114A301 (1) | |
Text
.-
c OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 11/20/84 COMPLETED BY FRANCES HARRISON l TELEPHONE (919)457-952' OPERATING STATUS 5 NOTES 5
1.
UNIT NAME: BRUNSWICK UNIT 1 2.
REPORTING PERIOD: OCTOBER 84 I
i 3.
LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
i 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 745.00 7320.00 66841.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 691.10 6509.40 42907.38
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 677.90.
6329.95 40418.43
- 15. UNIT RESERVE SHUTDOWN HOURS.
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1573657.95 14668009.57 83095304.14
- 17. GROSS ELEC. ENERGY GEN. (MWH) 522770.00 4875401.00 27422452.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 506212.00 4730543.00 26344383.00
- 19. UNIT SERVICE FACTOR 90.99 86.47 60.47
- 20. UNIT AVAILABILITY FACTOR 90.99 86.47 60.47
- 22. UNIT CAP. FACTOR (USING DER NET) 82.76 78.71 48.01
- 23. UNIT FORCED OUTAGE RATE
.00 9.08, 21.21
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 23. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8501280060 841203 PDR ADOCK 05000324 R
PDR 1.16 - 9
,