Suppls Response to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06 Re Locked High Radiation Area Boundary.Three Options to Eliminate Design Problems W/Locked High Radiation Boundaries Will Be Submitted by 900817
ML20055D045
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 06/29/1990
From: Harness J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-90-0459, BSEP-90-459, NUDOCS 9007030139
Download: ML20055D045 (1)


Text

. . ..

e Carolina Power & Light Company Brunswick Nuclear Project P. O. Bax 10429 Southport, N.C. 28461-0429 June 29, 1990 FILE: B09-13510C 10CFR2.201 SERIAL: BSEP/90-0459 U.S. Nuclear Regulstory Commission ATTN: Document Control Desk Washington, D. C. 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 i LICENSE NCS. DPR-71 AND DPR-62 SUPPLEMENTAL RESPONSE TO INFRACTIONS OF NRC REOUIREMENTS Gentlemen:

The NRC issued to Carolina Power and Light Company a Notice of Violation concerning locked high radiation area boundary violations at the Brunswick Steam Electric Plant (BSEP) in NRC Inspection Report 50-325/90-06 and 50-324/90-06. In the Company's April 16, 1990 response, CP&L committed to provide a supplemental response by June 29, 1990 detailing additional corrective actions considered necessary following a Human Performance Evaluation (HPE) assessment for the involved events.

Based on the HPE assessment and input from the CP&L Nuclear Engineering Department (NED), three options are being considered to eliminate design problems identified with various locked high radiation barriers. BSEP is evaluating the recommended options, and by August 17, 1990 will provide a response to the NRC detailing the results of the evaluation, along with a proposed schedule-for implementation of the recommended changes.

Very truly yours, t

&A.

J. L. Harness, General Manager Brunswick Nuclear Project TH/th Enclosure cc: Mr. S. D. Ebneter Mr. N. B. Le BSEP NRC Resident Office h70 ct 139 900629 OCK 0E400324 l!p

)