Revised Monthly Operating Rept for Oct 1983
ML20092C836
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/31/1983
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20092C793 List:
References
NUDOCS 8406210342
Download: ML20092C836 (1)


Text

a

f. . . .e

^

OPERATING DATA REPORT DOCKET NO. 50-285 DATE _llovember 14, 198)

- COMPLETED BY T. P. t1a tthews TELEPilONE -(402) 576-4733 OPERATING STATUS" Fort Calhoun Station Notes 1[ Uni Name:

2. Reporting Period: October, 1983 1500
3. Licensed Thermal Power (MWt):

4.~ Nameplate Rating (Gross MWe): 501

5. Design Electrical Rating (Net MWe): 478
6. Maximum Dependable Capacity (Gross MWe): 461
7. Maximum Dependable Capacity (Net MWe): 438
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A-

' 9. Power Level To Which Restricted,if Anv (Net MWel: N/A

, 10. Reasons For Restrictions. If Any: lione This Month Yr. to-Date Cumulative ll. Hours in Reporting Period 745.0 7,297.0 88,538.0

12. Number Of Hours Rescror Was Critical 745.0 5,039.0 68,429.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
14. Hours Generator On Line 745.0 4,941.0 67,938.5
15. Unit Resene Shutdown Hours 0.0 0.0 ~ 0.0
16. Gross Thermal Energy Generated (MWH) 1,106,546.6 7,004,502.2 84,621,050.6 17 Gross Electrical Energy Generated (MWil) 355,004.0 2,207,054.0 27,630,533.7
18. Net Electrical Energy Generated (MWH) 338,049.9 2,095,551.9 26,425,586.3
19. Unit Senice Factor 100.0 67.7 76.7
20. Unit Availability Factor 100.0 67.7 76.7
21. Unit Capacity Factor (Using MDC Net) 103.6 65.6 65.0
22. Unit Capacity Factor (Using DER Net) 94*9 60.1 62.8
23. Unit Forced Outage Rate 0.0 1.0 3.7
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each):

1984 refuelin9 outage scheduled to start around March 3,1984

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION 8406210342 840614 pg7 ,