ML20092C836
Jump to navigation
Jump to search
| ML20092C836 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/31/1983 |
| From: | Matthews T OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20092C793 | List: |
| References | |
| NUDOCS 8406210342 | |
| Download: ML20092C836 (1) | |
Text
a;
- f....e
^
OPERATING DATA REPORT DOCKET NO.
50-285 DATE _llovember 14, 198)
- COMPLETED BY T. P. t1a tthews TELEPilONE -(402) 576-4733 OPERATING STATUS" 1[ Uni Name:
Fort Calhoun Station Notes
- 2. Reporting Period:
October, 1983 1500
- 3. Licensed Thermal Power (MWt):
4.~ Nameplate Rating (Gross MWe):
501 478
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
461 438
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A-
' 9. Power Level To Which Restricted,if Anv (Net MWel:
N/A
- 10. Reasons For Restrictions. If Any:
lione This Month Yr. to-Date Cumulative ll. Hours in Reporting Period 745.0 7,297.0 88,538.0
- 12. Number Of Hours Rescror Was Critical 745.0 5,039.0 68,429.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
- 14. Hours Generator On Line 745.0 4,941.0 67,938.5
- 15. Unit Resene Shutdown Hours 0.0 0.0
~ 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,106,546.6 7,004,502.2 84,621,050.6 17 Gross Electrical Energy Generated (MWil) 355,004.0 2,207,054.0 27,630,533.7
- 18. Net Electrical Energy Generated (MWH) 338,049.9 2,095,551.9 26,425,586.3
- 19. Unit Senice Factor 100.0 67.7 76.7
- 20. Unit Availability Factor 100.0 67.7 76.7
- 21. Unit Capacity Factor (Using MDC Net) 103.6 65.6 65.0
- 22. Unit Capacity Factor (Using DER Net) 94*9 60.1 62.8 0.0 1.0 3.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each):
1984 refuelin9 outage scheduled to start around March 3,1984
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION 8406210342 840614 PDR ADOCK 05000285 pg7,
R-PDR