t .

l ATTACHMENT I

l. OPERATING DATA REPORT l

DOCKET NO. 50-285 UNIT f0RT CALHOGN STATION i

DATE MAY 02,1996 j COMPLETED BY D. L. LIPPY OPERATING STATUS TELEPHONE (402) 533-6843

1. Unit Name: FORT CALHOUN STATION
2. Reporting Period: MARCH 1996 NOTES l 3. Licensed-Thermal Power (MWt): 1500
4. Nameplate Rating (Gross MWe): 502
5. Design Elec. Rating (Net MWe): 478 l
6. Max. Dep. Capacity (Gross MWe): 502
7. Max. Dep. Capacity (Net MWe): 478
8. If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

N/A -

9. Power Level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any:

N/A Tir*S MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period........... 744.0 2184.0 197378.0
12. Number of Hours Reactor was Critical 509.7 1949.7 155657.7~
13. Reactor' Reserve Shutdown Hours...... .0 0 1309.5- l
14. Hours Generator On-line............. 483TT 1923.1 153903.f
15. Unit Reserve Shutdown Hours......... .0 .0 .0
16. Gross Thermal Energy Generated (MWH) 641616.2 ~2796125.8 205482434.1 l
17. Gross Elec. Energy Generated (MWH).. 214702.0 948162.0 67881887.2
18. Net Elec. Energy Generated (MWH).... 203763.5 904546.6 64761915.4 1
19. Unit Service Factor................. 64.9 88.1 78.0
20. Unit Availability Factor............ 64.9 88.1 78.0
21. Unit. Capacity Factor (using MDC Net) 57.3 86.6 70.9
22. Unit Capacity Factor (using DER Net) 57.3 86.6 69.3
23. Unit Forced Outage Rate............. 6.8 1.8 4.0l;'
24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

REFUELING OUTAGE SCHEDULED TO COMMENCE ON SEPTEMBER 21, 1996, WITH A PLANNED DURATION OF 42 DAYS.

i

25. If shut down at end of report period, estimated date of startup:
26. Units in test status (prior to comm. oper.): Forecast Achieved l INITIAL CRITICALITY i INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9605200400 960515 PDR ADOCK 05000285 R PDR

4 '

i ATTACHMENT III DOCKET NO. 50-285 . .

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Fort Calhoun St. .

DATE MaY 9.1996 COMPLETED BY D. L. LiDDY TELEPHONE (402) 533-6843 REPORT MONTH March 1996

[NSh. 5.~.0et. i. (YN..

lli. lDEE$tiesi fRAAN.-[. _

(Hit $5M

$U$inseel!- NNIAml iCimponent s Y.-CAih ii N .Aisei;g s

>. .~

g - . ~ . . . -

. . ~ .

m . lDowelli sNon .

^'

In "

s e. .,

t M' w lTgeggg

~

96-01 960315 S 225.8 B 1 N/A ZZ ZZZZZZ At 1910 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.26755e-4 months <br /> on March 15, 1996, the Fort Calhoun l

Station (FCS) commenced a pre-planned maintenance outage to repair /replaceControl Element Drive Mechanism (CEDM) mechanical seals and perform other maintenance activities. On March 25, 1996, the turbine was placed on-line at 0457 hours0.00529 days <br />0.127 hours <br />7.556217e-4 weeks <br />1.738885e-4 months <br />. A nominal 100% power was achieved on March 28th.

96-02 960329 F 35.1 A 2 96-002 HC HTEXCH At 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br /> on March 29th, the reactor was l

manually tripped due to lowering condenser vacuum. -

The condenser tubes were tested, leaks identified and tubes were plugged. The plant was placed on-line on March 31st at 0442 hours0.00512 days <br />0.123 hours <br />7.308201e-4 weeks <br />1.68181e-4 months <br />.

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination F-Administrative 5 H-Other (Explain) Exhibit H - Same Source (9/77)

_ _ _ . _ _ . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _._ ____ _ _ _ _ _ ______