ML20092C811
Jump to navigation
Jump to search
| ML20092C811 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/31/1984 |
| From: | Matthews T OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20092C793 | List: |
| References | |
| NUDOCS 8406210332 | |
| Download: ML20092C811 (1) | |
Text
.
OPERATING DATA REPORT -
DOCKET NO.
50-285 DATE ADril 12, 1983 COMPLETED BY T. P. Matthews TELEPHONE f4021536-4733 OPERATING STATUS
- 1. Unit Name:
Fort Calhoun Station Notes
- 2. Reporting Period:
March, 1983
- 3. Licensed Thermal Power (MWt):
1500
- 4. Nameplate Rating (Gross MWe):
501
- 5. Design Electrical Rating (Net MWe):
478
- 6. Masimum bependable Capacity (Gross MWe).
461
- 7. Masim am Dependable Capaciay (Net MWe):
438
- 8. If Changes Occur in Capacity Ratings (items Number 3 Throulth 7) Since Last Report. Give Reasons:
H/A
- 9. Power Level To Which Restricted.lf An (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
one
~
This Month Yr..to Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0
~
83,401.0 64,110.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1.309.5
- 14. Hours Generator On.Line 0.0 0.0 62,947.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0.0 0.0 77,616,548.4
- 17. Gross Flectrical Energy Generated (MWHI 0.0 0.0 25.735.333.5
- 18. Net Electrical Energy Generated (MWH)
[~0~_,
0.0 24,330,034.4
- 19. Unit Service Factor 0.0 0.0 75.5
- 20. Unit Availability Facto, 0.0 0.0 75.s l
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 63.4
- 22. Unit Capacity FactorIUning DER Net 1 0.0 0.0 63.0
- 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
April 7, 1983
- 26. Units in Test Status (Prior ta Commercial 0perationi:
N/A Forecast Achiesed INITIAL CRITICALITY INITI.\\L ELECTRICI TY CO\\l%IERCIT L OPFR A TION oh (9/77i