ML20092C811

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1983
ML20092C811
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/31/1984
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20092C793 List:
References
NUDOCS 8406210332
Download: ML20092C811 (1)


Text

.

OPERATING DATA REPORT -

DOCKET NO.

50-285 DATE ADril 12, 1983 COMPLETED BY T. P. Matthews TELEPHONE f4021536-4733 OPERATING STATUS

1. Unit Name:

Fort Calhoun Station Notes

2. Reporting Period:

March, 1983

3. Licensed Thermal Power (MWt):

1500

4. Nameplate Rating (Gross MWe):

501

5. Design Electrical Rating (Net MWe):

478

6. Masimum bependable Capacity (Gross MWe).

461

7. Masim am Dependable Capaciay (Net MWe):

438

8. If Changes Occur in Capacity Ratings (items Number 3 Throulth 7) Since Last Report. Give Reasons:

H/A

9. Power Level To Which Restricted.lf An (Net MWe):

N/A

10. Reasons For Restrictions.lf Any:

one

~

This Month Yr..to Date Cumulative

11. Hours in Reporting Period 744.0 2,160.0
12. Number Of Hours Reactor Was Critical 0.0 0.0

~

83,401.0 64,110.5

13. Reactor Reserve Shutdown Hours 0.0 0.0 1.309.5
14. Hours Generator On.Line 0.0 0.0 62,947.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 77,616,548.4
17. Gross Flectrical Energy Generated (MWHI 0.0 0.0 25.735.333.5
18. Net Electrical Energy Generated (MWH)

[~0~_,

0.0 24,330,034.4

19. Unit Service Factor 0.0 0.0 75.5
20. Unit Availability Facto, 0.0 0.0 75.s l
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 63.4
22. Unit Capacity FactorIUning DER Net 1 0.0 0.0 63.0
23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:
25. If Shut Down At End of Report Period. Estimated Date of Startup:

April 7, 1983

26. Units in Test Status (Prior ta Commercial 0perationi:

N/A Forecast Achiesed INITIAL CRITICALITY INITI.\\L ELECTRICI TY CO\\l%IERCIT L OPFR A TION oh (9/77i