ML20092C832

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1983
ML20092C832
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/30/1983
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20092C793 List:
References
NUDOCS 8406210341
Download: ML20092C832 (1)


Text

.

f .C

  • OPERATING DATA REPORT DCCKET NO. 50-285 DATE October 13, 1983 COMPLETED BY T. P. flatthews
. TELEPliONE -(402I M6-4733 OPERATING STATUS ~ i
1. Unit Name: Fort Calhoun Station N" '"
2. Reporting Period: September, 1983
3. Licensed Thermal Power (MWt):

1500

4. Nameplate Rating (Gross MWe): 501
5. Design Electrical Rating (Net MWe): 478

,1 6. Maximum Dependable Capacity (Gross MWe): 461

7. Maximum Dependable Capacity (Net MWe): 438 i
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

IIIA

9. Power Lesel To Which Restricted,if Anv INet MWe): fl/A ,
10. Reasons For Restrictions,if Any: lio ne - ,

This Month Yr..to Date Cumulative iI. Hours in Reporting Period 720.0 6.552.0 87.793.0 '

12. Number Of Hours Reactor Was Critical 720.0 4,294.9 67.684.9
13. Reactor Reserve Shutdown flours 0.0 0.0 1.309.5
14. Hours Generator On-1.ine 720.0 4.196.0 67.193.S
15. Unit Reserve Shutdown Hours 0.0 0.0 nn
16. Gross Thermal Energy Generated (MWil) 1.073.897.6 5.897.955.6 83.514.504.0 -
17. Gross Electrical Energy Generated (MWill 340 n5.74.0 1.852.050.0 27.275.529.7
18. Net Electrical Energy Generated (MWH) 324,093.5 1,757,502.0 26,087,536.4
19. Unit Service Factor 100.0 64.0 76.5
20. Unit Availability Factor 100.0 64.0 76.5
21. Unit Capacity Factor (Using MDC Net) 102.8 61.2 64.I3
22. Unit Capacity Factor IUsing DER Net) 94.2 56.1 62.5
23. Unit Forced Outage Rate 0.0 1.2 3.7
24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each t: "

1984 refueling outage scheduled to start around fiarch 16. 1984 and will last approximately two months.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status IPrior o Commercial Operation): Forecast Achiesed INITIA L CRITICALITY ,

INITIAL ELECTRICITY COMMERCI \ L OPER A IlON 8406210341 840614 "

PDR ADOCK 05000285 R PDR

._. .- _ - _ -