Text
7 i
LIC-97-0021 LIC-97-0002 Enclosure December 1996 Operating Data Report Revision 1 l
9702200243 970214 PDR ADOCK 05000285 R
. - -. _. ~
j, 1
ATTACHMENT I i
~
OPERATING DATA REPORT i
DOCKET NO.
50-285 UNIT FORT CALHOUN STATION DATE JANUARY 17,1997 COMPLETED BY M. L. EDWARDS l
OPERATING STATUS TELEPHONE 402-533-6929 i
j
- 1. Unit Name:
FORT CALHOUN STATION
- 2. Reporting Period:
DECEMBER 1996 NOTES I
- 3. Licensed Thermal Power (MWt): 1500
-4.
Nameplate Rating (Gross MWe):
502 l
S. Design Elec. Rating (Net MWe):
478
- 6. Max. Dep. Capacity (Gross MWe):
502]
- 7. Max. Dep. Capacity (Net MWe):
478 8.
If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:
N/A 1
- 9. Power Level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A THIS MONTH YR-TO-DATE CUMULATIVE l
- 11. Hours in Reporting Period...........
744.0 8784.0 203978.0
- 12. Number of Hours Reactor was Critical 744.0 6983.6 160691.6
)
- 13. Reactor Reserve Shutdown Hours......
.0
.0 1309.5 i
- 14. Hours Generator On-line.............
739.1 6887.3 158867.8 i
- 15. Unit Reserve Shutdown Hours'.........
.0
.0
.0 j
- 16. Gross Thermal Energy Generated (MWH) 1064592.8 9817571.7 212503880.0
- 17. Gross Elec. Energy Generated (MWH)..
361226.0 3284507.9 70218233.1
- 18. Net Elec. Energy Generated (MWH)....
344367.7 3128752.5 66986121.3
- 19. Unit. Service Factor........'.........
99.3 78.4 77.9 i
- 20. Unit Availability Factor............
99.3 78.4 77.9
- 21. Unit Capacity Factor (using MDC Net) 96.8 74.5 70.9
- 22. Unit Capacity Factor (using DER Net) 96.8 74.5 69.3
- 23. Unit Forced Outage Rate.............
.7 5.4 4.0
- 24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
j N/A If shut down at end of report period, estimated date of startup:
25.
- 26. Units in test status (prior to comm. oper.):
Forecast Achieved i
i INITIAL CRITICALITY
]
INITIAL ELECTRICITY N/A i
COMMERCIAL OPERATION 3
-.