Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1
ML20134M434
Person / Time
Site: Fort Calhoun 
Issue date: 12/31/1996
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20134M424 List:
References
NUDOCS 9702200243
Download: ML20134M434 (2)


Text

7 i

LIC-97-0021 LIC-97-0002 Enclosure December 1996 Operating Data Report Revision 1 l

9702200243 970214 PDR ADOCK 05000285 R

PDR

. - -. _. ~

j, 1

ATTACHMENT I i

~

OPERATING DATA REPORT i

DOCKET NO.

50-285 UNIT FORT CALHOUN STATION DATE JANUARY 17,1997 COMPLETED BY M. L. EDWARDS l

OPERATING STATUS TELEPHONE 402-533-6929 i

j

1. Unit Name:

FORT CALHOUN STATION

2. Reporting Period:

DECEMBER 1996 NOTES I

3. Licensed Thermal Power (MWt): 1500

-4.

Nameplate Rating (Gross MWe):

502 l

S. Design Elec. Rating (Net MWe):

478

6. Max. Dep. Capacity (Gross MWe):

502]

7. Max. Dep. Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

N/A 1

9. Power Level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any:

N/A THIS MONTH YR-TO-DATE CUMULATIVE l

11. Hours in Reporting Period...........

744.0 8784.0 203978.0

12. Number of Hours Reactor was Critical 744.0 6983.6 160691.6

)

13. Reactor Reserve Shutdown Hours......

.0

.0 1309.5 i

14. Hours Generator On-line.............

739.1 6887.3 158867.8 i

15. Unit Reserve Shutdown Hours'.........

.0

.0

.0 j

16. Gross Thermal Energy Generated (MWH) 1064592.8 9817571.7 212503880.0
17. Gross Elec. Energy Generated (MWH)..

361226.0 3284507.9 70218233.1

18. Net Elec. Energy Generated (MWH)....

344367.7 3128752.5 66986121.3

19. Unit. Service Factor........'.........

99.3 78.4 77.9 i

20. Unit Availability Factor............

99.3 78.4 77.9

21. Unit Capacity Factor (using MDC Net) 96.8 74.5 70.9
22. Unit Capacity Factor (using DER Net) 96.8 74.5 69.3
23. Unit Forced Outage Rate.............

.7 5.4 4.0

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

j N/A If shut down at end of report period, estimated date of startup:

25.

26. Units in test status (prior to comm. oper.):

Forecast Achieved i

i INITIAL CRITICALITY

]

INITIAL ELECTRICITY N/A i

COMMERCIAL OPERATION 3

-.