LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 1
| ML20203F305 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 11/30/1997 |
| From: | Edwards M, Gambhir S OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LIC-97-0191, LIC-97-191, NUDOCS 9712170342 | |
| Download: ML20203F305 (3) | |
Text
- -
t.
g 8ME 44 SMh !ah $reer Adaf Omaha, Nairaska 68102347 December 9, 1997 LIC-97-0191 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Mail Station P1-137 Washington, D.C.
20555
Reference:
Docket No. 50-285
SUBJECT:
November 1997 Monthly Operating Report (NOR)
The November MOR for Fort Calhoun Station (FCS) Unit No.1 is attached as required by FCS Technical Specification 5.9.1.
If you should have any questions, please contact me.
Sincerely, we ry,
S. K. Gambhir Division Manager-Engineering & Operations Support SKG/mle Attachments c:
Winston & Strawn E. W. Herschoff, NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector R. J. Simon, Westinghouse f
t INP0 Records Center t
TEP t
9712170342 971130 PDR ADOCK 05000285 R
'554*
Empeyment wrth Equaloppomnty 1
ATTACHMENT I v4 OPERATING DATA REPORT DOCKET NO.-
50-285 UNIT NAME FORT-CALHOUN STATION DATE December 3. 1997 COMPLETED BY M. L. ECWARDS TELEPHONE __(402) 533-6929 REPORT PERIOD: November 1997 1.-
Design Electrical Rating (Mwe-Net):
478 i
2.
Maximum Dependable Capacity (Mwe-Net):
478 OPERATING _ STATUS THIS HONTH YR TO DATE CUMULATIVE 3.
Number of Hours Reactor was Critical:
720.0 7456.9 168148.5 4.
- Num a r of Hours Generator was On-line:
720.0 7388.0 166255.8 5.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 6.
Net Electrical Energy Generated (MWH):
348251.4 3454991.1 70441112.4
g.
g.
~
= ::
ATTACEMENT II'
' DOCKET NO.'50-285-UNIT SMt!TDOWNS UNIT NAME f_ ort CalhouA 1
DATE' December 3.19G7 REPORT MONTH November 1997
' COMPLETED BY M. L. Edwards TELEPHONE (402) 533-6929' e
Duration iteasonO iNthodif) l
[
'IbseliCderective9 2 d#
@m
[if@$ hutting:.8.
1901 TD$ti2
' Type g
" ' 6/dg.;
i g
W
^ @jActhur; tem '
W[m' 5
~ '
'~"
F,::? Forced (Hours)
, ~
5iskheduled iDown~ Reactor 3
+
Prevent Recurrence
'~
None
~ (1)
(2)
Reason:
Method:
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling,
3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)-
H-Other (Explain)
OPERATIONS
SUMMARY
The Fort Calhoun Station (FCS) operated at a nominal 100% power level until November 14,1997 at 1941 hours0.0225 days <br />0.539 hours <br />0.00321 weeks <br />7.385505e-4 months <br /> when power was reduced to 851 to allow testing and repair of the main generator ~ stator cooling heat exchangers. Following testing and repair, the power level was increased reaching 100%
-on November 17, 1997 at 1816 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.90988e-4 months <br /> where it remained through month end.
During November 1997, no power operated relief valves (PORV) or primary system safety valve challenges or failures occurred.
w
-c-
.s--
-. - -,