1 e

e 4

g 0998 unaha FJkPown Deeict k Sam iah seest AW

. Onaha, Ndrada 681a? m7 November 19, 1997 LIC-97-0179 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Mail Station P1-137 Washington, D.C.

20555

Reference:

Docket No. 50-285

)

SUBJECT:

October 1997 Monthly Operating Report (MOR)

The October MOR for Fort Calhoun Station (FCS) Unit No. 1 is attached as required by FCS Technical Specification 5.9.1.

If you should have any questions, please contact me.

Singerely, h)/

S.

. Gambhir Division Manager Engineering & Operations Support SKG/mle TE'"TI [

i Attachments v-c:

Winston & Strawn E.

W. Merschoff, NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager W.

C. Walkar. NRC Senior Resident Inspect.or R.

J.

Simon, Westinghouse INPO Records Center

. r. nn n OL l]llllllllll (.)).l{].l{

9711200110 971031 PDR ADOCK 05000295 R

PDR

'5 5 '2' EnWoyrnent mth Equal 0pportunity

e o

ATTACHMENT I OPERATING DATA REF0RT DOCKET N0.

50-285 UNIT NAME FORT CALHOUN STATION DATE _ November 5. 1997 COMPLETED BY M. L. EDWARDS TELEPHONE (402) 533-6929 REPORT PERIOD: October 1997 1.

Design Electrical Rating (Mwe-Net):

478 2.

Maximum Dependable Capacity (Mwe-Net):

478 OPERATING STATUS THIS MONTH YR TO DATE CUMULATIVE 3.

Number of Hours Reactor was Critical:

745.0 6736.9 167428.5 4.

Number of Hours Generator was On-line:

745.0 6668.0 165535.8 5.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 6.

Net Electrical Energy fienerated (MWH):

_3fil'16. 6 3106739.7 70092861.0

l ATTACHMENT 11 DOCKET NO. 50-285 UNIT ShUiD0'aNS UNIT NAME Eget Calheon DATE Nove @ r 5.1M 7 REPORT MONTH Octoter 1997 COMPLETED BY M. L. Edwards TELEPHONE (402) 533-69 M -

l l

f LNo EDatef Typej,.

. Duration

-Reason'

-Hethodbf.

Mause&Correctise 2

l

~ VAction to i

F:/ Forced.

1 Hours)'

JShuttingL Prevent Recurrence 1 2

6 Scheduled-

.Down Reactor +

None

' = = '

(2)

(1)

Reason:

Method:

A-Equipment Failure (Explain) 1-Manual l

B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation l

E-Operator Training / License Examination 5-Other (Explain) l F-Administrative G-Operational Error (Explain)

H-0tner (Explain)

CPERATIONS

SUMMARY

The Fort Calhoun Station (FCS) operated at a nominal 100% power level during October 1997. On October 17. 1997. as part of the Updated %fety 1

Analysis Report (USAR) verification project. Desig-' Engineering made a preliminary determination that the station batteries may not met the eight-(8) hour loadiry requirement found in the USAR. Procedural guidance was available to reduce DC loads during a station blackout event but was not available for other design basis accidents. At 1755 hours0.0203 days <br />0.488 hours <br />0.0029 weeks <br />6.677775e-4 months <br />. plant managemer.t conservatively declared the batteries inoperable and entered Technical Specification (TS) 2.0.1. which requires the plant to be in Hot Shutdown within six (6) hours. Operations Memorandum 97-11 was immediately issued This allowed TS 2.0.1 to provide guidance to reduce DC electrical loads in accordance with existing emergency operating plan (EOP) procedures.

to be exited immediately after entry. Offsite notifications were completed as required by station procedures. See LER 97-15 for additional details.

During October 1997. no power operated relief valves (PORV) or primary system safety valve challenges or failures occurred.

/

..........;....