ML20092C798
Jump to navigation
Jump to search
| ML20092C798 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/31/1983 |
| From: | Matthews T OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20092C793 | List: |
| References | |
| NUDOCS 8406210328 | |
| Download: ML20092C798 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ -.. - _ _ _ _ _
l.
OPERATING DATA REPORT DOCKET NO. 50-285 DATE Februarv 4,1983 COMPLETED BY T. p ' n + + $. e...e' TELEPHONE (402i;TC4733 OPERATING STATUS Fort Calhoun Station Notes I. Unit Name:
- 2. Reporting Period:
danuary, 1983
- 3. Licensed Thermal Power (MWt):
1500
- 4. Nameplate Rating (Gross MWe):
501
- 5. Design Electrical Rating (Net MWe):
470
- 6. Maximum Dependable Capacity (Gross MWe):
461
- 7. Maximum Dependable Capaciay (Net MWe):
438
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since EsfReport. GiiiReasons:
The first stage blading of the hiah oressure turbine was removed after a failure of that blading in December 1982 and will be temporarily replaced with a pressure plate prior to startup following the 1983 refteling outage.
~ 9. Power Level To Which Restricted.If Ang(Net MWe): WA one
- 10. Reasons For Restrictions. lf Any:
This Month Yr to Date Cumulative II. Hours in Reporting Period 744.0 744.0 81,985.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 64,110.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
- 14. Hours Generator On Line 0.0 0.0 62,947.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (MWH) 0.0 0.0 77.616.548.4
- 17. Gross Electrical Energy Generated (MWH) 0. 0 __,.
0.0 25.735,333.5
- 18. Net Electrical Energy Generated (MWH) 0.0 0.0 24,330,034.4
- 19. Unit Service Factor 0.0 0.0 76.8
- 20. Unit Availability Factor 0.0 0.0 76.8
- 21. Unit Capacity Factor (Using MDC Neti 0.0 0.0 64.5
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 64.1
- 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
March 20, 1983
- 26. Units in Test Status IPrior to Commercial Operation D N/A Forecas Achiesed INITIAL CRITICAllrY INITI AL ELECTRICITY COMMERCIAL OPER A TION O!
I"3 5
R PDR