Revised Monthly Operating Rept for Jan 1983
ML20092C798
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/1983
From: Matthews T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20092C793 List:
References
NUDOCS 8406210328
Download: ML20092C798 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ - . . - _ _ _ _ _

l.

OPERATING DATA REPORT DOCKET NO. 50-285 DATE Februarv 4,1983 COMPLETED BY T. p ' n + + $. e...e' TELEPHONE (402i;TC4733 OPERATING STATUS I. Unit Name: Fort Calhoun Station Notes

2. Reporting Period: danuary, 1983 ,

1500

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 501
5. Design Electrical Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 461
7. Maximum Dependable Capaciay (Net MWe): 438
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since EsfReport. GiiiReasons:

The first stage blading of the hiah oressure turbine was removed after a failure of that blading in December 1982 and will be temporarily replaced with a pressure plate prior to startup following the 1983 refteling outage.

WA

~ 9. Power Level To Which Restricted.If Ang(Net one MWe):

. 10. Reasons For Restrictions. lf Any:

This Month Yr to Date Cumulative II. Hours in Reporting Period 744.0 744.0 81,985.0

12. Number Of Hours Reactor Was Critical 0.0 0.0 64,110.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 1,309.5
14. Hours Generator On Line 0.0 0.0 62,947.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Cross Thermal Energy Generated (MWH) 0.0 0.0 77.616.548.4 .
17. Gross Electrical Energy Generated (MWH) 0 . 0 __,. 0.0 25.735,333.5
18. Net Electrical Energy Generated (MWH) 0.0 0.0 24,330,034.4
19. Unit Service Factor 0.0 0.0 76.8
20. Unit Availability Factor 0.0 0.0 76.8
21. Unit Capacity Factor (Using MDC Neti 0.0 0.0 64.5
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 64.1
23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: March 20, 1983
26. Units in Test Status IPrior to Commercial Operation D N/A Forecas Achiesed INITIAL CRITICAllrY INITI AL ELECTRICITY COMMERCIAL OPER A TION O! 5 I"3 R PDR