ML20092C358

From kanterella
Jump to navigation Jump to search
Final Potentially Reportable Deficiency Rept 169 Re Possible Problem in Procurement Sys.Initially Reported on 840508.QA Group Intends to Reaudit Procurement Program Prior to Sept 1984.Condition Not Reportable Per 10CFR50.55(e)
ML20092C358
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/07/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
169, W3K84-1343, NUDOCS 8406210142
Download: ML20092C358 (2)


Text

'

p LOUISIANA 24a oeLAaoNoe s1neer POWER & L1GHT P O BOX 6008

  • NEW ORLEANS. LOUIStANA 70174 * (504) 366-2345 Nu $5sYIU

_ June 7, 1984 bbbbb W3K84-1343 j

Q-3-A35.07 MI 4E D

,_,,a--

Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

REFERENCE:

Telecon C. Hooper (LP&L) and J. Boardman (NRC IV) on May 8, 1984

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Potentially Reportable Deficiency No. 169

" Potential Deficiencies in the Procurement Program" Final Report On May 8, 1984, a potential problem in the procurement system was reported as PRD-169. Further evaluation of the previously described condition indicates this condition is not considered reportable pursuant to 10CFR50.55(e).

EVALUATION On May 8, 1984, LF&L notified NRC that a Nuclear Operations QA Audit Report had identified a potentially significant QA program breakdown within certain areas of the established procurement program. Subsequently work was stopped in two areas by the applicable managers and an investigation was initiated to determine the extent and significance of the findings. Although the audit report contained numerous findings and the findings varied considerably in significance, the investigation revealed, overall, that a significant QA breakdown had not occurred. The bases for this conclusion was that no equipment performing a safety-related function had been installed which had failed to meet approved specifications. Additionally no equipment had failed to meet design bases acceptance criteria during preoperational test because of procurement program deficiencies.

h 0

}W g

., * ~ -

-e Mr. John T. Collins June 7 1984 W3K84 I343 Page 2 Although this issue is not considered reportable pursuant to 10CFR50.55(e),

the audit did indicate the need for immediate and long term corrective

. actions. Those actions have been defined and verified to be implemented by

- the QA group.~ .All corrective actions for the findings will be reviewed and closed out using in place. audit procedures. The QA group intends to reaudit the procurement program prior to September 1984.

Based on the above evaluation this condition is not considered reportable.

Very truly.yours, O M T. F. Gerrets Corporate. Quality Assurance Manager TFG:CNH:VBR

- cc: Director:

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 (15Leopies) ,

Director Office of Management Information and Program Control ,

U. S. Nuclear Regulatory Commission i Washington, D.C. .20555 j Mr. E. L. Blake.

Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W. I

. Washington,' D.C. 20036 .

' ~

_Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center i' Institute of' Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 ,

Atlanta, Georgia 30339 P

Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda . Maryland' 20814 l

t F

n r- , .- . . - . - - . . , , _ y ,, 3y,-.. .-_m, ,,-, ,.,,, , ...,m_,, -

e, , . - , ,.. ,y- ,-