Monthly Operating Repts for May 1995 for Point Beach Nuclear Plant Units 1 & 2
ML20085F990
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/31/1995
From: Koudelka M, Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-95-0147, PBL-95-147, NUDOCS 9506200012
Download: ML20085F990 (9)


Text

. _ _ _ _ - _ -

\

[ ,

f f g '. .

e q J Wisconsin

'Electnc i POWER COMPANY l - Point Beach Nuclear Plant

! 6610 Nuclear Rd., Two Riwrs.VA 54241 (414) 755-2321 l PBL 95-0147 L

l i June 7, 1995 Document Control Desk l U. S. NUCLEAR REGULATORY COMMISSION I Mail. Station P1-137 Washington, DC 20555 l

Gentlemen:

( DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS EQT,NT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach

-Nuclear Plant for the calendar month of May 1995.

Sincerely,

( )

S G.t I fie l PBNE l 1

l cah j Attachments

.. \

cc: L. L. Smith, PSCW .

NRC Regional Administrator, . Region III ,

NRC Resident Inspector 9506200012 950531 PDR ADOCK 05000266 R PDR

\

{

, - _ . _. ~

OPERATING DATA REPORT DOCKET NO. 50-266 ,

~

DATE: 06/07/95 COMPLETED BY: M. B. Koudelka TELEPHONE: 414 755-6480

?

OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES '
2. REPORTING PERIOD: May - 1995 . .
3. LICENC"O THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS - MWE) : 523.8 . . -
5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

~

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING DERIOD 744.0 3,623.0 215,351.0
12. NUMBER OF HOURS REACTO.' WAS CRITICAL 744.0 2,745.0 179,584.6
13. REACTOR RESERVE SHUTDOWN OURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 744.0 2,731.3 176,444.3
15. UNIT RESERVE SHUTDOWN HCURS. 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWI!) 1 129,725 4,059,305 249,604,302 17 GROSS ELECTRICAL ENERGY GENERATED 563 HO '

1,385,020 84,323,670 '

18. NET ELECTRICAL ENERGY GENERATED _(MWE) 371,247 1,322,637 80,383,288
19. UNIT SERVICE FACTOR 100.0% '75.4% 81.9%
20. UNIT AVAILABILITY FACTOR 100.0% 75.4% 82.3%
21. UNIT CAPACITY FACTOR (USING MDC NE'.?). 102.9% 75.3% 76.6%
22. UNIT CAPACITY FACTOR (USING DER NET; 100.4% 73.5% 75.1%
23. UNIT FORCED OUTAGE RATE . _

0.0% 0.0% 1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)  :

NONE.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP; NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

,m*. - _ _. _ . _ _ _ _ - _ _ . _ __-- - - 6 _a___ _

POINT BEACH NUCLEAR PLANT Docket No. 50-266 .

Unit Name Point Beach. Unit 1 UNIT SilUTDOWNS AND POWER REDUCTIONS Date June 7.1995 -

Completed By M. B. Koudelka ..

REPORT MONTil MAY - 1995 Telephone No. 414n55-6480 Method of Shutting No, Date Type' Duration Reason' Down, Licensee Event System Component Cause and Corrective Action NA NA NA NA NA NA NA NA NA NA s

7

'F: Forced Reason: 3 Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain) 5 Exhibit 1 - Same Source G - Operational Error (explain)

II - Other (explain) 4 PB N 8b (o3-90)

i POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 ",

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit l'

^

MONTH M AY' . 1995 DATE 6/7/95 COMPLETED BY M. B. Koudelka s.

l TELEPHONE . (414)755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY  ! DAILY POWER LEVEL POWER LEVEL .l POWER LEVEL DAY MWe NET - DAY MWe NET $ DAY MWe NET i

1 500 11 -505 L 21 499

~

2 498 . 12 494 22 498 3 500 13 499 23 498 i

4 499 14- 503 A 24 497 5 502 15 497 25 499 ,

~

6 -497 .16 - 499 26 499 7 500 17 499 27 498 8 500 18 499 28 ~498 9 500 -19 499 -

29 -499 10 500 20- 499 30 497

.I 31. 498

~

I.

i

-i g

-[

.)

-t.

i .l

s.

DOCKET NO. ~50-266 UNIT NAME Point Beach Unit 1

- DATE June;7, 1995

- COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 499 MWe net for.the report. period.

Licensee Event Report 50/266/95-005-00,- Manual Reactor Trlip During Startup Physics Testing, was submitted.

Safety-related maintenance included:

~ ~

1. 1FT-477 HX-1B steam generator feedwater flow transmitter calibrated.
2. 1HX-1A&B steam generator J-tubes,vi.sual inspection. ---- . - -- -- -
3. HX-105A&B primary auxiliary building battery room vent coolers-flushed.
4. HX-266A&B G03/G04 emergency diesel generators. lube oil coolers repaired.
5. 1SC-966B pressurizer liquid sample containment isolation: valve stroked and packing adjusted.
6. SW-2911-BS north service water header Zurn strainer speed reducer bearings greased.

sa_ m. , ,, m.s-N

i OPERATING DATA RE ORT h DOCKET NO. 50-301 ,

DATE: 06/07/95 l COMPLETED BY: M'. B. Koudelka 3

TELEPHONE: 414 755-6480 OPERATING STATUS

1. . UNIT NAME: POINT BEACH NUC'M PLANT !- UNIT 2 . NOTES .
2. REPORTING PERIOD: May - 1995  ! . .
3. LICENSED THERMAL POWER (MWT) : '1518.5, . .
4. NAMEPLATE RATING (GROSS MWE) : 523.8 . .
5. DESIGN ELECTRICAL RATING (NET 'MWE) : 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . . . .

8.'IF CHANGES OCCUR IN CAPACITY EATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: ;

'NA 1

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY - (NET MWE) : NA
10. REASONS FOR RESTRICTIONS, (IF ANY) : i-NA 7 )

THIS MONTH YEAR TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 3,623.0 ~ 200,136.0
12. NUMBER OF POURS REACTOR WAS CRITICAL ! 744.0 3,477.4

~

l175,529.0 13 :. REACTOR RESERVE SHUTDOWN HOURS +  !, 0.0 0.0 .233.9

{

' 14 . HOURS GENERATOR ON LINE 744.0 3,396.3 l173,091.0

15. UNIT RESERVE SHUTDOWN HOURS l 0.0- 0.0  ; 302.2
16. GROSS THERMAL ENERGY GENERATED '(MWH) l_ 1,070,303 5,046,513 249,028,438
17. GROSS ELECTRICAL ENERGY GENERATED 'i -363,200 1,705.520 84,656,630
18. NET ELECTRICAL ENe2.GY GENERATED (MWH)l 346,506 1,627,079 . 80,707,594
19. UNIT SERVICE FACTOR t 100.0% 93.7% '.; 86.5%
20. UNIT AVAILABILITY FACTOR . [ 100.0% 93.7% ~

} 86.6%

21. UNIT CAPACITY FACTOR (USING MDC NET) [ 96.0% 92.6% l 82.6%
22. UNIT CAPACITY-FACTOR (USING DER NET) 93.7%- 90.4% 81.1%
23. UNIT. FORCED OUTAGE RATE , ,
0. 0 % . 0.0% j O.9%

, 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): l Refueling,. 09/30/95,.38 days j

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA. .

DATA REPORTED AND FACTORS CALCULATED A'3 REQUESTED IN NRC LETTFR DATED SEPTEMBER 22, 1977 j .

c i

i

_ _ _ _ . . . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ s .

POINT BEACH NUCLEAR PLANT Docket No. 50-301 ~ -

Unit Name Point Beach. Unit 2 .

UNIT SIIUrDOWNS AND POWER REDUCTIONS Date June 7.1995 Completed By M. B. Koudelka -

REPORT MONTH M AY - 1995 Telephone No. 414n55-6480 Method of Shutting Durau.on po,o Licensee Event System Component Cause and Corrective Action No. Date Type' (Hours) Reason 2 Reactop Report No. Code' Code' To Prevent Recurrence -

3 05/05 NA o 11 6 NA. IIB PUMPXX "the unit was reduced to $5 % power in support of repairs to 2P28B, the main feedwater pump.

During pump disassembly, the throttle relief valves were reposi:ioned and die rotating assembly, including seals, were replaced.

4 F

'F: Forced 2 Reason: 2 Method: ' Exhibit G - Instra.ctions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5 Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF4028b

' (03-90)

i

'e - ,

~

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 ..

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 i

MONTH MAY- 1995 DATE 6/7/95 COMPLETED BY - M. B. Koudelka TELEPHONE (414)755-6480 t

1 AVERAGE AVERAGE AVERAGE ,

. DAILY DAILY DAILY 1

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET j 1 487 11 483 21 485 2 485 12 484 22 485 3 488 13 486 23 486 4 486 14 489 24 485 i,

5 394 15 485 25 486 i 6 263 16 48S 26 485 7 266 17 485 27 485 l

! 8 403 18 486 28 484 i

i 9 486 19 486 29 486 10 490 20 485 30 484

, 31 485 9

i ' '

. a r:: a[* ,

. . ~ .

J. '

. DOCKET NO. 50-301 UNIT'NAME -

Point. Beach Unit 2 '

-:DATE .

May'8,..'1995. .

' COMPLETED BYc M. B..Koudelka. '

_ TELEPHONE- J414/755-6480i ..,.

i Unit 21 operated'.at an~averagefof 466L.MWe-net for;theTreport period.

. Safety-relatedfmaintenance4 included: -

- t

1. 2P2C charging pump infrared:in'spection performed.-

2.- 2SI-854A&B'T13_ refueling water. storage tank:outletito P10A&B-residual"heati removal pump suction header check valve Ldiscs .

~

replaced, a-

)

l l-  ;

o L

t l

l l

F-

[

L ,

L l'

l i.

'i .

i . . . . . - _ -. - _. . . _ _ .. _ _ . . . _ . . _ ._.a = . _ .