Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
P i
OPERATING DATA REPORT DOCKET NO. 50-317
.DATE d21,5/83 COMi LETED BY Elaine Lotito TELEPHONE (301) la7-5363 OPERATING STAT US Notes b
- 1. Uni: Name: Calvert Cliffs No. 1
- 2. Reportmg Period; January 1993 2,700
- 3. Licensed Thermal Power (MW ):
- 4. Nameplate Rating 1. Gross MWe): 918
- 5. Design Electrical Rating (Net MWe): 845
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Masimum Dependable Capacity (Net MWe): 825
- 8. If Charges Occur in Cap.scity RatinFs (Irems Nunter 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Leiel To hhich Hestricted. lf Any (Net 4the):
- 10. Reasons For Restnctions. lf Any:
This Month Yr..to.Date Ct.mubti e
- 11. Ilours in Reporting PerioJ 744 744
__ 67.813
- 12. Number Of Hours Reactor Was Critical 720.6 720.6 _
53.816.5
- 13. Reactor Resene Shutdown Hours 7.0 7.0 __ 1,815.5
- l #' 3 717.3 52,741.2
- 14. Hours Generator On Line - - - -
- 15. Unit Resene Shutdown flours 0.0 -
01 0 0.0 ' -
- 16. Gross Therma! Energy Ger.erated IMWH) 1.892.083 1,892.083 128.562.129 .
- 17. Gross Electrical Energy Generaled (MWill 639 387 s 639 387 42,640.330 612,549 k ,
- 18. Net Electrical Energy Generated (MWH) 612.549 40,276,757 96.4
- 19. Unit Senice Factor 96.4 77.8 l 20. Unit Assilability Factor 96.4 96.4 77.8
- 21. Unit Capacity Facter IUsing MDC Net) 99.8 99.8 73.2
- 22. Unit Capacity Factor iUsing DER Ner) 97.4 _
97.4 70.3
- 23. Unit Forced Outage Rate 3.6 3.6 8.3
- 24. Shutdowns Scheduled Oser Nest 6 Months tType. Date.snd Duration of Each t
- 25. If Shut Down At End Of Report Feriod, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY .
INITIA L ELECTRICITY COMMERCIAL OPER ATION 8302230167 830217 (4/77)
PDR ADOCK 05000317 R PDR t
C i
OPER AT1hG DAT A REPORT DOCKET NO. 5,0-318 DATE 2/15/83 COMPLETED BY Elaine Lotito TELEPl!ONE T1) 781-5363 OPERATING STATUS calvert Cliffs No. 2 Notes
!. Uni: Name:
- 2. Reporting Period. January 1983 2,700
- 3. Licensed ThennalPower(MWt)
- 4. Nameplate Rating (Gross MWep: 911 845
- 5. Design Electrical Rating INet MWe):
- 6. Maximum Dependable Capacity (Gross MWej: 860
- 7. Maximum Dependable Capacity (Net MWe) 825
- 8. If Charges Occur in Capmty Ratings (items Nunter 3 Through 7)Since Last Report.Gise Itessons.
- 9. Power Leiel To hhich Hestricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to-Date Cs.mu!stive II. Ilours in Reporting Period 744 744 51,168
- 12. Number of Hours Reactor Was Critical 424.1 424.1. 42.525.0
- 13. Reactor Resene Shutdown Hours 11.7 11.7 8015.9
- 14. Hours Generator On Line 301.0 301.0 41:843.9 ,
- 15. Unit Resene Shutdown floors 0.0 0.0 0.0 16.' Gross Thennal Energy Generated IM WH) 622,356 622.356 102,843,113 .
- 17. Gross Electrical Energy Genersted IMWH) 206,291 206,291 33,862.495
~
- 18. Net Electrical Energy Generated (MWH) 188.612 188.612 32.279.374
- 19. Omt Senice Facto, 40.5 40.5 81.8
- 20. Unit Availability Factor 40.5 40.5 81.8 2I. Unit Capacity Factor IUsing MDC Nett 30.7- 30.) 77.1
- 22. Unit Cepacity factor (Using DER Net) 30.0 30.0 74.7
- 23. Unit Forced Outage llate 3' 3' 0'
- 24. Shutdowns Scheduled Our Nest 6 Months IType. Date.and Duration of Eacht:
- 23. If Shut Dan At End Of Report Period Estimated Date of Startup:
- 24. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY.
INITIA L ELECTRICITY COMMERCIAL OPER ATION (4/77)
o,o ..' .
AVERAGE DAILY pNIT POWER LEVEL DOCKET NO.13I7 UNIT Calvert Cliffs #1 DATE 2/15/83 COMPLETED BY Elaine Lotito 87-5363 TELEPPf0NE MONTil January 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 878 874 J g7 2 878 18 872 3 877 873 19 4 877 875 20
$ 294 877 21 6 357 877 22 7 859 853 23 872 877 8 24 25 873 404 10 26 13 874 875 27 12 871 877 28 872 .879 33 29 872 879 34' 30 t$ 872 878 33 I6 875 INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole nwgawatt.
(9/77)
F .
s e, i.' .
AVER AGE DAILYllNIT POWER LEVEL DOCKET NO. 50-318 IJNIT calvert Cliffs #2 DATE 2/15/83 COMPLETED BY Elaine Lotito TELEPTIONE (301) 787-5363 anuary 1983 MONTH DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) g gg,.3,,,
1 8 37 2 3g .
3 87 39 4 -
20 361 5
2g 365 6
22 394 7
665 23 8 01 24 9 -
25 845' 10 26 832 II 27 826 12 23 823 13 822 29 14 30 831 15 3g 419 l
16 -
l l
INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
DOCKET NO. 50-317 UNIT SHUTDOWNS AND POWER REDUCTIONS calvert cliffs #1 UNIT NAME DATE 2/1s/83 COMPLETED BY Elaine Lotito REPORT MONTH January, 1983 TEllPHONE (301) 787-5363
- E E
- - ,$g 3 jM Licensee ,Ev, jwl, Cause & Corrective .
N i. Date h 3g ( j55 Event gy gO3 Action to
>- y5 5 jgg Report a mO g Prevent Recurrence d
83-01 830105 F 18.5 A 3 IB INSTRU Tripped due to a short in the Containment High High Radiation Monitor.
83-02 830126 F 8.2 A 3 XX ZZZZZZ Tripped due to loss of power to feedpump speed control.
I .' 3 4 F: Forced Reason; Method: Eshibit G Instructions S: Scheduled A.Equiprnent Failure (Explain) 1-Manual for Preparation of Data .
B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Refueiing 3 Automatic Scram. Eveni Report (LER) File (NUREG.
D-Regulatory Restrictiun 4d entinuation 0161)
E-Operator Training & Ucense Examination 5-Load Reduct. ion F Adnunistrative 5 G-Operational E:ror (Explain) 9-Othu Exhibit I - Sanw Source t'J/77) llother (Explain) b.--
50 318 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS Calvert Cliffs #2 UNIT NAME DATE 2/15/83 COMPLETED BY Elaine Lotito January 1983 REPORT MONTil TELEPHONE (301) 781-5363 e.
E E jg
- - E_ g 3 y 75 Licensee ,E ,, Cause & Corrective .
No. Date h 5g Q 2s$ Event g mV Q Action to H
$E 5 3
< ;? g _
Repost 8 uo Prevent Recurrence O
82-09 821016 S 431.3 C 4 XX FuelXX Refueling. Unit general inspection and condenser retubing.
83-01 830131 F 11.7 A 3 XX ZZZZZZ Loss of 22 120 VAC vital bus I 2 3 4 F: Forced Reason. Method: Exlubet G Instructions
.3: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data .
B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Refuelmg 3- Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 44 cneinuation Ol6I)
E-Operator Tsaining& Ucense Euminalion 5-Load Reduction F-Administrative 5 9-Other Exhibit I - Same Source G-Operational Error (Explain)
(9/77) Il4)ther iE xplain)
r-February 3,1983.
REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
- 2. Scheduled date for next Refueling Shutdown: October 1,1983
- 3. Scheduled date for restart following refueling: December 11,1983
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
June 29,1983
- 6. Important licensing considerations associated with the refueling.
, Relcad fuel will be similar to that reload fuel inserted into the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool -
l (a) 217 (b) 732 l Spent Fuel Pools are common to Units 1 and 2
! 8. The present licensed spent fuel pool storage capacity and the size of any increase in I
licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed l
l 9. The projected date of the last refueling that_can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core l off load.
l April,1991 l
l
r February 3,1983 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2. . '
- 2. Scheduled date for next refueling shutdown: April 28,1984.*
- 3. Scheduled date for restart following refueling: June 6,1984.*
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refleling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
March 3,1984*
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 732 Spent Fuel Poolis common to Units 1 and 2.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed 1
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
1
! April,1991 l
- Information changed since last time.
1 l
l l
SUMMARY
OF UNIT I OPERATING EXPERIENCE 3ANUARY 1983 1/1 At the beginning of this reporting period, Unit I was operating at 890 MWe with the reactor at 100% power.
1/5 At 0836, the reactor tripped as a result of initiation of Engineered Safety Features Actuation Logic A due to a short in the Containment High Radiation Monitor.
1/6 The reactor was brought critical at 0100 and the unit paralleled at 0301.
1/7 Resumed fullload operation (895 MWe) at 0000. At 1400, load was reduced to 830 MWe to investigate saltwater leakage into the main condenser. Load was increased to 890 MWe at 1710 when Indications of saltwater leakage disappeared.
1/10 1.oad was increased to 910 MWe at 0700.
1/18 Commenced reducing load at 1510 due to out of specification Refueling Water
~
Tank (RWT) boron concentration. Load had been decreased to 890 MWe at 1735 when RWT boron concentration was determined to be satisfactory. Load was increased to capacity (910 MWe) at 1920.
1/23 At 0300, load was decreased to 700 MWe for main turbine control valve testing.
Resumed full load operation (910 MWe) at 0610.
I 1/26 The reactor tripped on low steam genertor level at 0657 when power was lost to l
l the feedpump speed control The reactor was brought critical at 1405 and the unit paralleled at 1521. Load was increased to capacity (900 MWe) at 2200.
I 1/31 At the end of this reporting period, Unit I was operating at 900 MWe with the l
l reactor at 100% power.
1 i
l . .
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE JANUARY 1983 1/1 At the beginning of this reporting period, Unit 2 was shutdown for its 4th scheduled refueling outage.
1/12 Completed Reactor Coolant System heat-up at 0430.
1/14 The reactor was brought critical at 1900. Commenced low power physics testing.
1/16 The unit was paralleled at 0850. The unit was taken off the line at 1230 due to plugging of the condensate start-up strainers. The unit was paralleled at 2202.
Commenced escalation to power testing.
1/17 The unit was taken off the line at 0707 for main turbine overspeed testing. -
1/19 The unit was paralleled at 1201 after numerous maintenance itcms were completed. Recommenced escalation to power testing.-
1/22 Power increase was +erminated at 540 MWe at 2220 due to main feedwater limitations.
1/23 Load was increased to 790 MWe at 1600. Poor steam generator chemistry necessitated holding at this power level.
1/24 Load was increased to 875 MWe at 1500 for core physics measurements.
1/30 Completed core physics testing at 1345, increasing to capacity. Load was increased to 885 MWe at 2100. Electrical output was limited due to moisture l
separator reheater shell drain tank dumping to the main condenser because of flouride contamination from weld slag.
1/31 The reactor tripped at 1215 following the loss of 22120VAC vital bus and partial Engineered Safety Features Actuation. The reactor was brought critical at 2210. At the end of this reporting period, Unit 2 was critical awaiting return of l steam generator chemistry to within specification.
t l
l _ _ . _ , _ _ _