MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny ML20206S2541999-01-20020 January 1999 Confirms Resolution of Thermo-Lag Fire Barriers in Fire Zones OB-FZ-6A & OB-FZ-6B (480 Switchgear Rooms) IAW Previous Commitments Contained in Gpuns Ltrs to NRC & 971001 ML20199J2631999-01-18018 January 1999 Requests That Listed Changes Be Made to Correspondence Distribution List for Oyster Creek Generating Station ML20199D0271999-01-11011 January 1999 Requests Listed Addl Info in Order to Effectively Review TS Change Request 264 Re Ownership of Property within Exclusion Area ML20199A6521999-01-0707 January 1999 Notifies That Reactor Operators G Scienski,License SOP-11319 & D Mcmillan,License SOP-3919-4 Have Terminated Licenses at Oyster Creek Nuclear Generating Station, Effective 990101 ML20198T1061999-01-0606 January 1999 Forwards Rev 15 to Gpu Nuclear Corporate Emergency Plan for TMI & Oyster Creek Nuclear Station. with Summary of Changes Which Reflect Use of EALs Approved in NRC Ltr to Gpun on 980908 & Other Changes Not Related to Use of New EALs ML20198K0331998-12-23023 December 1998 Forwards Change Request 268 for Amend to License DPR-16. Amend Would Change TS to Specify Surveillance Frequency of Once Per Three Months ML20198H0181998-12-22022 December 1998 Forwards Attachment Addressing New Info & Modifying 980505 Submittal Re Request for Change to Licensing Bases for ECCS Overpressure,In Response to NRC Bulletin 96-03, Potential Plugging of ECCS by Debris in Bwrs ML20198H8521998-12-16016 December 1998 Dockets Completion of Physical Inventory Performed in July 1997,as Addl Info to Nuclear Matl Balance Rept Submitted on 980416 ML20196H4461998-12-0202 December 1998 Provides Final Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits ML20196B4471998-11-23023 November 1998 Provides Required Response 2 to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers in Bwrs. During Recently Completed 17R Refueling Outage,New Strainers Were Installed ML20195J8451998-11-12012 November 1998 Forwards Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan, as Change Previously Made Without Appropriate Notification to NRC ML20195C7201998-11-11011 November 1998 Forwards 120-day Required Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment, ML20195E1221998-11-10010 November 1998 Notifies NRC of First Time Usage of Code Case N-504 & Inclusion Into OCNGS ISI Program,As Accepted by RG 1.147, Inservice Insp Code Case Acceptability ML20155J6851998-11-0505 November 1998 Forwards TS Change Request 266,to Modify Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & Verify Channel Operability ML20155H5641998-11-0202 November 1998 Informs That Bne Has No Comments on Proposed Change 259 to Ts,Correcting Required Water Level in Condensate Storage Tank So That Design Basis Is Correctly Implemented ML20155G3741998-10-29029 October 1998 Forwards Response to NRC 980619 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-30
[Table view] |
Text
, ..
GPU Nuclear Corsxxation 1 Nuclear =e =r 388 Forked River. New Jersey 087310388 609 971-4000 Writer's Duect Dial Number:
C321-91-2082 May 1, 1991 U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 Gentlemen
' Subjects Oyster Creek Nuclear Generating Station Dockot No. 50-219 Emergency Responso Capability - Conformance to Regulatory Guide 1.97, Revision 3 on February 19, 1991 your letter entitled, Emergency Response Capability -
Conformance to Regulatory Guide (RG) 1.97, Revision 3, transmitted the NRC staff's Safety Evaluation (SE). As discussed in the SE, the Staff found the instrumentation provided by GPU Nuclear for rseting the recommendations of RG 1.97, Revision 3, acceptable except for the variables neutron flux, reactor coolant level, reactor coolant system prosaure, containment isolation valve position indication, and primary system safety relief valve position indication. The Staff also found unacceptable the CPUN's position on equipment identification in the control room for certain RC 1.97 variables.
The Staff requested that GPU Nuclear respond within 45 days of receipt of the February 19, 1991 letter indicating our intent to comply with the Staff's positions and advise the Staff of an implementation schedule regarding each of the Staff's positions. On March 26, 1991 in our phone conversation with Mr.
l Alexander W. Dromerick, NRC Senior Project Manager for Oyster Creek Nuclear Generating Station, we requested a three week extension for our response.
The attached are our responses to the six (6) issues identified in the Staff's SER.
If you have any questions concerning our responses please contact Mr. Michael Laggart, Manager, Corporate Nuclear Licensing at (201) 316-7968.
incerely, /
9105070132 910501 .
i PDR ADOCK 05000219-P PDR J. J Barton Dr ' tor, Oyster Creek JJB/YN/ pip Attachment cci Administrator, Region 1 NRC Resident Inspector .
gjhf Mr. Alex Dromerick, Jr.
YN:C3212082 b'i GPU Nuclear Corporahon is a subsid:ary of the General Pubhc Ubhbes Corporahon l
O'.:.g,,73 3
s Attachment to C321-91-2082 Emergency Response Capability -
Conformance to R. G. 1.97, Rev. 3
'Page 2
( A) Neutron Flux Monitorino NRC Concern It is the Staff's position that information on neutron flux is valuable to the operator in the evaluation of reactivity control. It is also the Staff's position that the licensee shall install and have operational neutron flux monitoring instrumentation which fully conforms to the Category 1 criteria, of 10 CFR 50.49, RG 1.97, and RG 1.100. The Staff finds acceptable the existing neutron flux instrumentation for interim
, operation.until implementation of a fully qualified indicating system is completed.
GPUN Resoonse GPUN plans to install a wide range neutron monitoring system available from General Electric. However, as we indicated in our letter dated April 5, 1990, an NRC approval of the GE Licensing Topical Report (NEDO 31439) on the wide range neutron monitoring system 13 essential prior to a GPUN commitment for installation and its schedule.
(B)-Reactor Coolant Level NRC Concern It is the Staff's position that information on the reactor coolant level is valuable to the operator in monitoring the accomplishment of accident mitigation and long term surveillance of the core cooling system. It is also the Staff's position that the licensee should provide redundant Class 1E power sources for the reactor coolant level instrumentation.
l- GPUN Resoonse
, The power supply concern will be addressed by providing redundant Class 1E l power sources for the reactor coolant level instrumentation. The schedule l- for this modification will be provided in the Oyster Creek Integrated L Schedule, i
YN:C3212082 l
Attachmsnt to C321-91-2082
- Emergency Response Capability -
Conformance to R. G. 1.97, Rev. 3
'Page 3 (C) Becordinc of Reactor Coolant System Pressure NRC Concern It is the Staff's position that information on the reactor coolant system pressure is valuable to the operator in monitoring the accomplishment of accident mitigation and long term surveillance of the reactor coolant system integrity. It is also the Staff's position that the licensee should provide recording of the reactor coolant system pressure in accordance with RG 1.97.
GPUN Response currently, the only RG 1.97 Category 1 reactor pressure strip chart recorders are narrow range. Wide range reactor pressure recorders which meet RG 1.97 Category 1 criteria are currently scheduled to be installed during the next refueling outage (14R).
(D) Containment Isolation Valve Position Indication NRC Concern It is the Staff's position that information on the status of containment isolation valve position is valuable to the operator in evaluation of the accomplishment of isolation of the containment. It is also the Staff's position that the licensee should provide separate Class lE power sources
! for the containment isolation valve position instrumentation.
CPUN Response Based on the specific Oyster Creek configuration, we are still evaluating the NRC staff position referenced above. We will provide the results of the evaluation within sixty (60) days.
(E) Safety Valve Position Indication I
( NRC Concern l It is the Staff's position that information on the status of the primary system safety relief valve position is valuable to the operator in monitoring the main steam system boundary integrity. It is also the l Staff's position that the licensee should provide Category 2 primary system safety relief valve position instrumentation.
( GPUN Concern As a result of Recommendation 2.1.3.a described in NUREG 0578, valvo l
YNiC3212082
Attachm:nt to C321-91-2082 Emergency Response Capability -
Conformance to R. G. 1.97, Rev. 3 Page 4 position indicating devices (acoustic monitors) were installed on the Electromatic Relief Valves (EMRV) and the Code safety valves at Oyster Creek in 1980. Each valve has a primary device (acoustic monitor) and a backup device (thermocouple). A control room alarm in provided for the acoustic monitors while thermocouple indication of tailpipe temperature is provided at a local panel on the 23 foot elevation in the Reactor Building. These devices provide a means for direct indication of valve position.
The addition of the acoustic monitors to all safety valves was required by NUREG-0737, Item II.D.3, in order to provide direct indication of safety valve position to the operator in the control room. The basic requirement was to provide the operator with unambiguous indication of whether the valve was open or closed so that the operator could take appropriate actions.
All safety valves at Oyster Creek are spring-loaded and do not have any mechanism for remote operator control of the valve's position from the control room. This means that if a safety valve has inadvertently opened or is stuck open, the operator cannot take any direct action to close the valve. The derived benefit is information only.
The control room alarm response procedure alerts the operator to an open safety valve based on the acoustic monitors. The procedure does not direct the operator to take any action other than to confirm that the valve did open based on increasing drywell pressure or an increase in safety valve discharge thermocouple reading.
In addition, NUREG-0737 required plante to develop symptom-based Emergency operating Procedures (EOPs) to provide better operator guidance in copying with transients and accidents. Oyster Creek has implemented symptom-based EOPs based on the BWR Ownera Group Generic Emergency Procedure Guidelines.
After developing the symptom-based EOPs, it was determined that safety valve position indication is no longer necessary based on the manner in which the EGPs direct the operator's actions. The EOPs instruct the operator to raspond to plant parameters without the need to diagnose the event. The operator takes actions to control reactor vessel and containment conditions to bring these parameters under control. The operator's actions in response to a loss of reactor vessel water inventory are the same regardless of the source of the inventory loss.
The discharge of steam to the drywell from the opening of a safety valve or any other primary system leakage path would be immediately evident to the operator by a rapid increase in drywell pressure and atmospheric temperature. The high drywell pressure condition is an entry point into both the reactor pressure vessel (RPV) control and containment control m c3212082
. . - -. . .- ~ _- . -. . - - . .. .- . ~ , .~
1
,e %
? Attachment to'C321-91-2082-4 Emergency Response Capability -
_ , .j
'Conformance to.R. G.'l.97, Rev. 3 LPage 5 procedures. The RPV control procedure-directs the operator to control RPV water level and pressure and confirm reactor shutdown. The containment control pressure gives the operator guidance for controlling drywell pressure and temperature and torus pressure, temperature and water level.
The presence of the safety valve acoustic monitor alarm does-not alter-the operator actions in controlling the changes in plant parameters during an event.
In summary, with the development and implementation of symptom-based emergency operating procedures, the-operators response is governed by .
. changes in plant _ parameters (symptoms) and not by what caused those ;
parameters to change. Consequently, operator response to a stuck open safety valve is not affected or dependent on the operability of the valve acoustic monitors or thermocouples. Thus, operability of safety valve position indication is not necessary.for transient or accident mitigation and Technical Specifications for safety valve position indication should not require a plant shutdown or. necessitate power-reduction in order to ensure compliance. Therefore, we believe that Category 3 classification for'the safetysvalve position indication is adequate at Oyster Creek
~
-Nuclear Generating Station.
In order to be consistent with the requirements of NUREG-0737, Item II.D.3, the oyster Creek Technical Specification Change Request No. 183 proposed to
, require that'all safety valve position indication instrumentation be operable prior to startup following each cold shutdown.
.( F) Instruments Identification in the Control Room NRC Concern Itfis;the Staff's_ position that,_at a minimum,' identification of the Type A and the Category 1 RG 1.97 instrumentation is necossary to help the
-operator easily discern that this instrumentation _is intended for use_under accident conditions. It is also the Staff's' position that the licensee should' provide identification in the control room of the Type A and the Category 1 RG 1.97 instrumentation.
i GPUN Response it GPUNfplans to provide identification of the Type A and the category 1 RG 1.97 instrumentation during the forthcoming operating cycle 13.
I- However, we continue to maintain that the_ operators should utilize all of l the instruments which are available to determine plant conditions'rather than. relying heavily on RG 1.97 instruments. This approach is-consistent with the symptom-based approach of the emergency operating procedures for oyster Creek. It is not possible to determine, in advance, all specific failure modes of instruments under all possible conditions, specifically calling out RG 1.97 instrumentation on the control panels could, under certain circumstances, mislead the operators.