Third Interim Const Deficiency Rept 77 Re Inadequate Closure Time & Flow Rate for Containment Purge Valves.Corrective Action Completed.Final Rept Will Be Submitted by 830729
ML20072N337
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/05/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 77, W3I83-0230, W3I83-230, NUDOCS 8307150289
Download: ML20072N337 (1)


Text

l OUISIANA 142 DH ARONDE STMU POWER & L1GHT P O BOX 6008

  • NEW OHLFANS. LOUISIANA 70174 * (5041 366 2345

rNN s*vsYtY) u July 5, 1983 W3183-0230 Q-3-A35.07.77 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 3[(h([ (V/(hD Arlington, Texas 76012 Jll l I1983

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 - O Significant Construction Deficiency No. 77

" Inadequate Containment Purge Valves Closure Time and Flow Rate" Third Interim Report

REFERENCE:

LP&L letter W3183-0182 dated May 20, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than June 30, 1983.

At the present time, all corrective action has been completed. The review of supporting documentation is currently underway and is expected to be complete by July 15, 1983.

A Final Report will therefore be submitted to the USNRC by July 29, 1983.

Very truly .ours, 7

Mm F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement '

U. S. Nuclear Regulatory Commission Washington, D. C. 20553