Responds to NRC Re Violations Noted in IE Insp Repts 50-440/81-16 & 50-441/81-16.Corrective Actions Remain as Identified in .Completion Scheduled for 830630
ML20071B681
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/29/1982
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20071B678 List:
References
NUDOCS 8302280513
Download: ML20071B681 (1)


Text

---

THE CLEVELAND ELECTillC ILLUMIN ATING C0F an.

l P.O. BOX 5000 m CLEVELAND. OHIO 44101 m TELEPHONE (216) 622-9800 m ILLUMINATING BLDG e 55 PUBLIC SOUAR Serving The Best Location in the Nation Dalwyn R. Davidson VICE PRESIDENT SYSTEM ENGINEERING AND CONSTRUCTION Septenber 29, 1982 Mr. C. E. Norelius, Director Division of Engineering and Technical Prograts U. S. Nuclear Regulatory Ccmnission, Pagion III 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant DOCKET Nos. 50-440; 50-441 Pespcnse to I. E. Peport

Dear Mr. Norelius:

Please referen inspection Peport 50-440/81-16: 50-441/81-16, attached to your let-

- ter dated January 5,1982, W.ich identified amas examined by Mr. I. T. Yin during his inspection ccnducted November 17--20, Deceder 10-11 and 15,1982.

In a letter dated January 28, 1982, we informed you of the reasures taken to rwolve the three (3) Severity Level V violations cited in the referen d report. 'Ihis letter is intended to modify our respcnse to Noncmplian 440/81-10-01; 441/81-16-01.

As discussed on September 23, 1982 between Mr. I. T. Yin of your offi and Mr. T. G.

Swansiger of The Cleveland Electric Illuminating Carpany, the corrective action identified in our response remains the same, but date of ocupletion of action is now scheduled for June 30, 1983.

It is our intenticn to keep the Resident Inspector, Mr. M. L. Gildner, inforned of status and activity in this area.

Sin rely,

. b Dalwyn R. Davidson Vi President System Engineering and Construction ec: Mr. M. L. Gildner - NRC, Site Mr. I. T. Yin, Engineering Inspection Branch Division of Engineering and Technical Pra -

Mr. R. L. Spessard, Director Division of Resident and Project Inspection U. S. Nuclear Regulatory Ccmrission c/o Document Management Branch Washington, D. C. 20555 8302280513 830224