Ti!E C L EV E L A N D E L E CT RIC IL L U MI N ATI N G C O M P Ai1Y P.O. Box 97 5 P ERRY, OHIO 44081 m T EL EPHoN E (216) 259 3737 m ADD RESS-10 CENTER RO AD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT January 27, 1983 PY-CEI/0IE-0001 L
- 17. James G. Keppler, Director Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Clen Ellyn, IL 60137 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 I.E. Bulletin No. 82-04
Dear Mr. Keppler:
In accordance with your request, the following information is provided in response to I.E. Bulletin No. 82-04.
We have completed a review of the containment electrical penetration assemblies outlined in I.E.Bulletin 82-04 and found that the Perry Nuclear Power Plant does not utilize Bunker-Ramo containment electrical genetration as described in the bulletin.
Perry Nuclear Power Plant uses Westinghouse electrical penetrations. Therefore, we conclude that the concerns of this bulletin are not applicable.
Very truly yours, Murray R.
'delman Vice President Nuclear Group MBE:kh cc: Jay Silberg, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Max Gildner NRC, Resident Inspector U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.
20555 U. S. Nuclear Regulatory Commission c/o Document Management Branch fkf Washington, D.C.
20555 8302080167 830127 PDR ADOCK 05000440 G
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.