MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20207L1901999-03-16016 March 1999 Informs That NRC Staff Set Up Single Electronic Mail Address to Receive All Communications (Including Service of Filings) Re CP&L Proceeding.All Electronic Communications Should Be Sent to Counsel for NRC Staff at New Electronic Address ML20207G5621999-01-12012 January 1999 Requests That Nc Denr & Div of Radiation Protection Use Whatever State Sources Necessary to Do Thorough Independent Technical,Regulatory,Safety,Risk & Engineering Review of Proposed Amend.With Certificate of Svc.Served on 990309 ML20198F1471997-08-0707 August 1997 Discusses Dam Safety Audit at Plant Auxiliary Reservoir Dam. Draft Ltr for Use in Transmitting FERC Rept to Licensee, Action List of NRC Requested Licensee Actions,Info Re Natl Inventory of Dams & Insp Rept,Dtd 970630,encl ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model ML20134J1821990-07-12012 July 1990 Informs That Full Investigation Re Counterfeit Electrical Components Shipped to Shearon Harris Nuclear Plant Will Be Initiated ML20134H3841990-06-26026 June 1990 Requests That OI Investigate Circumstances Surrounding Possible Wrongdoing by Stokely Enterprises of Norfolk,Va & Spectronics of Mobile Re Misrepresented Potter & Brumfield Relays to Shearon Harris Nuclear Power Plant ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20195E6191988-06-13013 June 1988 Notifies of CRGR Meeting 138 on 880614 in Rockville,Md. Agenda Listed ML20154D8541987-12-30030 December 1987 Forwards Info on Auxiliary Feedwater Check Valves for Facilities Per IE Bulletin 85-001,in Response to 871229 Request ML20238E0001987-09-0303 September 1987 Notification of Time Change for 870917 Meeting W/Util in Bethesda,Md to Discuss Generic Ltr 87-09 Re Tech Spec Improvement Program ML20238A8041987-09-0303 September 1987 Notification of 870917 Meeting W/Util in Bethesda,Md to Discuss Tech Specs Improvement Program Per Generic Ltr 87-09 ML20195G3891987-08-21021 August 1987 Forwards Safety Evaluation Re Util 870526 Application for Amend to License NPF-63,increasing Max Allowed Enrichment of Reload Fuel to 4.2% Weight U-235.Changes Acceptable ML20195G2961987-07-14014 July 1987 Forwards Request for Addl Info Re Util 870526 Proposed Tech Spec Change Concerning Handling & Storage of Fuel W/Increased Enrichment to 4.2 Weight % U-235 ML20209A9621987-04-28028 April 1987 Forwards Two Photographs of Separation Problem in Fuel Handling Bldg.Previous Pictures of licensee-identified Items Not Similar in Nature to Problem Identified by Ford ML20210L9561987-02-0505 February 1987 Forwards NRR Monthly Status Rept,Including Info Available as of 870131.Rept Identifies Potential or Actual Licensing Delay for Shoreham,Comanche Peak Unit 1,Braidwood Unit 1 & Seabrook Unit 1 ML20212G3021987-01-20020 January 1987 Forwards Attachments to Be Incorporated in Transcript Re Facility ML20207K8061987-01-0606 January 1987 Forwards Ltr Presented to Asselstine on 870105 to Be Served on Parties to Proceeding.Served on 870106 ML20207M0361987-01-0606 January 1987 Provides Current Status of Facility Proceeding,Including Admitted Contentions Raising Listed Issues.Aslb Issued Three Initial Decisions & Concluding or Final ASLB Decision Favorable to Applicants ML20207E2271986-12-19019 December 1986 Notifies of Commissioner Asselstine 870105 Site Visit. Representatives of Interested Parties Invited to Attend. Served on 861219 ML20215E9231986-12-19019 December 1986 Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending IA-86-843, Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending1986-12-19019 December 1986 Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending ML20212C6771986-12-15015 December 1986 Requests That Encl 861215 Minutes of 861210 Meeting W/ Coalition for Alternatives to Shearon Harris Be Placed in PDR ML20196B6441986-12-12012 December 1986 Forwards Ofc of Investigations Rept of Inquiry Re Alleged Falsification of Radiation Exposure Records & Alleged Discrimination (Q2-86-017).Partially Deleted Related Info Encl ML20211L6521986-12-12012 December 1986 Advises That Time for Commission to Review ALAB-852 Expired. Commission Declined Review.Decision Became Final Agency Action on 861210.Served on 861212 ML20215B1281986-12-10010 December 1986 Advises That Time for Commission to Review ALAB-843 Expired. Commission Declined Review.Decision Became Final Agency Action on 861031.Served on 861210 ML20206C0431986-12-0404 December 1986 Memo for Affirmation,Notifying That Commission Being Asked to Respond to Request from W Eddelman & Coalition for Alternatives to Facility for Hearing on Util Requested Exemption from Requirements for Emergency Exercise ML20215N6601986-11-0606 November 1986 Advises That Commissioner Bernthal Has Canceled Planned 861118 Visit to Facility.Served on 861106 ML20215N5681986-10-29029 October 1986 Forwards 860825-29 Rept Documenting IE Assessment of Three Technical Allegations Re Cable Tray Support Design at Facility.Allegation Re Load Carrying Adequacy of Connection Detail Used for Cable Tray Supports Included in Rept ML20215M4501986-10-28028 October 1986 Advises of Commissioner Bernthal 861118 Visit to Facility. All Representatives of Party to Proceeding Wishing to Attend Should Notify Author by C.O.B. on 861112.Served on 861029 IA-87-279, Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl1986-10-23023 October 1986 Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl ML20236F1641986-10-23023 October 1986 Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl ML20215J4321986-10-21021 October 1986 Forwards Trip Rept of 860825-29 Visit to Facility to Conduct Assessment of Technical Allegation Re Cable Tray Support Design.One Allegation Re Connection Detail Used on Cable Tray Substantiated ML20212G0401986-09-30030 September 1986 Forwards Background Info on Facility Per 860924 Request. Proposed Agenda for Chairman Lw Zech 860914-15 & Commissioner KM Carr 861050-06 Site Visits Encl ML20209A9981986-09-30030 September 1986 Notification of 861009 Enforcement Conference W/Util in Region II Ofc to Discuss Potential Deficiency in Const QA Program.Util Nonconformance Rept,List of Attendees & Util Presentation Viewgraphs Encl ML20214R5231986-09-24024 September 1986 Informs Parties That Commissioner KM Carr Will Tour Facility on 861006.Notification Requested by 861002 of Any Parties to Proceeding Wishing Single Representative Attendance. Served on 860924 IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets1986-09-22022 September 1986 Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets ML20237G4671986-09-22022 September 1986 Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets ML20207S2361986-09-17017 September 1986 Advises That Commission Disapproved SECY-86-252, Commission Review of Shearon Harris Appeal Board Decision on Environ Issues ML20210B5561986-09-16016 September 1986 Forwards Ps Miriello Affidavit to Be Serve Upon Appropriate Parties & Boards in Pending Proceedings. Served on 860917 ML20214N4421986-09-15015 September 1986 Notifies That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-837 Expired.Served on 860915 ML20236F1421986-09-12012 September 1986 Forwards Lists of Items to Be Completed Prior to Fuel Loading,Per Insp Procedure 94300B.Licensee Projected Fuel Load Date Is Sept 1986 ML20209G0191986-09-11011 September 1986 Discusses B Cummings Telcon Concerning Ltr Expressing Opposition to Util Request for Exemption to Emergency Drill Requirements 1999-07-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20207L1901999-03-16016 March 1999 Informs That NRC Staff Set Up Single Electronic Mail Address to Receive All Communications (Including Service of Filings) Re CP&L Proceeding.All Electronic Communications Should Be Sent to Counsel for NRC Staff at New Electronic Address ML20207G5621999-01-12012 January 1999 Requests That Nc Denr & Div of Radiation Protection Use Whatever State Sources Necessary to Do Thorough Independent Technical,Regulatory,Safety,Risk & Engineering Review of Proposed Amend.With Certificate of Svc.Served on 990309 ML20198F1471997-08-0707 August 1997 Discusses Dam Safety Audit at Plant Auxiliary Reservoir Dam. Draft Ltr for Use in Transmitting FERC Rept to Licensee, Action List of NRC Requested Licensee Actions,Info Re Natl Inventory of Dams & Insp Rept,Dtd 970630,encl ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model ML20134J1821990-07-12012 July 1990 Informs That Full Investigation Re Counterfeit Electrical Components Shipped to Shearon Harris Nuclear Plant Will Be Initiated ML20134H3841990-06-26026 June 1990 Requests That OI Investigate Circumstances Surrounding Possible Wrongdoing by Stokely Enterprises of Norfolk,Va & Spectronics of Mobile Re Misrepresented Potter & Brumfield Relays to Shearon Harris Nuclear Power Plant ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20195E6191988-06-13013 June 1988 Notifies of CRGR Meeting 138 on 880614 in Rockville,Md. Agenda Listed ML20154D8541987-12-30030 December 1987 Forwards Info on Auxiliary Feedwater Check Valves for Facilities Per IE Bulletin 85-001,in Response to 871229 Request ML20238A8041987-09-0303 September 1987 Notification of 870917 Meeting W/Util in Bethesda,Md to Discuss Tech Specs Improvement Program Per Generic Ltr 87-09 ML20238E0001987-09-0303 September 1987 Notification of Time Change for 870917 Meeting W/Util in Bethesda,Md to Discuss Generic Ltr 87-09 Re Tech Spec Improvement Program ML20195G3891987-08-21021 August 1987 Forwards Safety Evaluation Re Util 870526 Application for Amend to License NPF-63,increasing Max Allowed Enrichment of Reload Fuel to 4.2% Weight U-235.Changes Acceptable ML20195G2961987-07-14014 July 1987 Forwards Request for Addl Info Re Util 870526 Proposed Tech Spec Change Concerning Handling & Storage of Fuel W/Increased Enrichment to 4.2 Weight % U-235 ML20209A9621987-04-28028 April 1987 Forwards Two Photographs of Separation Problem in Fuel Handling Bldg.Previous Pictures of licensee-identified Items Not Similar in Nature to Problem Identified by Ford ML20210L9561987-02-0505 February 1987 Forwards NRR Monthly Status Rept,Including Info Available as of 870131.Rept Identifies Potential or Actual Licensing Delay for Shoreham,Comanche Peak Unit 1,Braidwood Unit 1 & Seabrook Unit 1 ML20212G3021987-01-20020 January 1987 Forwards Attachments to Be Incorporated in Transcript Re Facility ML20207Q2021987-01-16016 January 1987 Staff Requirements Memo Re 870108 Discussion/Possible Vote in Washington,Dc on Full Power OL for Plant.Commission Authorized Issuance of Full Power OL ML20207K8061987-01-0606 January 1987 Forwards Ltr Presented to Asselstine on 870105 to Be Served on Parties to Proceeding.Served on 870106 ML20207M0361987-01-0606 January 1987 Provides Current Status of Facility Proceeding,Including Admitted Contentions Raising Listed Issues.Aslb Issued Three Initial Decisions & Concluding or Final ASLB Decision Favorable to Applicants ML20215E9231986-12-19019 December 1986 Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending IA-86-843, Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending1986-12-19019 December 1986 Summarizes Status of Shearon Harris Proceeding.Contentions Raised on Listed Issues.Aslb Issued Three Partial Initial Decisions & One Concluding Decision.Decisions Appealed & Three Affirmed by Appeal Board.One Decision Pending ML20207E2271986-12-19019 December 1986 Notifies of Commissioner Asselstine 870105 Site Visit. Representatives of Interested Parties Invited to Attend. Served on 861219 ML20212C6771986-12-15015 December 1986 Requests That Encl 861215 Minutes of 861210 Meeting W/ Coalition for Alternatives to Shearon Harris Be Placed in PDR ML20211L6521986-12-12012 December 1986 Advises That Time for Commission to Review ALAB-852 Expired. Commission Declined Review.Decision Became Final Agency Action on 861210.Served on 861212 ML20196B6441986-12-12012 December 1986 Forwards Ofc of Investigations Rept of Inquiry Re Alleged Falsification of Radiation Exposure Records & Alleged Discrimination (Q2-86-017).Partially Deleted Related Info Encl ML20215E0721986-12-11011 December 1986 Staff Requirements Memo Re 861204 Affirmation/Discussion & Vote in Washington,Dc Re W Eddleman & Coalition for Alternatives to Shearon Harris Request for Hearing on Util Request for Exemption from Full Scale Exericse ML20215B1281986-12-10010 December 1986 Advises That Time for Commission to Review ALAB-843 Expired. Commission Declined Review.Decision Became Final Agency Action on 861031.Served on 861210 ML20206C0741986-12-0505 December 1986 Staff Requirements Memo Re Affirmation/Discussion & Vote on Request for Hearing Re Facility Exemption Request.Order Finds No Matl Issues of Fact That Warrant Hearing ML20206C0431986-12-0404 December 1986 Memo for Affirmation,Notifying That Commission Being Asked to Respond to Request from W Eddelman & Coalition for Alternatives to Facility for Hearing on Util Requested Exemption from Requirements for Emergency Exercise ML20215N6601986-11-0606 November 1986 Advises That Commissioner Bernthal Has Canceled Planned 861118 Visit to Facility.Served on 861106 ML20215N5681986-10-29029 October 1986 Forwards 860825-29 Rept Documenting IE Assessment of Three Technical Allegations Re Cable Tray Support Design at Facility.Allegation Re Load Carrying Adequacy of Connection Detail Used for Cable Tray Supports Included in Rept ML20215M4501986-10-28028 October 1986 Advises of Commissioner Bernthal 861118 Visit to Facility. All Representatives of Party to Proceeding Wishing to Attend Should Notify Author by C.O.B. on 861112.Served on 861029 ML20236F1641986-10-23023 October 1986 Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl IA-87-279, Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl1986-10-23023 October 1986 Advises That Based on Implementation of Insp Program,Const & Preoperational Testing of Plant Have Been Completed Per FSAR & Other Docketed Commitments.Recommends Issuance of Low Power License for Plant.List of Licensed Conditions Encl ML20215J4321986-10-21021 October 1986 Forwards Trip Rept of 860825-29 Visit to Facility to Conduct Assessment of Technical Allegation Re Cable Tray Support Design.One Allegation Re Connection Detail Used on Cable Tray Substantiated ML20209A9981986-09-30030 September 1986 Notification of 861009 Enforcement Conference W/Util in Region II Ofc to Discuss Potential Deficiency in Const QA Program.Util Nonconformance Rept,List of Attendees & Util Presentation Viewgraphs Encl ML20212G0401986-09-30030 September 1986 Forwards Background Info on Facility Per 860924 Request. Proposed Agenda for Chairman Lw Zech 860914-15 & Commissioner KM Carr 861050-06 Site Visits Encl ML20214R5231986-09-24024 September 1986 Informs Parties That Commissioner KM Carr Will Tour Facility on 861006.Notification Requested by 861002 of Any Parties to Proceeding Wishing Single Representative Attendance. Served on 860924 IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets1986-09-22022 September 1986 Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets ML20237G4671986-09-22022 September 1986 Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets ML20203N3441986-09-19019 September 1986 Staff Requirements Memo on 860911 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-254,SECY-86-257 & SECY-86-258 ML20207S2361986-09-17017 September 1986 Advises That Commission Disapproved SECY-86-252, Commission Review of Shearon Harris Appeal Board Decision on Environ Issues 1999-07-27
[Table view] |
Text
.-
I
,c,=
12/12/84 1
ga4u4/
DOCK E T NO.
07002997 pggg)pp4 MEMOR ANDUM FOR WILLIAM 0. MILLER, CHIEF LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION FROMt D. C ARLSON FUEL F ACILITY SG LICENSING BRANCH DIVISION OF SAFEGUARDS OFFICE OF NUCLEAR MATERI ALS SAFETY AND SAFEGUARDS SUBJ E CT1 -
COSTS AND MANHOURS FOR LICENSING ACTION THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE APPLI-CATION DATED 04/02/84 ARE TABULATED BELOW FOR LICENSE NO.
i
- 1. NAME CAROLINA POWER A LIGHT CO.
P.-O.
DOX iSS1 RAL EIGH, NC. 27602
- k. A). CASEWORK CONTROL NO. 07002997760J B) MAIL CONTROL NO.
C) TAC HO.
- 3. A ) PERIOD COVERED (STAFF HOURS) 04/02/84 - 06/23/84 B) COMPLETION DATE t C) AMENDMENT NO.
. 4 '. CONTRACT COSTS ASSOCIATED WITH THIS APPLICATION: $
0 PERIOD COVERED (CONTRACT COSTS)
- 5. TAC WORK BY OTHER OFFICES:
0 HOURS I
6.- HOURS DURING REPORTING PERIOD 0.0
' 7. F E E CHARGABL E t. $
0 B'. - TO T A L COST TO PROCESS APPLICATION 1- 0 0 APPROVED:
k
[
mml a////r y' W.< BROWN D.
c A R t c;nN.
BR ANCH-CHIEF PROJECT MANAGER FUEL FACILITY SG LICENSING BRANCH 4
910D050204 900921 2d PDR FOIA WILLI AM90-162 PDR L
e
y e'
L w
'l RUN D4?E RECULATORY IMFDRMATION TRACKING SYSTEh PAGE 12/12/84 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 129 PERIOD COVEREDI 04/02/84 - 06/23/84
, PROJECT MANAGERt DMLCARLSDM CASEWORK NUMBER 07002997760J
-FACILITY'NAME CAROLINA-POWER & LIGHT'CO.-
DATE CLOSED: ACTIVE NATURE OF-ACTIVITY:
BR AIDWOOD: 42 FFSSP
~
REGULAR REVIEWER WEEK ENDING
--~~~~--~~---..-~~~~~ __ ______.,______________________ HOURS
. NO MANPOWER RECORDS-EXIST FOR THIS CASE!
4 e
I I
l i
1
,--,,f,
.....L,.
,v.
-i
' Distribution:
- I Docket 70 2997 NMSS R/F 12/12/84-FCUP R/F-VLTharpe TDOCKET'NO.8-07002997
// M /
- MEMORANDUM FOR WILLIAM 0.
MILLER, CHIEF LICENSE FEE MANAGEMENT' BRANCH 4bfdO#fffd 0FFICE-0F. ADMINISTRATION LFROMI' N.
KETZLACH URANIUM FUEL LICENSING BRANCH DIVISION OF FUEL CYCLE & MATERIAL SAFETY OFFICE OF NUCLEAR MATERIALS SAFETY-AHD SAFEGUARDS 5UBJECTI-
= COSTS AND MANHOURS-FOR LICENSING ACTION 1
THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE APPLI-CATIDH DATED' 04/12/84-ARE TABULATED BELOW FOR LICENSE NO.
1.'NAMEl-CAROLINA-POWER & LIGHT CO.
i LP, O.
BOX 1551 RALEIGH,~NC. 27602 2.
A) CASEWORK CONTROL NO. 07002997010S
.(
B)' MAIL; CONTROL-NO. 23562 1
LC) TAC'NO._
y
-3.cA)": PERIOD COVERED-(STAFF HOURS) 04/12/84 - 06/23/84 B) COMPLETI0HtDATE:
REVIEW ACTIVE
<C) AMENDMENTJNO.
4,- CONTRACT-COSTS ASSOCIATED WITH THISLAPPL'ICATION: 6 LPERIOD COVERED (CONTRACT COSTS)
J5.-TAC WORK BY OTHER OFFICEst 0
HOURS
- 6. HOURS DURING REPORTING PERIOD 1 22.5/
-7.JFEE;CHARGABLE' 4-855 8.: TOTAL COST TO PROCESS APPLICATION
'APPROVEh O
M R.: PAGr "y[/ - N. K 8 T Z L A C H
<(()gI BRANCH CHIEF-PROJECT-MANAGER URANIUM FUEL LICENSING BRANCH
__qh;&dW
TE RE6ULATORY INFORMATION TRACKING SYSTEM PAGE~
84-DETAIL LISTING OF HOURS REPORTED ON CASEWORK 38 PERIOD COVERED 04/12/84 - 06/23/84-ECT MANAGERt H KETZLACH CASEWORK NUMBER -07002997010S LITY HApEl--CARDLINA POWER & LIGHT CO.
DATE CLOSED: ACTIVE L
' NATURE OF ACTIVITY:
iCP&L=SNN LICENSE APPL REGULAR REVIEWER WEEK ENDING.
HOURS THE FOLLOWING WERE CALCULATED AT 38 $ PER HOUR H__KETZLACH 05/26/84 10.5 N
KETZLACH.
06/02/84 1.0 N
KETZLACH 06/02/84 0.5 N
KETZLACH 06/09/84 9.5 h
KETZLACH 06/09/84 1.0 q
b t
}
f i
UNITED ST ATES
. j' t.
NUCLEAR REGULATORY COMMisslON g
l{
WASHINGTON, D.L 20565 t
%,.....,/
OCT 2 31984 MEMORANDUM FOR:
Files 2
FROM:
C. James Holloway, Jr., Assistant Chief License Fee Management Branch, ADM
SUBJECT:
IE-HQ AND REGIONAL OFFICE PROFESSIONAL STAFF HOURS AND CONTRACTUAL SERVICES COSTS - HARRIS 1 sunnarizes the results of our review of the Harris 1 computer printouts (Enclosure 2) provided by IE-HQ end the Regions. Of the 20,124.1 professional regular hours expended by IE-HQ and the regional staffs through June 23,1984,14,223.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have been included for fee recovery purposes.
IE has no record of any contract costs for Harris 1.
/
0.
C James H lloway, Jr.,
sistant Chief License Fee Management Branch Office of Administration
Enclosures:
As stated
(>*$Y l
g e
SUMMARY
- HARRIS 1
_ Regional Offices and IE Headquarters 1
Fiscal Year Profest.ional Regular Hours Regional Offices Include For Fees -
Exclude From Fees Totals FY 1978 165.0 48.5 213.5 1979 2,098.5 1,41 2.6 3.511.1
-1980 1,633.5 533.0 2,166.5 1981 1.565.0 198.0 1,763.0 1982 2,415.0 963.5 3,378.5 1983 3.186.0 1,249.5 4.435.5 1984(Thru6/23/84)-
2.570.5 1,170.5 3,741.0-TOTAL REVIEWS:
13,633.5 5,575.6 19,209.1 IE Headquarters FY 1979 138.0 138,0-1980 5.C 5.0
'1983 262.0 262.0
.1984 (Thru 6/23/84) 328.0 182.0 51 0.0 TOTAL IE HEADQUARTERS:
590.0 325.0 915.0 GRAND TOTAL ALL HOURS:
14,223.5 5,900.6 20,124.1 ENCLOSURE 1
i Harris 1 - Suntary IE Headquarters and Regional Offices Professional Staff Hours By Activity Codes-a Include For Fee Recovery FY 1978 FY 1979 FY 1980 FY 1981 FY 1982 FY 1983 F
Regional Office Activity Codes 1TW 62.5 43.4 ITX 6.0 3.9 ITO 83.5 61.2 2TW 5.0 2TO 8.0 532.0 51 5. 0 447.0 697.0 787.0 DOC PAP 439.5 21 8.5 137.0 255.0 259.0 PPl 1,015.5 900.0 981.0 1,463.0 2,097.0 2TX 3.0 LEP 24.0 APD MI 1
APP BH 131 QAT 19.0 165.0 2,098.5 1,633.5 1,565.0 2,415.0 3,186.0 2
Subtotal Regions:
IE Headquarters 262.0 LRA Total Included For Fees:
165.0 2,098.5 1,633.5 1,565.0 2,415.0 3,448.0 1
5 Harris cl' -- Susunary IE Headquarteps and RegionalJ0ffices Professional? Staff Hours By Activity. Codes Exclude ~From Fee' Recovery FY 1978'.
FY-1979 FY 1980 FY'1981 FY 1982 FY 1983 l
Regional Office Activity Codes' C00.
23.5' 179.6 92.5 57.5 193.0 217.5 1UA 2:0 IUW 2.0 IUX 10.0i 115
- 11.0' 639.5 AST
~-
120.0 800 12.5 149.0 95.5 J0M PCI 12.0
.179.5 PPT 8.0 260.0-43.5 184.0 511.0 PRI' 39.0-388.5' 188.0 P1V 109.5 3.0 100 DPP 19.0-4.0 JMO 47.0 2.0 PAA RTl 10.0 4UZ 5.0 BR1 110.0 10.0 78.0 37.0 137.0 139.0 DR1 SRI 9.0
~
14.0 42.0 9.0
-18.0'-
PEl e
~
^
~~
r.
~ Harris [1,- Sununary.
IE Headquarters and-Regional-Offices
-! Professional. Staff. Hours' By Activity Codes Exclude From Fee Recovery FY 1978
.FY 1979
- FY 1980-FY 1981 FY 1982_
FY 1983' 1321 16.0 134 68.0'
~ARD ARI ARP
[
ASl AT.
a BAl BA2 BB BD2 BE BF BJ
=-
.2ubtotal Regions:
48.5 1,412.'6 533.0 198.0 963.5 1,249.5:
IE Headquarters ATV PRI 3
PPT 32.0 PTG' 91.0 1
C00
-7.0 4
O n'
'.__.-l'"
~
Harris 1 - Summary'
-IE Headquarters and ' Regional ' Offices -
- Professional Staff Hours By Activity Codes Exclude From Fee Recovery
.FY 1978'-
.FY 1979' FY~1980 FY 1981 FY 1982_-
'FY 1983' PCI-
.5.0 101-PEl 8.0
. Subtotal IE Headquarters:
138.0; 5.0.
Total Excluded From Fees:.
48.5:
1,550.6 538.0.
198.0:
963.5 1,249.5 GRAND TOTAL ALL HOURS::.
- 213.5 3,649.1 2,171.5 1,763.0-3,378.5 4,697.5~
~l
-+
e O
.__-_______n
4 OCT 2 319H E.MORANDUM FOR: Files FRON:
C. James Holloway. Jr. Assistant Chief. License Fee Management Branch. ADM
$UBJECT:
AND CONTRACTUAL SERVICES COS susuarizes the results of our review of th printouts professiona(Enclosure 2) provided by IE-HQ and the Regions.
puter l requier hours expended by IE-HQ and the regional staffs Of the 20.124.1 June 23, 1984..'4.223.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have been included for fee recovery IE has no record of any contract costs for Harris 1.-
purposes.
'E Ped C. James IIolloway, Jr.
C. James Holloway License Fee Manage. Jr., Assistant Chief ment Branch Office of Administration
Enclosures:
As stated
_ DISTRIBUTION Actual Manaower File WOM111er..FMB CJHo110way. LFMB DWeiss. LFMB (,u(,%s M d i)
LFMB R/F
/
Cg$
ay/qf,
'* 10/ l EuANeo/84 l
'^~~~ ~~~ 5FriEikf 6EE5R5~cbW~~~~ ~~~~
cuoue 4wa,egeed
._ - _ ___ __ __