ML20066J910
| ML20066J910 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/12/1984 |
| From: | Bidinger G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML082420195 | List:
|
| References | |
| FOIA-90-162 NUDOCS 9102050144 | |
| Download: ML20066J910 (2) | |
Text
,
stribution:
1 7 --
- 4. -
Rket 70-2947
~
- NMSS R/F 12/12/84 FCUP R/F VLTharpe_
.e, DOCKET NO.
07602947 MEMORANDUM FOR -WILLIAM 0.
MILLER, CHIEF g/vn439t /
LICENSE FEE MANAGEMENT BRANCH 0FFICE OF ADMINISTRATION pgggggd /
FROM:
G.
BIDINGER URANIUM FUEL LICENSING-BRANCH-DIVISION OF FUEL CYCLE & MATERIAL SAFETY OFFICE OF HUCLEAR MATERIALS SAFETY AND SAFEGUARDS SUBJECT COSTS AND MANHOURS FOR LICENSING ACTION
-THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE A CATION DATED 07/01'/81 ARE TABULATED'BELOW FOR LICENSEHNO.
- 1. HAME:
ILLINDIS POWER CO.
P. O.
BOX 511 DECATUR, IL. 62525 2.
A) CASEWORK CONTROL NO. 07002947N0tS B) MAIL' CONTROL NO.
C) TAC NO.
- 3. A) PERIOD COVERED (STAFF HOURS)- 07/01/81 - 09/30/81 B) COMPLETION DATEt 09/30/81 C) AMENDMENT NO.
NEW LICENSE ISSVED A
4'. CONTRACT COSTS ASSOCIATED WITH THIS APPLICATI0H1 4'O-PERIOD COVERED (CONTRACT COSTS)
S.
TAC WORK BY OTHER OFFICESt' 0-HOURS
- 6. HOURS DURING REPORTING PERIOD:
2 0. 0 <
7.
CEE CNARGABLE ::$
760 8.
TOTAL COST TO PROCESS APPLICATION-t 4.760 '
/M APPROVEDI 4AKl g* BRANCH CHIEF ~
N 1 h>W R.
PAGE BIDINGEA PROJECT-MANAEER URAHIUM FUEL LICENSING BRANCH j020 j 4 90o92J WILLI A, M90-162 PDR
[q e
I, x
+
-k.k 6 -
l i
(9 ATE REGULATORY-INFORMATI0H: TRACKING: SYSTEM-PAGE
'12/84-DETAIL LISTING OF HOURS REPORTED-ON CASEWORK 19 PERIOD COVERED:
07/01/81 - 09/30/81 ROJECT MANAGER: GN BIDINGER CASEW0ks HUMBERt- 07002947H01S ACILITY NAME8 ILLINDIS POWER CO.
- DATE' CLOSED: 09/30/81-NATURE OF ACTIVITY:
NEW LICENSE STORAGE OF FUEL REGULAR a
REVIEWER WEEK ENDING-NOURS i
.....................................................r.......
THE FOLLOWING WERE CALCULATED AT t 38-4 PER NOUR GN BIDINGER.
08/08/81 12.5 i
GH BIDINGER
-09/05/81-
.1. 0 GH-BIDINGER
'09/12/81 4.0 GN BIDINGER 09/19/81 1.5 GH BIDINGER 09/26/81 1.jl
-2...
t 4
I i
Distribution:-
Docket 70-2947 i
NMSS R/F
-l p
l
/1 /84 t
I t-i
)
1 f
l DOCKET NO.t 07602947 1
MEMORANDUM FOR WILLIAM 0.
MILLER, CHIEF
- 8#80 LICENSE FEE MANAGEMENT BRANCH 1
0FFICE 0F ADMINISTRATION FROMI H. KETZLACH URANIUM FUEL LICENSING BRANCH i
DIVISION OF FUEL CYCLE &-MATERIAL SAFETY 0FFICE OF NUCLEAR MATERIALS-I SAFETY AND SAFEGUARDS l
SUBJECTt COSTS AND MANHOURS FOR LICENSING ACTION THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE APPLI-CATION DATED 07/01/81 ARE TABULATED BELOW FOR LICENSE NO.
1.
NAME ILLINDIS POWER CO.
P.
O.
BOX 511 DECATUR, IL. 62525 2.
A) CASEWORK CONTROL NO. 070029470105 B) MAIL' CONTROL NO. 19394 C) TAC NO.
- 3. A) PERIOD COVERED (STAFF HOURS) 07/01/81 - 06/23/84 B) COMPLETION DATE REVIEW ACTIVE C) AMENDMENT NO.
4.
CONTRACT COSTS ASSOCIATED WITH THIS APPLICATION 0
PERIOD COVERED (CONTRACT COSTS) 5.
TAC WORK BY CTHER OFFICES:
0 HOURS L
- 6. HOURS DURING REPORTING PERIODI 392.0H.
7.
FEE CHARGABLE 14896 l_
8.
TOTAL COST TO PROCESS APPLICATION : 8 14896 "
APPROVEDI O
AJ d.I Oh I'
RT PAGE-p.KETZLACH\\
/[ BRANCH CHIEF WROJECT MANAGER URANIUM FUEL LICENSING BRANCH i
,Y J,
.., ~
. l...
RU10 DATE REGULATORY INFORMATION TRACKING SYSTEM PAGE 12/12/84 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 20 PERIOD COVERED:
07/01/81 - 06/23/84 PROJECT MAMAGER: N KETZLACH CASEWDRK HUMBER: 07002947010S FACILITY NAME: ILLINDIS POWER CD.
DATE CLOSED: ACTIVE NATURE OF ACTIVITY:
POSSESS & STORE REACTOR FUEL REGULAR REVIEWER WEEK ENDING
......................................................NOURS THE FOLLOWING WERE CALCULATED AT 38 4 PER HOUR BL SERINI 11/07/81 0.0 BL SERINI 01/09/82 1.0 BL SERINI 01/09/82 1.0 BL SERINI 01/09/82 6.0 BL SERINI 01/16/82 8.0 BL SERINI 01/16/82 20.0 BL SERINI 01/23/82 2.0 BL SERINI 01/23/82 10.0 BL SERINI 01/30/82 2.0 BL SERINI 01/30/82 12.0 BL SERINI 01/30/82 14.0 BL SERINI 02/06/82 8.0 BL SERINI 02/06/82 8.0 BL SERINI 02/06/82 16.0 GH BIDINGER 02/06/82 BL SERINI 4.0 02/13/82 BL SERINI 8.0 02/13/82 16.0 BL SERINI 02/13/82 4.0 GH BIDINGER 02/13/82 BL SERINI 1.0 02/20/8?
BL SERINI 12.0 02/27/82 BL SERINI 8.0 02/27/82 GH BIDINGER 2.0 02/27/82 BL SERINI 1.0 04/10/82 BL SERINI 14.0 04/17/82 BL SERINI 2.0 04/24/82 BL SERINI 2.0 04/24/82 BL SERINI 3.0 04/24/82 3.0 BL SERINI 05/01/82 4.0 GH BIDINGER 05/01/82 BL SERINI 1.5 05/08/82 BL SERINI 8.0 05/08/82 8.0 GH BIDINGER 05/08/82 BL SERINI 2.0 05/15/82 7.0 GH BIDINGER 05/15/82 1.0 BL SERINI 05/22/82 BL SERINI 15.0 05/22/82 2.0 GH BIDINGER 05/22/82 2.0 BL SERINI 05/29/82 BL SERINI 3.0 06/05/82 BL SERINI 1.0 07/10/82 14.0 f
- ,. - =..
{
-REGULATONY'kbFORMATIONTRACKINGSYSTEM PAGE tun DATE 12/12/84~
DETAIL LISTING OF HOURS REPORTED ON CASEWORX 21
- i PERIOD COVERED:
07/01/81 - 06/23/84 PROJEC1-MANAGER -N KETZLACH CASEWORK NUMBER: 070029470105 REGULAR REVIEWER WEEK ENDING HOURS:
THE FOLLOWING WERE. CALCULATED AT 1 38 4 PER:. HOUR BL SERINI
-11/13/82-
'3.0-BL SERINI 01/01/83 10.0 BL SERINI 01/08/83 9.0 BL SERINI 01/22/83
-1.0 BL SERINI 02/19/83 3.0 BL SERINI
.02/26/83 2.0' BL SERINI' 03/05/83 1.0
.i N
KETZLACH 05/07/83 3.5 DL SERINI 05/21/83 6.0 BL SERINI 07/02/83 6.0 BL SERINI 07/30/83 3.0.
BL SERINI
-08/06/83 1.0-BL SERINI 08/13/83 8.0 BL SERINI 08/20/83 1.0 t
BL SERINI 09/10/83
--1.0 BL SERINI 09/17/83 2.0.
BL SERINI 10/01/83
.2.0 AL SOONG
-10/22/83 4.0 BL SERINI 10/29/83 2.0-AL 500NG-11/26/83 4.0 AL SOONG
-12/03/83 4.0 AL~SOONG 12/10/83 8.0 AL SOONG 12/17/83 4.0-l BL SERINI 01/28/84
' 13. 0..
l
-BL SERINI 02/04/84-'
2.0 BL SERINI
.05/19/84 5.0-Al SOONG 05/26/84 4.0 BL'SERINI
-05/26/84
-13.0
'BL-SERINI 06/02/84~
2.0
)fv.o 4
. -.L.2 J
=. - - -
~ - -
Distribution:
' + - -
'=
DricleT7F2Y47-12/12/84=
IHSb N/I'
.FCUP R/F.
VLTharpe DOCKET NO.t 07'00294' M/
0 5000 4 /
MEMORANDUM FORT WILLIAM 0.
MILLER,-CHIEF LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION F R Nil N. KETZLACH URANIUM FUEL LICENSING BRANCH DIVISION OF FUEL CYCLE-&-MATERIAL SAFETY.
OFFICE OF NUCLEAR MATERIALS _
SAFETY AND SAFEGUARDS SUBJECT COSTS AND MANHOURS FOR LICENSIllG. ACTION THE CONTRACT COST,5 INCURRED AND MANHOURS USED'IN REVIEWING THE APPLf-CATIDH DATED 04/25/83 ARE TABULATED BELOW FOR LICENSE NO..
i.
1.
NAMEt -ILLINDIS POWER CO.=
P.
O.
BOX 511 DECATUR, IL. 62525 2.
A) CA'SEWDRK CONTROL NO. 070029470205 B) MAIE CONTROL.NO. 22241-C) TAC NO.
- 3. A) PERIOD COVERED'(STAFF H00RS)--04/25/83'- 08/31'/83 B) COMPLETION DATE:
08/31/83 C) AMENDMENT NO.
1 4 '. CONTR ACT COSTS ASSOCI ATED WITH-THIS' APPLIC ATIDHt 6 0 PERIOD COVERED (CONTRACT' COSTS) 5.
TAC _ WORK BY OTHER OFFICESI O
-HOURS 6.
HOURS DURING REPORTING PERIODI 54.0 e 7.
FEE CHARGABLE 8'
'2052 8.~ TOTAL COST TO: PROCESS APPLICATION t-0 2052 /
IAcI d'di OttL APPROVE-R.
PAGE KET2LACH
- ?
D. (
BRANCH CHIEF
' ROJECT: MANAGER URANIUM FUEL-LICENSING BRANCH s
e
+
e
>k t
1
~
(-
..=9, I
Up DETE REGULATO Y TNFORMAT108 TRACT (ING SYSTEM'-
PAGE
)
2/12/84 DETAIL LISTING OF HOURS REPORTED ON CASEh0RK 22-PERIOD COVERED 04/25/83 08/31/03 r
l PROJECT MANAGER BL SERIHi CASEWORK, NUMBER: 070029470205 FACILITY HAMEt ILLIN01,5 POWER CD.-
DATE CLOSE'O t-C8/31/83-l l
NATURE OF ACTIVITYt -
l SNH-1886 AMEND EXPIRAT30H DATE & ADD POSSES LINITE l
REGULAR REVIEHER-WEEK ENDING HOURS
--. ~.
THE FOLLOWING WERE CALCULATED AT 1138'4 PERiHOUR-DL SERINI=
JO*//09/63 5.0-BL SERINI 07/23/83' 1.D.
BL SERINI 07/30/83 1.0-BL SERINI 06/06/03 4 ', 0 AL SDONG 08/13/83-2.0 BL-.SERINI 08/13/83-
- 3.0 At SOONG 0.8/20/83=
3.0 BL SERINI 08/20/33 ti. 0 AL 500NG 08/27/83 2.0 BL SERINI
-08/27/83 10.0-AL SOUNG 09/03/83 4.0 BL SER.INI 09/03/83-13 !
l -
l O
I i
i 1
1 u
1
,a-n.
,i+~
.-m-
-e n