ML20066K192
| ML20066K192 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/12/1984 |
| From: | Ketzlach N NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML082420195 | List:
|
| References | |
| FOIA-90-162 NUDOCS 9102050213 | |
| Download: ML20066K192 (3) | |
Text
._
Distribution:
~ EcE'eD O M 32 NMSS R/T 12/12/84 FCUP R/F VLTharpe DOCKET NO.8
'07002932 formrW & N l MEMORANDUM FOR WILLIAM 0. MILLER, CHIEF gppgg LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION FROM I
N. KETZLACH URANIUM FUEL LICENSING BRANCH DIVISION OF FUEL CYCLE & MATERIAL SAFETY OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS SU B.l E C T I COSTS AND MANHOURS FOR LICENSING ACTION THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE APPLI-CATION DATED 07/10/80 ARE TABULATED BELOW FOR LICENSE NO.
1.
NAME TEXAS UTILITIES ELECTRIC CD.
400 NORTH OLIVE STREET DALLAS. TX. 75201 2.
A) CASEWDRK CONTROL NO. 07002932010S B) MAIL CONTROL NO. 16814 C) TAC HO.
- 3. A) PERIOD COVERED (STAFF HOURS) 07/10/80 - 02/14/83 B) COMPLETION DATE:
02/14/83 C) AMENDHENT NO.
NEW LICENSE ISSUED-4.
CONTRACT COSTS ASSOCIATED WITH THIS APPLICATION 0'
PERIOD COVERED (CONTRACT COSTS) 5.
TAC WORK BY OTHER OFFICES: 0 HOURS l
- 6. HOURS DURING REPORTING PERIODI 106.0
7, rg; ;tl ARGABLE 4
4028' 8.
TOTAL COST TO PROCESS APPLICATION 8 6-4028
! (. /[wl N 1. bist_.
APPROVE ty r
4 R.
PAGE KETZLACi BRANCH CHIEF PROJECT MANAGER URANIUM FUEL LICENSING BRANCH 9102050213 900921 PDR FOIA WILLIAM 90-162 PDR
l RUN DATE REGULATORY INFORMATION TRACKING SYSTEM PAGE i
12/12/84 DETAIL LISTING OF HOURS REFORTED ON CASEWORK 23 PERIOD COVERED:
07/10/80 - 02/14/83 PROJECT MANAGER N
KETZLACH C n G E W C...i.iU M L... us0029320105 FACILITY NAMEt TEXAS, UTILITIES ELECTRIC CD.
DATE CLOSEDI 02/14/83 NATUP.E OF ACTIVITY STORAGE OF FRESH FUEL AT REACTOR SITE REGULAR REVIEWER WEEK ENDING HOURS THE FOLLOWING WERE CALCULATED AT 38 4 PER HOUR N
KETZLACH 10/11/80 10.0 N
KET2LACH 10/18/80 3.5 N
KETZLACH 10/25/80 2.0 N
KETZLACH 11/01/80 2.0 H
KETZLACH 12/20/C0 3.5 N
KETZLACH 12/20/80 0.5 N
KETZLACH 12/20/80 1.0 N
KET2LACH 12/27/80 4.5 N
KET2LACH 01/03/81 1.0 N
KETZLACH 01/10/81 0.5 N
KETZLACH 01/10/81 0.5 N
KETZLACH 01/17/81 0.5 N
KETZLACH 04/25/81 3.5 N
KETZLACH 04/25/81
. 0. 5 N
KETZLACH 05/02/81 1.5 N
KETZLACH 05/02/81 1.5 H
KETZLACH 05/09/81 0.5 N
KETZLACH 05/09/81 1.5 N
KET2LACH 05/16/81 4.0 N
KET2LACH 05/23/81 0.5 N
KETZLACH 06/20/81 0.5 N
KET2LACH 06/27/81 0.5 N
KETZLACH 07/04/81 0.5 N
KETZLACH 07/11/81 0.5 N
KETZLACH 08/08/81
't. 0 N
KETZLACH 08/08/81-5.0-N KETZLACH 08/15/81 2.5 N
KETZLACH 08/22/81 1.0 N
KETZLACH 08/29/81 0.5 i
N KETZLACH 08/28/82 0.5 N
KETZLACH 12/04/82 0.5 I
N KETZLACH 12/11/82 10.5
.N KETZLACH 12/18/82 8.0 N
KET2LACH
'12/25/82
- 9. 0 -
N KETZLACH 01/01/83 1.0 N
KETZLACH 01#01/83 1.5 N
KETZLACH 01/08/83 2.0 H
KETZLACH 01/15/83 8.b H
KET2LACH 01/22/83
-2.5 N
KETZLACH 02/05/83 2.5 N
KETZLACH 02/12/83
?
. ~
RUN DATE REGULATORY INFORMATION TRACKING SYSTEM PAGE 12/12/84 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 24 PERIOD COVERED 07/10/80 - 02/14/83 PROJECT MANAGER N
KETZLACH CASEWORK HUMBERt 070029320105.
REGULAR REVIEWER WEEK ENDING.
HOURS THE FOLLOWING WERE CALCULATED-AT t 38 6 PER NOUR N
KETZLACH 02/12/83 2.0 N
KETZLACH 02/19/83 1.0 N
KET2LACH 02/19/83 1.0 n.
/d6.4 4
t r
i