|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20029D0001994-04-22022 April 1994 Notification of 940505 Meeting W/Entergy Operations, Cleveland Electric,Illinois Power & Excel Services Corp in Excel Services Corp,Rockville,Md to Discuss Application of Policy Statement Criteria to Conversion Submittals ML20029C5751994-03-24024 March 1994 Submits Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity. Record Copy ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20046C5731993-07-20020 July 1993 Notifies of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Level Instrumentation for Plant ML20045F2711993-06-30030 June 1993 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section of Written Operating Licensing Exam Administered on 930609.W/o Encl ML20036A1931993-05-0505 May 1993 Notification of 930506 Meeting W/Utils in Rockville,Md to Discuss Status of BWR/6 Owners Group Improved Standardized TS Submittal ML20035G5541993-04-23023 April 1993 Notifies of Forthcoming Meeting W/Util on 930505 in Rockville,Md to Discuss Relaxed Tolerances for Plant Safety Relief Valve Safety Setpoints & Inservice Testing Requirements ML20035F9081993-04-20020 April 1993 Notification of 930427 Meeting W/Util in Rockville,Md to Discuss Hydrogen Control & Final Analyses Per 10CFR50.44 ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20043C4881990-05-31031 May 1990 Notification of 900618 Monthly Mgt Meeting W/Util in Rockville,Md to Discuss Plant Operations & Recent Events of Interest ML20012E9371990-03-22022 March 1990 Forwards Current Status of Implementation of USI at Facility.Status Summary Based Upon Licensee Response to Generic Ltr 89-21,discussions W/Licensee & Review of Available NRC Records & Info ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review 1999-07-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20196L0051999-07-0808 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Recently Signed Asset Purchase Agreement Between Illinois Power & Amergen Energy Co & Proposed Transfer of License to Be Submitted to NRC ML20206F2481999-04-22022 April 1999 Informs That Operational Readiness Insp Team Completed Insp at Clinton Power Station Including Two Weeks on Site & Two Separate Instances of Continuous 72 Hours Control Room Observation.Operational Performance Adequate ML20206F2361999-04-21021 April 1999 Documents Completion of Insp Activities Performed During Week of 990412,to Assess Licensee Implemented & Planned Corrective Actions Associated with NRC Manual Chapter 0350 Case Specific Checklist Restart Item II.1 ML20206F2331999-04-19019 April 1999 Discusses Results of Clinton Power Station Corrective Action Insp & Recommendations to Close Demand for Info Ltr.Insp Team Focused on Operations,Maintenance & Plant Support Organizations ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20198S0601999-01-0606 January 1999 Notification of 990121 Meeting with Util to Discuss Potential Change to Clinton Degraded Voltage Relay Setpoints ML20154L1161998-10-14014 October 1998 Notification of 981027 Meeting with Util in Rockville,Md to Discuss Licensee Proposed Mod of keep-fill Sys for Feed Water Sys Check Valves to Eliminate Containment Leakage Concern ML20154J9271998-10-13013 October 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901 ML20154J7921998-10-13013 October 1998 Forwards NRC Operator Licensing Retake Exam & Insp Rept 50-461/98-301(OL) Administered on 980901 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237D6711998-08-25025 August 1998 Notification of 980917 Meeting W/Util in Rockville,Md to Hold NRC Insp Manual Chapter 0350 Restart Panel Meeting W/Illinois Power to Discuss Progress of Clinton Power Station Toward Restart ML20217C9761998-03-24024 March 1998 Forwards NRC Operating Licensing Exam Rept 50-461/97-313OL (Including Completed & Graded Tests) for Tests Administered on 980126-0202 ML20217C9871998-03-24024 March 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980126-0202 ML20197B6811998-03-0606 March 1998 Notification of 980319 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Fix for Issue of Degraded Electrical Grid Voltage ML20198R5561998-01-16016 January 1998 Notification of 980127 Meeting W/Illinois Power Co in Rockville,Md to Discuss Potential Fix for Issue of Degraded Voltage ML20199L0221997-11-24024 November 1997 Notification of 971211 Meeting W/Illinois Power Co in Clinton,Il to Discuss Findings of NRC Special Evaluation Team ML20210T2701997-09-11011 September 1997 Notification of Significant Licensee Meeting W/Util on 970924 to Discuss Objectives,Scope & Schedule of Special Evaluation Team Evaluation of Integrated Safety Assessment Being Conducted by Illinois Power Co ML20210H7531997-08-0505 August 1997 Informs That Licensee Restart & Performance Review Panel Has Determined That Plant Has Satisfactorily Completed Items & Corrective Actions Identified as Restraints to Restarting of Cps,W/Exception as Listed ML20149E8691997-07-16016 July 1997 Notification of 970717 Meeting W/Util in Rockville,Md to Discuss Voltage Available from 345 Kv Offsite Electrical Supply & Possible Effect on Plant Equipment in Case of Accident ML20140C3151997-04-0202 April 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss License Amend Application ,re Degraded Voltage Setpoints & Proposed Administrative Actions ML20137F3391997-03-26026 March 1997 Notification of 970421 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Re Thermo-Lag Fire Barriers & Ampacity Derating ML20136F3351997-03-0505 March 1997 Forwards Southwestern Electric Cooperative 970228 Request for Hearing,Submitted in Response to Fr Addressing Commission Consideration of Issuance of Order Approving Transfer of OL from Soyland Power to Illinois Power Co ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134L6581996-11-19019 November 1996 Notification of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Soyland Power Cooperative Minority Ownership of Facility to Illinois Power Marketing Inc ML20029D0001994-04-22022 April 1994 Notification of 940505 Meeting W/Entergy Operations, Cleveland Electric,Illinois Power & Excel Services Corp in Excel Services Corp,Rockville,Md to Discuss Application of Policy Statement Criteria to Conversion Submittals ML20029C5751994-03-24024 March 1994 Submits Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity. Record Copy ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20056F3811993-08-12012 August 1993 Notifies of 930830 Meeting W/Util in Rockville,Md to Discuss Licensee GL 89-10 Valve Testing Program Schedule ML20046C5731993-07-20020 July 1993 Notifies of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Level Instrumentation for Plant ML20045F2711993-06-30030 June 1993 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section of Written Operating Licensing Exam Administered on 930609.W/o Encl ML20036A1931993-05-0505 May 1993 Notification of 930506 Meeting W/Utils in Rockville,Md to Discuss Status of BWR/6 Owners Group Improved Standardized TS Submittal ML20035G5541993-04-23023 April 1993 Notifies of Forthcoming Meeting W/Util on 930505 in Rockville,Md to Discuss Relaxed Tolerances for Plant Safety Relief Valve Safety Setpoints & Inservice Testing Requirements ML20035F9081993-04-20020 April 1993 Notification of 930427 Meeting W/Util in Rockville,Md to Discuss Hydrogen Control & Final Analyses Per 10CFR50.44 ML20127B6031993-01-0707 January 1993 Summarizes 921217 Telcon Re Implementation of Erosion/ Corrosion Monitoring Program Per Generic Ltr 89-08.Response Acceptable Contingent on Commitment to Formalize Procedural Controls ML20058B1721990-10-25025 October 1990 Notification of 901102 Meeting W/Util in Rockville,Md to Discuss Util Approach on Performing IPE W/Nrc & Contractors ML20059B3281990-07-19019 July 1990 Discusses Author Observation of INPO Evaluation Process at Clinton Nuclear Power Plant on 900514-25.Recommends That NRC Observe Addl INPO Evaluations.Description of INPO Process & List of Qualifications & Experience of INPO Members Encl ML20043C4881990-05-31031 May 1990 Notification of 900618 Monthly Mgt Meeting W/Util in Rockville,Md to Discuss Plant Operations & Recent Events of Interest ML20012E9371990-03-22022 March 1990 Forwards Current Status of Implementation of USI at Facility.Status Summary Based Upon Licensee Response to Generic Ltr 89-21,discussions W/Licensee & Review of Available NRC Records & Info ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20206L8841988-11-17017 November 1988 Forwards Fr Notice of Proposed Amend to License NPF-62 Re Merger of Soyland Power Cooperative,Inc & Western Illinois Power Cooperative,Inc & Request for Comments on Antitrust Issues ML20206C5861988-11-0909 November 1988 Notification of 881213 Meeting W/Util in Rockville,Md to Discuss Tech Spec Interpretation Re Inoperability of Sys Providing Support Function ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20206F2011988-11-0202 November 1988 Discusses Tech Spec Interpretation Re Inoperability of Sys Providing Support Function.Actions to Close Out Listed ML20154J0191988-09-16016 September 1988 Responds to Request for NRR Assistance on Allegation Re Containment Integrity & Inservice Testing Program.Safety Significance of Not Performing Inservice Testing of Certain Affected Valves During First Yr of Plant Operation Minimal ML20207D6321988-08-11011 August 1988 Responds to 871027 Request for Technical Assistance in Interpretation of Tech Spec 4.1.5.B.3.Any Standby Liquid Control Sys Valve Which Could Affect Amount of Flow Delivered to Reactor Should Be Considered in Flow Path ML20195D4011988-06-17017 June 1988 Forwards Evaluation of Items Identified by NRC Inspectors During 1980-87 That Required Significant Corrective Actions by Licensee.Addl 10-15 Instances Noted Where Inspectors Found Problems W/Util Methods to Close Out Items ML20195D8371988-06-0303 June 1988 Notification of 880623 Meeting W/Hydrogen Control Owners Group in Rockville,Md to Discuss Emergency Procedure Guidelines for Mark III Containments.Attendees Listed ML20154L3021988-05-19019 May 1988 Informs That Settlement Stipulation Along W/Egm 88-01 & Paragraph B of Regional Procedure 1460 Reviewed.No Further Action Required Based on Review 1999-07-08
[Table view] |
Text
.
~ wW '
~
[,pa w Ig i
out j
i UNITED STATES j
q 5
o\\
NUCLE AR REGULATORY COMMISSION k
WASHINQ10N, D. C. 20555 g
10/13/84 DOCkiT NO.I (15000461 ME MO$'.'NDUM FOR t W1'.LIAM U. MILLER. CHIEF LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION FROMt C.
HILLMAN MATERIAL TRANSFER SG LICENG1HG BRANc8 DIVISI0ft OF SAFEGUARDS OFFICE OF NOJLEAR HATI"ZALS SAFETY AND SAFEGUf a 0's SUBJECTt COSTS AND MANHOURS FOR LICEN9tNC ACTIDH THE CDHTRACT COSTS INCURRED AND MANHOURE CATIGE DATED 05/18/82 ARE ?ABULATED BELON:UtQb IN R[VlktCNG THE APPLI-1.
NAME:
CLINTON 1 500 SOUTH 27TH STREET DECATUR, IL. 62525 t
2.
AJ CASEWuRK CONTTOL NO. 05600461260K
- 0) MAIL CON 7ROL NO.
C) TAC NO.
- 3. A) PERIOD COVERfD (STAFF htT;5) 05/18/B2 - 06/22/82 B) COMPLETION DATEt 06/22/B2 L1 AMENDMENT NO.
4.
BONT R A' C T PERIOD COVEREDCOSTS ASSOCIATED WITH THIS APPLICATION:
(CONTRACT COSTS)
$0-5.
TAC WORK BY OTHER OFFACES2 0
HOURS 6.
HOUR S DURI NG R El'02 T ING - PF'R IOD 1 4.0-7.
FEE CHARG.'.BLE t 6 152 8.
TOTAL COST TO PRM ESS APPLICAYION$
152
/.PPROVE [
7~~$7TRI~~'~~
NO
/
6
~~
BRANCH C H 1'E F C.
HILLMAN
~
MATERIAL. T R At1S FE R SG LICENSING BRANCHPROJECT MANAGER 910:10D0166 90092)
PDR FDM 14.ILLI AM7'O-162 PDG t
_J
t i
,J.
f I
D A'T E REGULATORY 'lNFORMATION TRACKING SYSTEH PAGE I
3/84 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 6
PERIOD COVEREDI 05/18/82 - 06/22/82 il l
5 10 JECT MANAGE!:t Cft N!LLMAN CASEWORK NUMBERI c5000461260K tCILITY NAME CLINTON 1,
DATE CLOSEDI 06/22/82 NATURE OF ACTIVITY IPC-CAT !! TRANSPORTAT!DN PLAN REVIEW REGULAR REVIEWER WEEK ENDING H09RS THE FOLLOWING WERE CALCULATED AT I 48 $_PER HOUR i
CR HILLMAN 06/05/62 1.0 CR HILLMAN 06/26/82' 3.0 Ye e '.
r 9
s i
e t
e 4
4
+
1 I
a i
s.
-I 4
k
.-s..-..
P" O
O p5"""'*%
UNITto St Af t8 k
NUCLEAR REGULATORY COMMissl0N g*
g
}
wasmwatow. o.c. rosso
/
0C1331984 MEMORANDUM FOR: Files FROM:
.C. James Holloway, Jr., Assistt9t Chief. License fee Management Branch, ADM
SUBJECT:
IL-HQ AND REGIONAL nFTICE' PROFESS 10NAL STAFF HOURS AND CONTRACTUAL SERVICES COSTS - Clinton 1 i summarizes the results of our review of the Clinton 1 com-puter printouts (Enclosure 2) )rovided by IE-HQ and the Regions. Of the 16.367.5 professional regular 1ours expended by IE-HQ and the regional staffs through June 23, 1984 16.143 hours0.00166 days <br />0.0397 hours <br />2.364418e-4 weeks <br />5.44115e-5 months <br /> have been included for fe.a 2
recovery purposes.
IE has no record of any contract costs for NMua %
i g
(
N ames o loway, Jr., Assistant telef cense fee Management Branch Office of Administration
Enclosures:
As stated 1
p.7,dI n
.T k-a ng
'i L[
.I-
......1 I~
l
I
" ~ " " T " l " *'*
0 0
SUMMARY
- CLINTON 1
. Regional Offices and IE Headquarters Professional Regular Hours Fiscal Year include Exclude Reatonal Offices For Fees From Fees Totals FY1976 167.0 7.5 174.5 1977 644.5 644.5 1978 721.0 721.0 1979 1,322.5 44.5 1,367.0 1980 2,242.0 60.0 2,302.0 1981 2,324.5 2,324.5 1982 2,242.0 2,242,0 1983 3,799.0 3.799.0 1994 (Through 6/23/84) 2,460.5 l,460.5 TOTAL REGIONS 15,923.0 112.0 16,035.0 IE Headquarters FY1980 3.5 3.5 1983 97.0 97.0 1984 (Through 6/23/84) 12_30 109.0 232.0 TOTAL IE HEADQUARTERS 220.0 112.5 332.5
')
GRAND 10TAL ALL HOURS 6,143.0 224.5 16,367.5 1
4 0
CLINTDet 1 IE HEADQUARTERS AND REGIO M L OFFICES Professional St4ff Hours By Activity Codes page 1 Include for Fee Recovery FY 1976 FY 1977 FY 1978 FY 1979 FY 1980 FY 1981 FY 1982 FY 1983 FY 1984 TOTALS Regional Offices Activity Codes ITO 73.5 323.5 450.5 15.0 262.5 ITV 40.0 223.0 218.0 481.0
- )ITX 25.0 66.5 16.0 8.0 115.5 2TO 13.$
- 23.0 32.0 68.5 2Td 8.0 4.0 4.5 16.5 ZTX
- 7. 0 4.5 11.5 DOC 566.5 748.0 725.5 824.5 1,579.0
- t. 0 4,974.5 PAP 218.0 400.5 39LC 508.0 939.5 495.5 2,952.5 PPI 515.0 1,091.5 1,208.0 909.5 1.280.5 1.082.0 6.086.5 2.0
- 2. 0 PSA APO 76.5 76.5 API 199.5 199.5 APP 76.0 76.0 3
Subtotal Regions 167.0 644.5 72L O 1,322.5 2,242.0 2,324.5 2,242.0 3,799.0 2.460.5 15.923.0 IE Headquarters 97.0 123.0 220.0 LRA Tota. Included For Fee Nevery 167.0 644.5 72LO 1,322.5 2 242.0 2.224.5 2.242.0 3,896.0 2,583.5 16,143.0 e
+
.s
,/
s
CLINTON 1 IE HEADQUARTERS AND ktGIONAL OFFICES Professional Staff h rs By Activity Codes Encieserv 1 page 2
-Exclude From Fee Recovery FY 1976 FY 1977 FY 1978 FY 1979 FY 1980 FY Is91 FY 1982 FY 1983 FY 1984 TOTALS Regioreal Offices Activity Codes 215
- 7. 5 7.5 PRPt 30.0 30.0 JCM 12.5 52.0 64.5
~
pp,q 8.0
- 8. 0 APA.
2.0 2.0 Subtetal Regions 7.5 44.5 60.0 112.0 "IE Headquarters IDY 89.0 89.0 IDI 20.0 20.0 PTG 3.5 3.5 Subtotal IE HQ 3.5 109.0 112.5 Total Excluded ee Fees 7.5 44.5 63.5 109.0 224.5
.r GRA W TOTAL ALL HOURS 174.5 644.5 721.0 1,367.0 2,305.5 2,324.5 2,242.0 3,896.0 2.692.5 16.367.5 e
O
0 9
OCT a j m MEMORANDUM FOR:
Files FRON:
C. James Holloway. Jr. Assistant Chief. License Fee Management Branch ADM
$UBJECT:
IE-HQ f.ND REGIONAL OFFICE PROFES$10ML STAFF HOURS-AND CONTRACTUAL SERVICES COSTS. _r.linton 1 Enclosure I summarizes the results of our review of the Clinton 1 com-puter printouts (Enclos:!r* t) )rovided by IE-HQ and the Regions. - Of the 16.367.5 professional regular wurs expended by_ IE-HQ and the regional staffs through. June 23, 1984, 16.143 hours0.00166 days <br />0.0397 hours <br />2.364418e-4 weeks <br />5.44115e-5 months <br /> have been included for fee recovery purposes.
IE has no record of any contract costs for Clinton 1.
'6?gned C J tm ll llo owsy, Jr.
.e C. James Holloway. Jr.. Assistant Chief License Fee Managment Branch Office of Administration
Enclosures:
As stated i
3 I
O!$TRIBUTION:
Xctual Manpower File WOMiller. LFMB CJHolloway. LFMB($s M /
DWalss. LFMB LFMB R/F ff$W LBMB:ADPI
-new
=...
.4
.......A
..t
....4.4.
4
.#46*..a..
....4
""".10/ MM..
ic ronu m no-noi Nacu creo OFFICIAL RECORD COPY-
_