Forwards Background Info on Facility Per 860924 Request. Proposed Agenda for Chairman Lw Zech 860914-15 & Commissioner KM Carr 861050-06 Site Visits Encl
ML20212G040
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1986
From: Rehm T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Milhoan J
NRC
Shared Package
ML20212F990 List:
References
FOIA-86-843 NUDOCS 8703050248
Download: ML20212G040 (9)


Text

s' pur

. /* uq'o, o

UNITED STATES [

NUCLEAR REGULATORY COMMISSION

{ ,I WASHINGTON, D. C. 20555

~~/ ne u as s-72

.-4 MEMORANDUM FOR: Jim Milhoan, Assistant cn to Comissioner Carr p

FROM: T. A. Rehm, Assistant for Operations 6 Office of the Executive Director "

for Operations y

SUBJECT:

BACKGROUND INFORMATION ON SHEARON HARRIS NUCLEAR POWER PLANT FOR COMMISSIONER CARR Per your request of September 24, 1986, attached is the background information on Shearon Harris nuclear power plant for Comissione'r Carr.

Background information was provided by the Region II Office. Licensing Status for Shearon Harris was provided by the Licensing Project Manager, NRR.

Excerpts on site location and area maps were obtained from the FSAR.

If you have any questions, please contact me.

f -

T. A. Re ..., Mid for Operations Office of the Executive Director for Operations

Attachment:

As stated cc w/ Background Information w/o Atchs:

A. Tipton, OCM (Zech)

C. Ader, OCM (Roberts)

5. Droggitis, OCM (Asselstine)

J. Meyer, OCM (Bernthal)

J. N. Grace, Reg. Admin., RGII B703050248 870303

[ p M -843 PDR -_

Officia Copy Ek

BACKGROUND INFORMATION ON SHEARON HARRIS NUCLEAR POWER PLANT Utility: Carolina Power & Light Location: 20 Mi SW of Raleigh, North Carolina Wake & Chatham Counties, North Carolina Docket No.: 50-400 CP Issued: 1/27/78 Low Power License: Expected: October 1986 Full Power License: Expected: November 1986 Reactor Type: PWR Power Level: 900 MWe; 2775 MWt Architect / Engineer: Ebasco Services, Inc.

NSSS Vendor: Westinghouse Constructor: Daniel International Turbine Supplier Westinghouse Condenser Cooling Method: Natural Draft Cooling Tower Condenser Cooling Water: Harris Reservoir Licensing Project Manager: Bart Buckley, NRR (Tel: 492-9799)

HRC Responsible Region: Region II, Atlanta, Georgia J. Nelson Grace, Regional Administrator Malcolm L. Ernst, Dep. Reg. Admin.

Div. of Reactor Projects: Roger D. Walker, Div. Director (Tel: 8-242-5179)

(Region II) Luis A. Reyes, Dep. Div. Dir. (Tel: 8-242-5623)

Dave Verrelli, Branch Chief (Tel: 8-242-5535)

Paul Frederickson, Section Chief (Tel: 8-242-5649)

Larry Mellen, Project Inspector (Tel: 8-242-5350) l Senior Resident Inspector: George Maxwell (Tel: 8-919-362-0602) l Resident Inspector: Stephen Burris (Tel: same)

Report Coordinated By: Linda N. Undervood, RM/BMI (Tel: 8-492-4977)

Management Personnel (Carolina Power & Light)

S. H. Smith Jr. (Sherwood), President / Chief Executive Officer E. E. Utley (Ed), Executive Vice President

  • R. A. Watson (A1), Vice President, Harris Project
  • J. L. Willis (Jim), Plant General Manager
  • G. A. Myers (Gary), General Manager-Milestone Completion
  • 0nsite i

1 9/26/86

~

~

Shearon Harris Nuclear Power Plant Workforce Currently 4,808 total at the site (CP&L + contractors). Target for operations (by 1987): 485 CP&L 'and 424 contractors Workshifts Harris plans to have 5 shifts. The rotation will allow every fifth week to be utilized for training or other operations tasks. Each shift will be 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Shift Manning: 1 shift foreman (SRO licensed) 3 SR0s (SRO licensed) 3 R0s (R0 licensed) 4 Aux operators (None)

Other Licensed Personnel: Manager of Operations Operations Supervisor Director of Regulatory Compliance Director of Simulator Training 8 other non-supervisory personnel Reactor Operators Total licensed operators - 55 Total SR0s - 43 Total R0s - 12 i

Reactor Operator Exams Administered by the Region Date of Number of

-Exas Applicants Passed Failed 11/85 31 SR0s 30 SR0s 1 SRO

, 3 R0s 3 R0s 0 R0 5/86 23 SR0s 14 SR0s 9 SR0s 11 R0s '9 R0s 2 R0s l

Date of next scheduled exam: 9/87 with 8 SR0 applicants NOTE: A plant simulator was not on site at the time the 11/85 exams were administered; therefore, the simulator exams were waived for this group of applicants.

The exams administered in 5/86 included a simulator exam (simulator on site and now operational). Due to the high simulator failure rate from the 5/86 group (a pass rate of only 68%), Region II decided to administer simulator exams to those issued operator licenses from the j

11/85 group. Of this group (11/85), 16 simulator exams were adminis-tered during the week of 9/22/86. Test results are not yet available.

The remainder of the 11/85 licensed operators will be administered simulator exams during the next month or so.

I 2 9/26/86

~~

Shearon Harris Nuclear Power Plant Plant Simulator, located at Harris Energy and Environmental (E&E) Center (14 miles from site) and operational in January 1986 Systematic Assessment of Licensee Performance (SALP)

A SALP review was conducted for the period of May 1,1984 through October 31, 1985 and a report issued on January 15, 1986. A copy of the report is attached. A prelicensing SALP is in progress with an ending date of July 31, 1986.

Escalated Enforcement Actions None Emergency Preparedness (covered in Att. 1)

Full scale drill 5/18/86 Similar drill scheduled 10/28/86 Emergency Response Facilities (ERF)

Emergency Operations Facility (EOF) - located in E&E Center Technical Support Center (TSC) - located in Fuel Handling Building Operational Support Center (OSC) - located in Service Building The 1985 full scale exercise demonstrated the functioning of these facilities.

Plant Status The site was initially planned for 4-units, but is now a single unit site.

The plant is 98% complete. Major construction work remaining involves cable and conduit installation, cable termination, installation of fire wrap and sealing of penetrations. ESF testing is the major remaining preoperational test. The site has successfully completed cold hydro, hot functional testing, integrated leak rate testing and fuel receipt. The applicant's estimated fuel load date is September 1986, but Region II believes a mid-October date to be more realistic.

Region II is reviewing a cable separation problem which also impacts QA/QC effectiveness and which must be resolved prior to fuel load.

See attachment 1 for Licensing Status of Shearon Harris Unit 1.

3 9/26/86

.o. .

Shearon Harris Nuclear Power Plant Public Issues An intervenor group, Chatham Coalition for Alternatives to Shearon Harris (CASH) is active in the area and has specifically questioned the adequacy of the Emergency Response Plan.

Attachments:

1. Licensing Status of Shearon Harris 1, draft dated 9/26/86
2. SALP Report dated 1/15/86
3. Site Location and Area Maps 1

l 1

l l

4 9/26/86 l

l

1 PROPOSED AGENDA 0F CHAIRMAN LANDO W. ZECH, JR.'S~

VISIT TO SHEARON HARRIS NUCLEAR POWER PLANT Sunday, September 14,-1986 4:45 p.m. Dr. Grace, P. Fredrickson, and K. Clark depart for Raleigh,lC N on Delta flight 968 5:50 p.m. Region II party arrives in Raleigh and departs for Howard Johnson's (Grace and Fredrickson) and Radisson Plaza (Clark) i Monday, September 15, 1986 8:00 a.m. Chairman Zech, and his_Special Assistant, David Humenansky leave Washington, D.C.

on Piedmont flight 233 8:55 a.m. Chairman's party ' arrives at the Raleigh, NC airport and is met by the Regional Administrator, J. Nelson Grace, and the Harris Region II Section Chief, Paul Fredrickson 10:00 a.m. Party arrives at Harris site and completes appropriate badging 10:15 a.m. Party visits NRC residents' office 10:30 a.m. Chairman's party, Region II personnel, and CP&L representatives meet in Administration Building conference room for CP&L presentation i 11:15 a.m. Party commences plant tour with stop at control room and discussion with on-shift operators 12:00 noon Chairman meets with other available operators in Start-up Section con #erence room 12:15 p.m. Working lunch in Technical Support Center 12:45 p.m. Continue plant tour 2:00 p.m. Travel to Harris Energy and Environmental (E&E)

Center 2:15 p.m. N Chairman's party tours simulator and training laboratory facilities 1-f/K- -

.e .

3:00 p.m. Chairman's debrief-in E8E Board Room 3:45 p.m. Chairman conducts press conference 4:00 p.m. Chairman's party departs Harris site for Raleigh airport 5:28 p.m. Chairman's party departs Raleigh airport for Washington, DC (Dulles) on United flight 1678 6:30 p.m. Dr. Grace departs Raleigh airport for Atlanta, GA on DL 247 I

i d

k i

. e 7 ,

PROPOSED AGENDA 0F COMMISSIONER KENNETH M. CARR VISIT TO SHEARON HARRIS NUCLEAR POWER PLANT Sunday, October 5, 1986 h p.m. Regional Administrator, Dr. J. Nelson Grace gjg departs for Raleigh, NC on-Od te flight-968-

-560 p.m. Dr. Grace arrives in Raleigh Ek /917 5l3%

Monday, October 6, 1986

.6.50 a.m. Harris Region II Section Chief, Paul E. Fredrickson, departs for Raleigh, NC on Delta Flight 960 7:55 a.m. Fredrickson arrives in Raleigh, NC 8:00 a.m. Comissioner Carr and his legal assistant.

Stephen G. Burns leave Washington, D.C. on Piedmont flight 233 8:55 a.m. Comissioner's party arrives at the Raleigh, NC airport and is met by Dr. Grace and Paul Fredrickson 9:45 a.m. Party arrives at Harris site and completes appropriate badging 10:00 a.m. Party visits NRC residents' office 10:15 a.m. Conar.lssioner's party, Region II personnel, and CP&L representatives meet in Administration Building conference room for CP&L presentation 10:45 a.m. Party comences plant tour with emphasis on walking down CVCS 12:15 p.m. Working lunch in Technical Support Center 12:45 p.m. Continue plant tour 2:15 p.m. Travel to Harris Energy and Environmental (E8E) s Center

\

2:30 p.m. '

Comissioner's party tours simulator and observes several simulator evolutions

.f/S -

.w

\

2 3:45 p.m. Comissioner's party tours training and laboratory facilities (as time permits) 4:00 p.m. Comissioner debrief in E&E Center Board Room 4:15 p.m. Commissioner's party departs Harris site for Raleigh airport 4+4S-p .m . Comissioner's party departs Raleigh airport for 4:3Ty Washington, DC (

1p d on "r.i' g flight g 6:30 p.m. Dr. Grace and Paul Fredrickson departs Raleigh airport for Atlanta, GA on DL 247 i

l l

l l

l l