Forwards Rev 0 to Rept on 1990 Eddy Current Exams of TMI-1 OTSG Tubing, Fulfilling Requirements of TS Section 4.19.5.b Re Rept Frequency of Inservice Insp of OTSG Tubes
ML20066K351
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 01/31/1991
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20066K353 List:
References
C311-90-2159, NUDOCS 9102050278
Download: ML20066K351 (1)


Text

.

GPU Nuclear Corporation 9 Nuclear  ;;emgreo Middletown, Pennopvania 17057 0191 717 944 7021 TELEX 84 2380 Writer's Direct Dial Number.

Janttyy 31, 1991 ,

C311-90-2159 1

l l

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l

Dear Sir:

i

Subject:

Three Mile Island Nuclear Station, Unit 1 (TM1-1) '

Operating License No. DPR-50, Docket No. 50-289 Refueling Interval BR Once Through Steam Generator (OTSG) Tube inspection Report Technical Specification (TS) section 4.19.5.b requires that the complete results of each inservice inspection of OTSG tubes be reported to the NRC within 12 months following completion of the inspection.

GPUN performad oddy current examinations of the OTSG tubing during refueling interval BR and during the unscheduled shutdown designated 8U1. These examinations were completed during February and March 1990, respectively.

Attachment 1, " Report on the 1990 Eddy Current Examinations of the TMI-1 OTSG Tubing," fulfills the requirements of the above cited Technical Specification for the examinations identified above.

Sincerely, M

T. G. hton Vice President and Director, TM1-1 TG3/EJP/ pip cc: TMI-1 Project Manager ,