Second Interim Deficiency Rept Re Significant Const Deficiency 54 Concerning Tube Steel (Ht 16600) Laminations, Initially Reported 820511.Final Rept Delayed Until 820811
ML20063D816
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/30/1982
From: Lendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0375, W3K-82-375, NUDOCS 8207130150
Download: ML20063D816 (1)


Text

LOUISIANA f 242 OcLAnONoe sineer POWER & L1GHT/ P O 80X 6008

  • NEW OnLEANS. LOUISIANA 70174 * (504) 366 2345

'$E$tbEsSIO u

June 30, 1982 G. D. McLENDON Senior Vice President W3K-82-0375 Q-3-A35.07.54 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 l;

- k@hj l

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 k6g!fI7 i Significant Construction Deficiency No. 54

" Tube Steel (llT 16600) Laminations" L-h Second Interim Report J

Reference:

1) LP&L Letter W3K-82-0271 to NRC dated May 11, 1982
2) Telecon - R. Bennett (LP&L) to L. Martin (NRC) on 6/25/82

Dear Mr. Collins:

Due to the extent of work required to complete corrective action on Significant Constructiou Deficiency No. 54, we are unable to issue the Final Report as earlier committed.

Activities relating to this action should be satisfactorily completed to enable the Final Report on Significant Construction Deficiency No. 54 to be submitted by August 16, 1982.

If you have any questions, please let us know.

Yours very truly, GDMcL/LLB/grf Attachment I cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (N

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatety Commission Washington, D. C 20555 8207130150 820630 PDR ADOCK 05000382 S PDR