ML20063A242

From kanterella
Jump to navigation Jump to search
Third Interim Significant Const Deficiency Rept 54 Re Tube Steel (Ht 16600) Laminations.Final Rept Will Be Submitted by 830213,not 820816,as Previously Indicated
ML20063A242
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/16/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0513, W3K-82-513, NUDOCS 8208240256
Download: ML20063A242 (1)


Text

I OU1SIANA f 342 DeanONOe S1neer POWE R & LIG H T/ P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 uTuS$$vs$

August 16, 1982 G D McLENDON Senior wce President W3K-82-0513 Q-3-A35.07.54 Mr. John T. Collins, Regional Administrator, Region IV f~

U. S. Nuclear Regulatory Commission --_ _

611 Ryan Plaza Drive, Suite 1000  ; l~Tj__ ~

i l~r

E

? -I ! ' a // f c..Ih f, L ~ ~~

Arlington, Texas 76012 f

SUBJECT:

Waterford SES Unit No. 3 W

  1. E I 919& [ I Docket No. 50-382 i Significant Construction Deficiency No. 54 f-

" Tube Steel (HT 16600) Laminations" ~

Third Interim Report

Reference:

LP6L Letter W3K-82-0375 to NRC dated June 29, 1982

Dear Mr. Col lias :

The final report on Significant Construct!on Deficiency No. 54 was to be submitted by August 16, 1982. We are unable to meet this committed date.

Work to complete the corrective action is approximately sixty percent xmplete. The rer.ainder of the work, involving interf acing between contractors will be finished by February 18. 1983 at which time the final report on Significant Construction Deficiency No. 54 will be subtrit ted .

If you have any questions, please contact us.

Very truly yours, N A GDMcL/LLB/grf cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555