Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
_ -. .-
xVD C3 CM 23 0 0)
>* OPEHAIING PATA REPORT
- So DGCl;ET NO. 50-266 no 0
- d DniE August 6, 1982 8 '"
o$
O(D COnPLETED BY C, u. FAY "U N w ccyO TELEPHONE 414 277 2811 26 0FERATING STATUS
- 1. UNIT NAnE: POINT SEACH NUCLEAR FLANT UNIT 1 . NOTES .
- 2. REPORTING PERIOD: JULY 1982 . .
- 3. LICENSED THEhnAL PGLEk (NUT): 1518. . .
- 4. NAnEPLAIE RATING (6ROSS MUE): 523.8 . .
- 5. DESI6N ELECTRICAL RAFIN3 (NET MWE): 4Y7. . .
- 6. MAXIMUM DEPENDABLE CAPA:ITY (GROSS MUE): 519. . .
- 7. MAXINUM DEPENDABLE CAPACITY (NET nuE): 495. .... ....................
S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NunEER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NOT APFLICABLE V. POWER LEVEL TO WHICH RE51RICTLu, IF ANY (NET NUE): 390.0
- 10. REASONS FOR RESTRICTIONS. (If ANY): Power level restricted because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.
Tit!S MCNTH YR TO DATE CUMULoilt'E
- 11. HOURS IN REPORTING PERIOD ?44 5,087 102,863
- 12. NUnBER OF HOURS REACTOR UAS CRITICAL 744.0 4.s63.1 85,016.3
- 13. REACTOR RESERVE SHUILOLN nuuRS 0.0 11.4 618.7
- 14. HOURS GENERAT0h GN LINE 744.0 4,632.5 82.604.7
- 15. UNIT RESERVE SHUTDOLN HOURS 0.0 27.4 791./
- 16. GROSS THERMAL ENERGY GENERATED (NUH) 873.382 5.680,774 113,033.614
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 289,150 1,598.230 37,Y19,510
- 16. NET ELECTRICAL ENER6Y GENERATED (nuH) '73,440
. 1,800.266 36,081,417
- 19. UNIT SERVICE FACTOR 100.0 ?1.1 80.3
- 20. UNIT AVAILABILIiY FACTOR 100.0 91.6 81.1
- 21. UNIT CAPACITY FACIPR (USING MDC NET) 74.2 71.5 71.8
- 22. UNIT CAFACITY FACIUR (USING DER NET) 73.9 71.2 70.6
- 23. UNIT FORLED OUTAGE RATE 0.0 0.J 2.9
- 24. SHUTDOWNS SCHELULED DVER NEXT 6 MONTHS (fYPE, DATE. AND DURATION OF EACH):
Five week refueling outage scheduled to begin November 5, 1982.
- 25. IF SHbiDOWh AT END OF REF0FT PERIOD, EsiinATED DATE OF STARIUF: NOT SHUILOWN DATA REPORTED AND FAC10RS CALCULATED AS REGULSTED IN NRC LETTER LATED SEPTEMBER 22, 1977
- ' e S 3 020 02786
. . N E O V 833687 0388981
. . S I 4 4 9 6 724 3 8877 A T 6,5 1 1, 1 1 , 9, 0,
. . E A R L 78 7 64 2
. . U d7 7 0 52
. . V E M U 3, 0, 3,
. I C 464
. . G 033 7
_ 1 7
. . , 9 1 1 1 . . R 1 O ,
8 . . P 2 . -
Y 2 E N 2 A . . R 9060 77071 W F 7 E . O R 2 7 . . T T 7207 0307 00760 : D E 8 . 2 S A 85 0 8368877 ) T B -
9 W . . A D 01 1, 2, 9, 5, h U M 1 4 L . C H E 1 . 1 . . O 54 4 9 1 8 A S T .
0 , C 4 E T 4 33 E P .
E 3
6 . . C N R 0, 0, 9, F T
O S 0 . . I E Y 421 O N 5 t Y E S L D s S N . . B N E
. u g O ) A O : T -
O D H . . 7 C I P A N u E P I T U D A T E . . H L A I G P 0000 R K R T
E E
L L
E . . U O
P A
H 4 4 04 0009 00660D 00950.U A T
E T
K E P T T .
C T M . S . R N 4 4 4 061 0099 S T
- O A O E H T 0 7 7 7 7 7,9,1 1 D E -
D D C .T .I O n N F L O N 73 6 A O
_ . N 3 S 1 7 5 C .
E I 1
,33 , E R
. . . . . . . .R : L H E T N -
E ) B T 1 T A
_ B EA A D N
. M WC D I
. U MI D 2 9 N L ,
E D 1 . TP E T E T 55S EP P A T I 9 M H A Y M S
- ( T I E N . 4 E
_ U 7 : T T ( T U
_ 9) I Y O ) S Q 4 E : ( N N H S E E T 8 W ) A u) H R N . M ES L ) MH ) ) T ,
A 83 : U G F : A H( W T T N D S
_ L 1 2) S M n I ) C W M EE O O A
_ T P 55ES i Y I nD( NN M I R 2 1 WO T T ,N T ( E R D R8 MR E A D A I T D CR 6 E E
_ O A9 GFR E RS d A E DE P T
_ P E E1 : : T ( ( T F CR t RT MD T A
- R L ) ) E Y CI U' l EA X T L
_ C Y T EN Y Y T I ( SO S ANR Gb E R U
_ A U L U W ( TTI R A P RR E E NN N O C _
T N U M N I I C T . DW UEGN I I P L A J ( GCCA SS O N O N E RSS R E A -
OUUEE R C D H S N A AP E N I P WE HE Y G
_ C R SI P P A RO ROO N GG T ( ( T V G A E OT AA C I E I DI N R Y C AD F S N E W R ACC HT PCT LW Y EG ARRR O R
_ I B OGR NECC A U OGNRRFOO D O _
T P( EEI LI I GE H NDR EEO I T EE D T
_ N C A T : LLL B H R N RSOT E NT Y CCGL
_ R ND LGABBRA WT I UN LECT AAAU t A E I OA NCA AUC S T S ER HE A AI FFT D F
_ P OI N I I DDCI OE RR VO b C LF L UE l O PRRT RN N CLT R O UR T LI A I Y YOH A D
_ S EEAT EEOP P OE A E ARCEBT T C N U P HRCPP P LR E HSR V MTI CAI I DSE N A
_ T : T EEE SA EO R EERRCRI LCCE N W A EG ELDDE VF F R N EEET VI AAC SO G D
_ T M NDT E GT E NO E S HLCRAPPR N N D E S AI E A nM NOLS I RGE T EEE VAAOW I T
_ NT S LNuU AN N RO R LSACCFO U R G R N PGM nH RO SET S SS E D H O N TOEEI I I C ES RBCR T SS TT T TT T S P
- E I I PC MSX X WA U M A UI OOTI I I I I U
- T NEI AE AA F OE O U EO N R REN NN NN H F R A UR LND M M 1 P R H NRH UGGN UUU UUS I .
R A _
E . . . . . . . . . . . . . . . . . . . . . . . . . T -
P 1 23 4 567S 90 1 234 5 678 901 234 5 A O 1 1 1 1 1 1 1 1 1 1 22222 2 D
, ! i!i{; , I ' ' 1l i 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE August 6, 1982 REPORT MONTH July, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 l -
m c M70 4 0- N oc4 Ew c e-e ~4 m a ,< u oo em o ou o mee om ao No. Date g gg g jjg Licensee Event gg y Cause and Corrective Action
! e :s :c o u .c Report No. to EU To Prevent Recurrence Q* M o f.o c o lE: 3 U 8
i J
1 l
l 1
l j
1 3 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)
E- Operator Training Er License Exam F- Administrative 5 4
AD-28B Exhibit I- Same G- Operational Error (explain) Source
]
(01-78) H- Other (explain)
._ , . _ - _ _ ~ _ _ . . _ . -
- ', 1; ,
- 4 41 , b: 'i i
( A 0D _
1- _
- 2 N .
78 o -
)
8B I
D _.
SF a _
t e _
- SF co
_ hr ec -
de ud egg e
)
4 l
e d Q:3ge4oc ,-
wlI
- g Mnn i
~
HGFEDCBAR N _
- e MOgoc a -
OOAORRMEs tp dp e e a q o he m e g fiu n CC 4jO' oW l
U R N e r ir u u n i: U.
3cj U4ct n E I ranaletp .
m P T titalem S3c gGo4o4 G O
( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D a iaR a Re N O en iEvie oi T W .
nrans rl ps H N
) r it u oe S o nr Tr re r gi ee t A c s E N
( &t t( Nv J D e i e
- o. ne u x
p Lo x p
l y
P in t O l c l ,
W .
a e a E i n i u eE 1 R n s n )g U 9
) e )
gO'ev 8 R 2 E _
E D x U a C m T I
Uosycsc4 u Q o O 3 N S
431lM e
t C OAMMh a tuaao Tu htnnd os eouu: e rmaa P all ra C _
( t en TO eiS vd EM D .
xcc p
e LP UO r nC EL NC -
lSa to PE IK acm r HT TE T
ir Rr OE na ee NDDN
) m cc E AAN ut BTMO 5 ri YEE.
rv AP5 SE ( Sate ee 4 1 C. u o 0 sx Nhtix n 4 g i -
uh Ueioh cA ri Reoni ec / Wu n 3 cb Etnsb t 2 . s t 0 si Gs i i 7 t 1 t - oft o 7 F B 0ffo n - a 6 e I 1o rG 2y , a
- 6rD - 8 c 1 API 1 1 h .
S ) Ltrn 1 9 .
a Eaes 8 U 2 n m R pt .
e Ear i Fnru t*
it c 2 lr -
ey l
DOCKET NO. 50-301
~
UNIT NAME- Point Beach Unit 2 .
DATE August 6, 1982 COMPLETED BY C. W. Fay
~
TELEPHONE. 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL
~
MONTH July, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL
~'
DAY MWe NET DAY MWe NET DAY MWe NET 4
1 453 11 487 21 460
'2 487 12 470 22 485
-3 487 13 487 23 480 4 477 14 487 24 473 5 487 15 486 25 '487 6 489 16 487 26 481 l 7 480 17 488 27 4f- -
8 481 18 471 28 480 9 468 19 473 29 471 10 487 20 484 30 473 31 484 AD-28A '
(1-77)
DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 .
DATE August 6, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH July, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 370 11 357 21 370 2 326 12 369 22 370 3 370 13 371 23 367 4 369 14 371 24 370 5 369 15 371 25 371 6 370 16 371 26 367 7 368 17 371 27 368 8 364 18 371 28 366 9 371 19 371 29 366 10 372 2d 371 30 368 i 31 369
! AD-28A (1-77)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 ;
Date August 6, 1982 ;
Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at an average of 480 MWe net from July 1, 1982 to the end of the reporting period with no significant load reductions. The net loss of 6 MWe net, approximately 1%,
was attributed to the warmer inlet water temperature of Lake Michigan. i The primary-to-secondary leakage in the init 2 steam generator remains less than 10 gallons.per day. l t
During an engineering evaluation of a Unit 2 wiring change, it was discovered that two of the three level instruments on the "C" boric acid storage tank were powered from a common instru-ment bus. Normally, this has no detrimental effects on plant operations. However, a break in the steam line and a coincidental loss of AC power would delay the opening of the boric acid storage tank valves to the high head safety injection system. The level indications would recover when voltage returns via the emergency [
diesel.
t Upon discovery and verification, preventative action was t taken by switching the Unit 2 safety injection pump suction to the "B" boric acid sto) age tank. Final action correcting the wiring will be performed after approval of a special mainte-nance procedure.
This event is reportable in accordance with Technical Speci-fication 15.6.9.2.A.2. The NRC regional office was notified >
on July 28, 1982 as was the Resident Inspector. Licensee Event i Report No. 82-005/01T-0 will be filed to describe the event.
Also on July 28, 1982, while completing seismic support work per IE Bulletin 79-14, contractor personnel created a pinhole leak while welding on the letdown divert line to the holdup tanks of the chemical volume and control system of Unit 2. The leak was isolated within 8 minutes by Operations. The line L was returned to service after repairs and inservice testing i approximately 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> later. This event was not red phone reportable, however, a 30-day Licensee Event Report will be filed with the NRC. ,
No safety-related maintenance was performed during this period.
i
)
~
i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.- 50-266
, Unit Name Point Beach Unit 1
< Date August 6, 1982 Completed By C. W. Fay Telephone 414/277-2811 ;
Unit 1 operated at an average of 367 MWe net from July 1,
. 1982 to the end of the reporting period with no significant ;
I load reductions. !
Following maintenance'on the "B" cryogenic gas compressor s l at approximately 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on July 6, 1982, there was a radio- f active gaseous leak in the cryogenic system. The leak.was isolated '
immediately by Operations, after a 2h minute unscheduled release of radiation. Another 60 minutes was spent purging the system.
l This release was approximately .377% of the 15-minute Technical !
- Specification limit and .173% of the hourly Technical Specifi- ;
cation limit. Although the release did not constitute a reportable l t event per the Licensee Event Report format, the event was reported j via the ENS to the NRC.
On July 15, 1982, at 1506 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.73033e-4 months <br />, there was a blown fuse -
discovered to the breaker for the "B" train redundant containment i spray discharge valve (IMOV-860D) which left the valve inoperable. i The remaining containment spray discharge valve of the "B" train was tested to verify its operability. The fuse was replaced, the valve was tested per IT-50 and returned to service at 1532 hours0.0177 days <br />0.426 hours <br />0.00253 weeks <br />5.82926e-4 months <br />.
This is a reportable event per Technical Specification 15.6.9.2.B.2 and Licensee Event Report No. 82-103/03L-0 is being submitted to cover the event. ,
I During a review of maintenance activity, it was discovered
~
- _ that the containment air particulate monitor and the containment ;
gas monitor were simultaneously out-of-service on July 15, 1982. ;
This is a reportable occurrence in accordance with Technical t
, Specification 15.6.9.2.B.2 and a 30-day Licensee Event Report -
L is currently being drafted to be filed with the NRC. {
Safety-related maintenance completed this month included i the replacement of seals in the Unit 1 "C" charging pump.
4 I
=