MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
. .
NorWiseri m Power Oossgiony I
414 Nicohet Man 'I' Minneapolis, Minnesota 564011927 Tolophone (612) 3S6600 l October 5, 1990 Prairie Island Technical Specification l Section 6.7.A.3 1 i
U S Nuclear Regulatory Commission i Attn: Document Control Desk i Washington, DC 20$$$
. .t PRAIRIE IS1AND NUCLEAR CENERATING PLANT r Docket No. 50-282 License No. DPR-42 !
50 306 DPR 60 Monthly Operating Report l Sentember. 1990 [
l Attached is the Monthly Operating Report for September 1990 for the Prairie ;
Island Nuclear Generating Plant. .;
i
'I Thomas M Parker Manager -
Nuclear Support Services
{
TMP/jlk ,
c: Director Office of Resource Management !
Regional Administrator-III, NRC :
NRR Project Manager, NRC I NRC Resident Inspector ;
MPCA i Attn: J V Ferman !
Attachment i 00072
/ph j
\\ !
9010110164 900930 !
PDR- ADOCK 05000282 R PDC
. . l i
n- NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE j 5
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 g DATE OCTOBER 2, 1990 i COMPLETED BY DALE DUGSTAD ,
TELEPHONE 612-388-1121-4376 i
MONTH: SEPTEMBER 1990
?
THE UNIT WAS BASE LOADED THIS MONTH, THERE WERE NO SHUTDOWNS. l 1
i 5
i CURRENT CONTINUOUS OPERATING RUN OF 215, DAYS.
s t
, I AVERAGE DAILY UNIT POWER LEVEL
]
' DOCKET NO. 5_0-282 ,
UNIT PRAIRIE ISLAND NO.1 l DATE OCTOBER 2, 1990, ,
COMPLETED BY DALE DUGSTAD :
TELEPHONE 612-388-1121-4376 !
)
]40 NTH: SEPTEMBER 1990 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 1 507 2 507 t 3 508 1 4 509 '
5 506-6 506 :
7 506 '
8 -510 t 9 505 '
10 510 , i 11 507 .
12 507 8 13 509 14 510 f 15 514 i 16 516 i 17 516 !
18 518 l 19 520 l
20 520 21 517 !
22 520 23 520 24 521
- 25. 519 !
26 517 27 519 5 28 518 ,
29 519 30 519 '
w AVERAGE LOADS ABOVE 520 MWE-NET ARE DUE '
TO COOLER CONDENSER CIRCULATING WATER l i
I i
l 1
t J'
OPERATING DATA REPORT
' l DOCKET NO. 50-282 i UNIT PRAIRIE ISLAND NO.1 i DATE OCTOBER 2, 1990 >
COMPLETED BY DALE DUGSTAD !
TELEPHONE 612-388-1121-4376 ,
OPERATING STATUS !
, 1. UNIT NAME: PRAIRIE ISLAND NO. 1 . ,
- 2. REPORTING PERIOD: SEPTEMBER 1990 NOTES: :
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593 ,
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530. i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):'534 !
- 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE): 503
- 8. IF CHANGES ~ OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NONE ,
- 9. PUWER LEVEL TO WHICH RESTRICTED, IF.ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMU LATIVE .
- 11. HOURS IN REPORTING PERIOD 720 6551 147191 '
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5651.2 124770.7-
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-LINE 720.0 5579.3 123227.6 i
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1185750 8766371 194127825 -
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392830 2882700 63675260 >
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 369565 2706028 59759362 ,
- 19. UNIT SERVICE FACTOR 100.0 85.2 83.7 '
- 20. UNIT AVAILABILITY FACTOR 100.0 85.2 83.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.0 82.1 80.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.8 77.9 76.6
- 23. UNIT FORCED OUTAGE RATE 0.0 0.6 5.7 !
- 24. FORCED OUTAGE HOURS 0.0 33.9 7516.4
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH) .
N/A
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A t
I w.,. y +
, ; i l
UNIT SHUTDOWNS AND POWER REDUCTION
~' DOCKET NO'50-282 l UNIT NAME PRAIRIE ISLAND NO. 1 !
DATE OCTOBER 2, 1990 I COMPLETED BY DALE DUGSTAD TELLEPHONE 612 _388-1121-4376
]
i MONTH: SEPTEMBER 1990 ;
l t
DATE' TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT ,
YY/MM/DD 000.0 ,
90/09/00 0 0.0 0 0 N/A N/A N/A NONE.
I f
I P
k TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT-IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-0THER l
l F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR >
H-OTHER v -
NARRATIVE
SUMMARY
OF OPERATING EyPERIENCE DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 !
DATE OCTOBER 2, 1990 I COMPLETED BY' DALE DUGSTAD-TELEPHONE 612-388-1121-4376 i i
MONTH: SEPTEMBER 1990 THE UNIT WAS IN COASTDOWN OPERATION FOR THE UPCOMING REFUELING !
OUTAGE SCHEDULED TO START AT 2000 OF THE 11TH. l i
RESULTS FROM A SAMPLE OF 2GT TRANSFORMER'S OIL INDICATED THAT GASSING l WAS OCCURRING DUE TO A HOT SPOT IN THE CORE STEEL. A DECISION WAS MADE TO TAKE.THE UNIT OFF-LINE SOONER THAN THE ORIGINALLY SCHEDULED OUTAGE FOR.
SAFETY AND EQUIPMENT PROTECTION. THE GENERATOR WENT-OFF-LINE AT 1800 OF-
~
THE 10TH AND THE REACTOR WAS MANUALLY SHUTDOWN AT 2153. THIS IS A' FORCED -
OUTAGE OF 26 HOURS. 4 THE REFUELING OUTAGE HAS HAD NO MAJOR PROBLEMS AND 2GT TRANSFORMER REPLACEMENT SHOULD NOT EXTEND THE OUTAGE.
T THIS ENDED A CONTINUOUS OPERATING RUN OF 147 DAYS.
\
i
?
CURRENT ONTINUOUS OPERATING RUN OF 000 DAYS.
i
I AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO. ,50-306 UNIT PRAIRIE ISLAND NO.2 DATE OCTOBER 2, 1990- ;
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: SEPTEMBER 1990 DAY AVERAGE DA'ILY POWER LEVEL (MWE-NET) ;
1 406 2 400 ;
3 395 4 391 ,
5 381 '
6 383 l 7 373 '
8 366 9 359 ,
10 242 !
11 -11 12 -3 l; 13 -3 14 -2 15 -2 -
1 16 -2 17 -2 18 -2 ,
19 -2 20 -2 l 21 -2 ,
22 -2 l 23 -2
! 24 -2 :
25 -1 26 -1 27 -1 :
28 -2 29 -2 ;
30 -2 :
'l AVERAGE LOADS ABOVE 517 MWE-NET ARE DUE ,
TO COOLER CONDENSER CIRCULATING WATER i
4 1 l
OPERATING DATA REPORT.
l DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO.2 DATE OCTOBER 2, 1990 COMPLETED BY DALE DUGSTAD j TELEPHONE 612-388-1121-4376 l
OPERATING STATUS
- 1. UNIT NAME: PRAIRIE-ISLAND NO. 2
- 2. REPORTING PERIOD:_ SEPTEMBER 1990 NOTES: ;
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593-
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 531 1
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 500
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): _ NONE- }
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE '
THIS MONTH .YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6551 -138309
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 237.9 5758.7 121660.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0- 0.0 1516.1 2
- 14. HOURS GENERATOR ON-LINE 234.0 5620.1 120388.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 9027549 190255796
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 295746
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 95760 2960450 617033'O
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 87524 2786271 58344Ca4 ;
- 19. UNIT SERVICE FACTOR 32.5- 85.8 87.0
- 20. UNIT AVAILABILITY FACTOR 32.5 85.8 87.0 '
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 24.3 85.1 84.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 22.9- 80.2 79.6 r
- 23. UNIT FORCED OUTAGE RATE 10.0 7.1: 3.2
- 24. FORCED OUTAGE HOURS 26.0 429.2 3975.0
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH): i REFUELING AND MAINTENANCE IN SEPTEMBER 12, 1990_,
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: OCTOBER 8, 1990 .
4
l
.4 ,,
)
UNIT SHUTDOWNS AND POWER REDUCTION j l
1 DOCKET NO 50-306 i UNIT NAME PRAIRIE ISLAND NO. 2 :
DATE OCTOBER 2, 1990 )
COMPLETED BY DALE DUGSTAD TELLEPHONE 612-388-1121-4376 1
l MONTH: SEPTEMBER 1990 l
DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT YY/MM/DD 000.0 90/08/14 S 0.0 C 5 N/A N/A N/A BEGAN COASTDOWN OPERATION.
90/09/10 F 26.0 A 1 N/A N/A XFMR 2GT TRANSFORMER GASSING PROBLEM.
90/09/11 S 460.0 C 4 N/A N/A N/A REFUELING AND MAINTENANCE OUTAGE.
/
i l
l l 1
l l
1 1
j TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP <
D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &- 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER F-ADMINISTRATIVE IEEE STD 803A-1983 i G-OPERATIONAL ERROR l H-OTHER
, . ,.