Third Interim Significant Const Deficiency Rept 37 Re Resistance Temp Detectors Failure.Requests Extension Date for Submittal of Final Rept Until 820806 Due to Mfg Shipping Delays
ML20054H900
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/17/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K82-0352, W3K82-352, NUDOCS 8206250158
Download: ML20054H900 (1)


Text

LOUISIANA / 14? ORARONDE STAFET POWE R & L1GH T/ P O DOX6008

  • NEW ORLEANS. LOUISIANA 70174 . (504) 366 2345 S

UtNtssfsYEP June 17, 1982 G D. McLENDON Senior Vice President W3K82-0352 Q-3-A35.07.37 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 f{hhkh f

l

~ ~ ~

j

^

Arlington, Texas 76012 EN 2 21982

~

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Interim Status Report of Significant Construction Deficiency No. 37

" Temperature Detectors (RTD's) Failure" Third Interim Report

~'

Reference:

1) LP&L Letter W3K82-0193 to USNRC April 1, 1982
2) Telecon - L. Martin (NRC) to I (LP&L) on June 16, 1982

Dear Mr. Collins:

The above referenced Interim Report on Significant Construction Deficiency No. 37 committed to a Final Report by June 15, 1982.

This problem has been addressed by DCN-NY-IC-654. The manufacturer has given notice of a shipping date late in June 82 for replacement / repair of equipment.

LP&L respectfully requests an extension date for the submittal of the Final Report until August 6, 1982.

Very truly yours, o

' /

CDMcL/LLB/ncd cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 5

2) Director Office of Management [ 7 Information and Program Control (

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ,

s G'206250158 820617 DR ADOCK 05000382 PDR 1