ML20054H349

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re 810109 Application for Amend to Upgrade License SNM-1107.Submittal Adds Demonstration Section for Idr Conversion Process
ML20054H349
Person / Time
Site: Westinghouse
Issue date: 03/26/1982
From: Nardi A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Jennifer Davis, Page R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
20481, LA-82-70, NUDOCS 8206230283
Download: ML20054H349 (2)


Text

"

l s

O O

1 LA 82-70 s

a 74 - //57

[

Westinghouse Water Reactor h 355 Electric Corporation Divisions PittsburghPtmsytvarua 15230 C

rr)

~

o l

sqc, ss' March 26, 1982 P

M

/g S

l Mr. John G. Davis, Director l'?

RECEIVED Office of Nuclear Material Safety and Safeguards I,

U.S. Nuclear Regulatory Commission

[

APR 1 1982 *

Ti Washington, D.C.

20555 i

u.s.g.g73.,yram l

l 9,

f t

Attention: Mr. R. G. Page, Chief 9,

a seten Qf7,u/

Uranium Fuel Licensing Branch 3

Q Gentlemen:

1

Subject:

Submittal of Additional Information to Application for Amendment to License SNM-1107, Docket 70-1151 (Revisi 5) c

References:

(1) Westinghouse Letter No. WRD-LA-276, A. T. Sabo to Y1Y-R. G. Page dated January 9, 1981.

e

,i n t

g.. cf, El v

Westinghouse Letter No. LA 81-275, A. J. Nardi to ;f ~ ? ; j7g 2

'Tg.

l (2)

R. G. Page dated December 23, 1981.

l

\\

(3) Westinghouse Letter No. LA 82-71 A. J. Nardi to b N1 John G. Davis dated March 26, 1982.

p The Westinghouse Electric Corporation hereby submits additional information to our application for amendment to upgrade the Columbia, S.C. Fuel Fabrication Plant (License SNM-1107, Docket 70-1151). The initial application regarding our proposal for improvement and upgrading of operations at the Columbia Nuclear Fuel Fabrication Plant was transmitted by letter dated January 9,1981

( Reference 1). That submittal consisted of proposed license conditions and environmental information related to the incorporation of the Integrated Dry Route (IDR) powder conversion process and related modified moderation control criteria.

By letter dated December 23,1981 (Reference 2), Westinghouse submitted a demonstration section for bulk UO2 powder handling and additional proposed license conditions pertaining to both IDR and bulk powder handling operations.

ReferencoLalso noted that additional information would be s ubmi tted.

ffp W jN b

N

/

%Er h

0

~ra p

zxs3.

g Q 21982 a k w ruran -

d lf71

/j k0

[A((kf[p'-

s 1

8206230283 820328

'e PDR ADOCK 07001151

(

C PDR

f~

O O

L

^

a Mr. John G. Davis I

Page 2 March 26, 1982 This submittal incorporates the demonstra ion section for the IDR conversion process and some additional proposed lic(nse conditions related to that process.

This application retains the designation of Revision 13 to the license application. The original January 9, 1981 date has been retained as the date of this amendment request.

Specific changed pages are sumarized in the included Revision Record pages.

Each page is marked in the margin to

[

identify the information which has been changed.

During the preparation of this submittal it was found to be desirable to renumber certain sections and pages which were transmitted by Reference 2 and to correct some errors in that transmittal.

In order to simplify your review of this application, all of the license application pages related to this amendment request have been included in this transmittal.

Therefore this

=

transmittal is complete in itself and thus it replaces the previous January 9, l981 (Reference 1) and December 23,1981 (Reference 2) letters. Attachment 2 of this letter sumarizes these changes for your reference. Additional proprietary information related to this application for amendment has been transmitted by Reference 3..

If you have any questions regarding this submittal, please contact me at the above address or telephone (412) 373-4652.

Very truly yours,

//

y A. J. Nardi, Manager NES License Administration

=

AJN/dr Attachment L__.