ML20247R413
| ML20247R413 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 06/23/1989 |
| From: | Nardi A WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Rouse L NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20247R417 | List: |
| References | |
| 25723, LA-89-48, NUDOCS 8908070454 | |
| Download: ML20247R413 (6) | |
Text
.
g-y unum 10
~
'70-//5/'
y I'OCgt C
LA 89-48 y
2 lJ 19g 1
t t-e
' kiio s\\~
Q llll{aWiear'g e
We' use D.1 R1 grc o
Ele
" C0rpark@
Mt
. g}
Jyt jggg
%' 7lgpg7 8C f g suu nass > ?
g coupporg)'
NUCLE Mal $.yEO
/h tW53 7b MAIL MCIl0N
.g\\
Al/'*
Yl]1~{\\ &
5000 SO DOCKET CLlVK E
f U. S. Nuc ra
. gulatory Commission ATTN:
Mr. Leland C. Rouse, Chief Fuel Cycle Safety Branch Division of Industrial & Medical Nuclear Safety NMSS M/S WF1 6H3 Washington, DC 20555 Gentlemen:
REF: Attached Letter Dated June 23, 1989 SNM-1107, Docket 70-1151 In the above referenced letter,. Westinghouse documents additional revisions to the Radiological Contingency Plan.
These revisions are designed to improve the plan and do not dilute or reduce the plan's effectiveness.
l Enclosed are Pages lii, vi, ix and 2.5-1 of License SNM-1107, updating Section 2.5, Site Emergency Plan.
I Since this revision does not dilute or reduce the effectiveness of the
. plan, no licensing fee is submitted.
If you have any questions, please write or telephone me at (803) l 776-2610, Extension 3247.
Very truly yours, A. J. Hardi, Manager NES License Administration 3m WP3020E:3p.1 cc:
G..
D. Bidinger
' Enclosures 7
890B070454 890623 y./b l
DR ADOCK 0700 1
(b i
The HtshnghouselbmmercialNuclearfuelDivisida-Wiinerofthe 1988MalcolmBaldrigeNahdnalOuaNyAward 25723 Yh
1 DOCKETNO.
b~!)S)__.
CONTROL NO.
M_7d DATE OF 000~)R11L_23,.M_7 DATE RC suk _ l _M FCAF-LPDR -
I & E REF.
SAFEGUARD 3 /
FCTC--
OTHER _
DATE 7 lh O_I INi rM_. _
l
V s
i SCHEDULE OF REVISlQNS e
Page Revision Page Revision
' Number Number-Number Number i
15 1.5-2 2
11 10 1.5-3 2
l-111 21 1.5-4 2
iv 3
- 1. 5-5 2
y is 1.5-6 2
vi 21 1.6-1 2
vii 14 1.7-1 2
r' viii 12
?.7-2 2
ix 21 1.8-3 2
1.0-1 2
1.8-2 2
1.0-2 15 1.8-3 2
1.1-1 2
1.8-4 2
1.1-2 2
1.8-5 2
1.2-1 2
1.8-6 2
1.3-1 2
1.8-7 2
1.3-2 11 1.8-8 2
1,3-3 2
1.8-9 2
- 1. 3 t.
2 1.8-10 2
1.3-5 2
1.8-11 2
1.3-6 2
1.8-12 2
1.3-7 2
1.8-13 2
1,4-1 2
1.8-14 2
1,4-2 2
- 1. 8-1 P, 2
1.4-3 2
1.8-10 2
1 4-4 2
1.8 17 2
1.43 2
1.8 18 2
1.4-6 2
1.8-19 2
1.4-7 2
1.8-20 2
1.4-8 2
1.8-21 2
i i
1.5-1 2
1.8-22 2
l-Docket No. 70-1151 Initial Submittal Date:
4/30/83 Page ao.
iii License No. "
-1107 Revision Submittal Date:
6/23/89 Revision No.
21
SCHEDULE OF REVISIQNS g
Page Revision Page Revision Number Number Number Number 2.0-1 15 2.3-11 2
2.1-1 2
2.3-12 2
2.1-2 20 2.3-13 2
2.1-3 20 2.3-14 2
2.1-4 2
2.3-15 3
2.1-5 2
2.3-16 deleted 2.2-1 2
2.3-17 2
2.2-2 2
2.3-18 2
2.2-3 16 2.3-19 2
2.2-4 3
2.3-20 2
2.2-5 3
2.4-1 3
2.2-6 2
2.5-1 21 2.2-7 2
2.6-1 5
2.2-8 2
2.7-1 3
2.2-9 20 2.7-2 3
2.2-10 20 2.7-3 2
2.2-11 2
2.7-4 2
2.2-12 4
2.7-5 2
2.2-13 4
2.7-6 2
2.2-14 15 3.0-1 2
2.3-1 4
3.1-1 2
2.3-2 4
3.1-2 2
2.3-3 3
3.1-3 2
2.3-4 2
3.1-4 2
2.3-5 2
3.1-5 2
2.3-6 2
3.1-6 2
2.3-7 2
3.1-7 2
2.3-8 2
3.1-8 2
2.3-9 2
3.1-9 2
2.3-10 3
Docket No. 70-1151 Initial Submittal Gate:
4/30/83 Page No.
vi License No. SNM-1107 Revision Submittal Date: _h/23/BS_ Revision No. _21
..(
REVISION RECORD
- Revi sion
Date of Number Revision' Paaes Revised Revision Reason
~
13 7/23/87 New pages 1.11-6 Added authorization for through 1.11-8.
off-site drying of.
calcium fluoride.
v 14 8/14/87 Revised page 4.5-1.
Added drying of calcium fiuoride to scope of operations.
Revised pages 4.8-1 Delete Western.Zirconiuht and 4.8-2.
as an authorized recipient of HF.
Revised page 4.1-1.
Update document date.
Revised pages 1.11-2, Added encapsulated 1.11-4, 1.11-5, and materials to briquetting 1.11-6.
description.
15 8/18/87 New pages 1.14-1 thru Added criteria to 1.14-5 and 2.2-14.
preclude foreign contaminants from UF6 cylinders.
16 1/25/88 Revised page 2.2-3.
Add interlock pressure requirement positive pressure gloveboxes.
17 2/8/88 Revised page 2.5-1.
Update of Emergency Plan Section.
18 5/25/88 Revised page 2.5-1.
Update of Emergency Plan Section.
19 8/12/88 Revised page 2.5-1.
Update of Emergency Plan Section.
20 9/30/88 Revised pages 2.1-2, Add frequency criteria 2.1-3, 2.2-9 and to the definitions 2.2-10.
Section.
Revised criteria for bulk containers.
21 6/23/89 Revised page 2.5.1.
update of Emergency Plan Section.
Docket No. 70-1151 Initia' Submittal Lde:
7/23/87 Page No.
ix License No. SNM-1107 Revis';on Submittal Date:
6/23/89 Revision No.
21
i I
^
s 2.4.2 Nonroutine and emergency operations involving SNM shall be performed only after the particular operation has been approved by the appropriate line management function and the Radiation Protection Component, consistent with the urgency of the situation in the event of an emergency.
All equipment specified as necessary to the operation by the line management function and radiation protection function shall be provided and operative.
3 2.4.3 A continuing program of surveillance, air sampling and smear sampling which it adequate to detect ventilation deficiencies and assure compliance with 10 CFR 20 limits, shall be conducted.
2.4.4 UF6 cylinders shall have valve covers in place when being moved except for those which have been processed and evacuated.
In the event that it is not practical to attach a valve cover to the cylinder, they may be transported without the valve covers provided that a supervisor or designee escort is provided (in addition to the individual operating the transport equipment), and the personnel involved with the transfers shall be knowledgeable in emegency actions to be taken in event of damage to the cylinder valve during the transfers.
2.4.5 Unless specifically exempted by license conditions, Westinghouse shall comply with the provisions of Title 10, Chapter 1, Code of Federal Regulations, Parts 19 and 20.
2.4.6 A Site Physical Security Plan and implementing procedures shall be maintained in accordance with 10 CFR 73.67.
2.5 Emeraency Plan Westinghouse shall implement,
- maintain, and execute the response measures of the Radiological Contingency
- Plan, submitted to the Commission on September 30, 1981, and supplemented on July 20, 1983, February 24 June 1, July 24, and September 11, 1984, July 18, 1985, September 18, 1986, January 29, 1988 February 8,1988, April 29,1988, August 12, 1988 and June 23, 1989.
Westinghouse shall also maintain implementing procedures for the Radiological Contingency Plan as necessary to implement the Plan.
This Radiological Contingency Plan and associated impi 4.nting procedures supersede the emergency planning requirements of 10 CFR 70.22(1) as they refer to onsite planning and notification procedures.
Westinghouse shall make no change in the Radiological Contingency Plan that would decrease the response effectiveness of the Plan without prior Commission approval as evidenced by a license amendment.
Westinghouse may make changes to the Radiological Contingency Plan without prior Commission approval if the changes do not decrease the response effectiveness of the Plan. Westinghouse shall Docket No. 70-1151 Initial Submittal Date:
4/30/83__
Page No.
2.5-1 License No. SNM-1107 Revision Submittal Date:
6/23/C9 Revision No.
21
_ _ _ _ _ - _ _