ML20054E476

From kanterella
Jump to navigation Jump to search
Informs That Final Deficiency Repts for Listed Items Will Not Be Submitted.Status Summary Included
ML20054E476
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/03/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3L-82-0320, W3L-82-320, NUDOCS 8206110254
Download: ML20054E476 (2)


Text

~-

1l..q, -9

- .a_

g l O 191 T 199 i S

Lo uisiama , ,4a Ouaeo, S1e<<1 __

P O W E F1 & L 1 G H T / P O DOX 0006

  • NEW OeLEANS. LOUISIANA 70174 * (504) 366 2345

$N?N s?N!s?tA June 3, 1982 G. D. McLENDON Senior Vice President W3K 0320 Q-3-A35.07 Q-3-A35.07.40 Q-3-A35.07.47 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Potential Reportable Incident No. 52 Significant Construction Deficiencies No.'s 40 and 47

Reference:

Telecon - R. G. Bennett (LP&L) to L. Martin (NRC) on 6/1/82

Dear Mr. Collins:

The final reports for the subject Significant Construction Deficiencies and the Potential Reportable Incident will not be submitted as previously committed. The following information explains the status of each item:

SCD #40 - ITE Could Starter Coil Failure in Containment Cooling Fans Due to the limited amount of rework remaining to complete the corrective action, a final report will be submitted by June 15, 1982.

SCD #47 - General Electric AKR 30/50 Circuit Breakers Closing Spring Screw Due to the amount of work necessary to complete the corrective action, the final report will not be submitted until June 30, 1982.

PRI #52 - Reactor Coolant Pump Supports - A490 Bolts

As the evaluation is complete and the report is being finalized, the final l report vill be submitted by June 7,1982.

Very truly yours, GDMcL/LLB/grf 8206110254 820603 b' DR ADOCK 05000382 PDR