Second Interim Rept of Significant Const Deficiency 36 Re Short Circuit Bracing in GE Vertical Lift metal-clad Switchgear Equipment.Submittal of Final Rept Delayed to 820215
ML20039G459
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/03/1981
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-81-0435, W3K-81-435, NUDOCS 8201180263
Download: ML20039G459 (1)


Text

. O

., .'2 LOUISIANA 34a ouAnONoE S1sur P O W E R & L 1 G H T[ P O box 6008

  • NEW CRLEANS, louts!ANA 70174 * [504) 3G6 2345 UTIUT'E3 SYSTEM December 3, 1981 o L ^se
u. n.o,. m vmaxtm W3K-81-0435 Q-3-A35.07.36 e

Mr. K. V. Seyfrit, Director, Region IV .

U. S. Nuclear Regulatory Commission 6 Office of Inspection and Enforcement REC 3NED B 611 Ryan Plaza Drive, Suite 1000 --

Arlington, Texas 76013 E JANI 51982 > F '

' siacut15csertcesegus

Subject:

Waterford SES Unit 3 g umor aaizaar at Significant Construction Deficiency No. 36 *

"Short Circuit Bracing in General Electric Vertical s Lift Metal-Clad Switchgear Equipment" R$

Y Second Interim Report

Reference:

Telecon to L. Martin (NRC) from L. L. Bass (LP&L) dated 11/30/81

Dear Mr. Seyfrit:

The final report on the subject item was due to be submitted by November 30, 1981. It was assumed that the required replacement material would be made available promptly by General Electric. This material has just now been received on site.

Another item that will impact the completion of corrective action is that much of the switchgear involved is energized and corrective action will require close coordination and cooperation with the LP&L Start-Up Group.

Based on the above, the submittal of the final report on Significant Construc-tion Deficiency No. 36 will be February 15, 1982.

Yours very truly, d6E D. L. Aswell DLA/LLB/grf cc: 1) Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8201180263 811203 [