LER 82-174/03L-0:on 821219,during Startup,Intermediate Range Monitor B Read Downscale.Caused by Disconnected High Voltage Cable.No Reason Known for Disconnected Cable.Personnel Will Be Trained on Use/Control of Degraded Equipment Log
ML20028E995
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/18/1983
From: Winterhoff D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20028E991 List:
References
LER-82-174-03L, LER-82-174-3L, NUDOCS 8301280328
Download: ML20028E995 (3)


Text

. ,

LILENbut CV EN 4 Mut'UM i CONTROL.8 LOCK: l l I I I l l (PLgASE PRINT OR TYPE ALL RE!UIRE3 INFOZMATIONI' iil It it It is t li l@lo lo l 10 UCENstNUM8EM lo b b b l_ lo 10 l@l 25 4111010 28 uctust TV,5 !0JO!@lsp CAT !l 60 @

a 9 UCENstE CCCE 14 15 l'4*T ,,p iil y',"' l L j@l 015 10 10 10 13 17 13 Si oOCKET Noungm 68 j@l es 1 gyENT 12 11 oATE 19 1824 1275l@l0ilIl18 REPORT DATE IB 12' e 80 l@

4 60 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 2l l On December 19,1982 at 1500 hrs. during Rx Startup. the Unit NSO observed IRM i i 31 l "B" reading downscale. Upon investigation, it was discovered that the High Voltage 1 3 64 l Cable leading to IRM "B" had been removed. Unit I was critical in the Startup Mode, f

, i3l l lech. Spec. Table 3.3.1-1, requiring 3 6perable IRM Channels per RPS Trip System, was 1 3gjl not violated. Safe operation of the plant was maintained at all times. l

] 111 _1 a 6 81 I I

Sots" Yo$E sun $a courcNewT ecoE sEde su'sEEe

! i i I I A lh [Djh 12lh IZ IZ IZ IZ I ZlZ l h [j_l h [JJ h 12 13 18 18 20 5 . 9 10 11 l SEQUENTIAL OCCURRENCE support REves0088 EVENT YEAA R E, ORT ho. CooE *(YPE NO.

LER

@ ,a g/Ro 18 I 21 1-1 I rl714 l M In I, I LLJ I--I 33 LaJ 21 22 23 24 26 27 28 29 30 32 f

N o o, 7 M MOuRs 5v8 Po nue. t MAN ER c l.xJ@laj@ L2.l@ jJ@ l of of olo I ltJ@ inJO IzJ@ It 19 b 19 l@

43 l

33 34 3S 22 40 el 41 4e 4y l CAUSE OCSCRIPTION AND CORRECTIVE ACTIONS h l

ii t ol l It could not be determined format reason the Hiah Voltaae cable leadina to IRM "B" l

l, i s i l had be'en disconnected. Training will be conducted with the Oper. Deot, on the use and I l ,,,; control of the Degraded Equipment Log. 1 I

is t ai l l

1 l 641 I

  • s ,owen oTwen sTArus @5EoYeEv' oescoveRv osscRerlos @

'sT0l.E L,A,,l@l ooprafnr okorvaHnn l l' i s l (B,,J@ lo lo lo l@l NA l

',!Tivm co'#Teur toenriono,astmas @

< trisco o,.it us.

  • uouuro,,emm

~a

@I i NA l

n is 'I 'L2.] @ 'Lz]@l " * "

, so~Nd neesses

~uo.ca Tm onscaimo~ @ g I

1 l7ll0IOl0 I

  • * ,.so~~l.%vLs " '

~uo... onscaimo~@

  • l.

. t a Ol l9 ol o l o l@l 12NA r 11 80

== o' o;a^ .wr^"" @ .

.I 1

I 9 l (Jjhl NA

' ' ' '8

' 83012803211 830119 NRC USE ONLY PDR ADOCK 05000373 ,

>: , o i in T@ot$emimosh issue l up S PDR [

68 49

[; lll;;;;g;;lj go. g 8 9 10 ^

vaur a pocoacra U. IllMiePhoff PHONE: M7J7hl

I. LER Number 82-174/03L-0 II. LaSalle County Station: Unit 1 III. Docket Number: 050-373 .

IV. Event Descripticn: ,

On December 19, 1982, at 1500 hrs. during Reactor Startup, the Unit NSO observed that IRM "B" was reading'downscale. Upon investigation by operations, it was discovered that the High Voltage cable leading to IRM "B" had been removed. A Caution Card, written by the Instrument Maintenance Department, was found attached to the cable stating "Use Caution when removing High Voltage Cable - Center Post of plug is broken - New one on order Work Request #21028 dated 12-13-82" IRM "B" had previously been declared Inoperative on 12-10-82 per Degraded Equipment Log entry.

V. Probable Consequences:

At the time of the occurrence, LaSalle Unit I was critical in the Startup Mode. The remaining 7 IRM's were operable. Technical Specification of Table 3.3.1-1 requiring 3 operable IRM channels per RPS Trip system was not violated. Safe operation of the plant was maintained at all times.

. VI. Cause:

The high voltage cable leading to the IRM #B" ' detector was last verified to be connected on December 13, 1982 when the Instrument Maintenance Department attached a Caution Card to the cable after troubleshooting IRM "B" according to LAP 1300-1 for Work Request

  1. L21028 It could not be determined for what reason the High Voltage Cable leading to the IRM "B" detector had been disconnected.

Since the installation of the High Voltage cable leading to the IRM "B" detector is not required for the Instrument Maintenance Department

! to satisfactorily complete LIS-NR-02, IRM Rod Block and SCRAM Functional Test, and since a cold startup was performed (i.e.:

IRM's were not on range till after the Reactor was critical), this

! condition was not previously observed.

{ VII. Corrective Action: ,

l Upon discovering the High Voltage cable leading to IRM "B" detector -

disconnected operations ininediately suspended startup. The High Voltage cable was reterminated and IRM "B" was placed in BYPASS.

A review panel was convened consisting of the Plant Superintendent, Operating Assistant Superintendent, Operating Engineer, Technical Staff Supervisor and Instrument Maintenance Supervisor to discuss the events leading to this report.

~

/

It was concluded that training will be conducted with the Operating '

Department on the use and control of the Degraded Equipment Log and the requirements to properly identify degraded equipment.

Prepared by - - -