LER 82-173/03L-0:on 821221,reactor Recirculation Coolant Sample Outboard Isolation Valve 1B33-F020 Failed to Close Upon Control Room Demand.Caused by Air Supply Solenoid Valve Sticking in Open Position.Solenoid Valve Cleaned
ML20028E702
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 01/19/1983
From: Houston R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20028E684 List:
References
LER-82-173-03L, LER-82-173-3L, NUDOCS 8301280129
Download: ML20028E702 (2)


Text

^~ - ' ^

(g).7);

LICENSEE EVENT REPORT CONTROL SLOCK: l i

l l l l l lh e

(PLEASE PRINT C1 TYPE ALL REaul!D INFb;MATIONI fliiB l 1 i L ltlS I c l 1 l@l 1501 01 -l 01 LICENst 01 01 oi o I -l 010 24l@l354 l 1EsCENSE NUW' LR

] O l01Type 0l@l JO l

67 CAT te lg 7 8 9 LICENstt CCCE l.

CON'T IoIiI 7 8 Z?Z leoL l@l 0 I 5101010131 81 DOCKET NwM8Em 713@l fA 09 il 2IEVENT 21118oATE 12 74l@l 0 l1REPORT 7S l1 ]9DATE l 8 l 380l@

EVENT DESCRIPTION AND PROS ABLE CONSEQUENCES h gl On 12/21/82 at 0300 hrs. during the performance of LOS-PC-Q1 Reactor Recirculation l 9 o ;3 g l Coolant Sample Outboard Isolation Valve, IB33-F020, would not close when demanded. g from the Control Room. The reactor was in the RUN mode at 24% MWT, 170 MWE. The g g o i.; l Io Isl l Reactor Recire. Coolant Sample Inboard Isolation Valve, IB33-F019, was deenergized g gl in the closed position per Technical Specification 3.6.3. g 10171 l l I

Lo.18J l

  • ^
  • ScEE Co$E s8 CIDE COMPONENT CCcE StaucodE E F6 Tin I s I o l@ Lt.J@ ln._j@ Lx] A l L l V l 0 ! p5 lh Wh20 W h 18 7 8 9 to 11 12 13

_ SEQUENTIAL OCCURRENCE secoRT REVISeiM EVENTvEAR RE* ORT No. CODE TYPE sec.

@ ,at,'jg LE R/Ro 18 12 I 28 22 l-j 23 i 1171 31 2 26 M

27 1013l 28 29 W

30 W

31 O32 KN A O oNP T M Hours 5 e iTT PC 34 3 . PPL aAAfe AcTURER Iz lofofoloI LLJ@ lw 12 15 i sig LEJ@lz l@ n l@ L.zJ@ L.2B O L.A J @

u 2. 2- v .i .,

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h I t Iol l The E.T.O. Air Supply Solenoid Valve for IB33-F020 was found to be sticking in the g

i ii; l open position. This caused the air operator of 1B33-F020 to keep the valve open. j l

Work Request L21436 was written to disassemble and clean the solenoid valve. This g

,, ,,,l work was completed on 1/7/83 a'nd the cample line was returned to service. p 1

li I A i l

'sTMY sPowea oTMeRsTATus @$isEoNa5 osecDVERY DESCRimON @

g gl LOS-PC-Q1 l1 15 l l B lg l0 l 2l4 lgl NA l l l AEnviTv Co'0 TENT RELE A$to CP Rf LE ASE LOCATION DP REMAst @

l1l6l @ @l AMOUNTNA oF" ACTIVITY l NA @ l l

ransoNNeL exposvAss Nuussa Tves essCRiPTioN @ j g l0l0l0l@lZl@l NA

' ' ' . .so~~d'imu'J,is

Nuveta ossCairTioN@ j.

NA .

l i l a l l 0 l 0 l 011l@l12 30 7 8 9 NY: ' "oas'Cn'[T o'N ' " @ .

"^ l 7

i 9 s e LJ@l io 8301280129 830119 m PusuC1"sCairtioN g PDR ADOCK 05000373 PDR NRC USE ONLY issuto ot s l lllllllllllll}

121 o1 L.Nj@l e r .

io es se so. s (815) 357-676) o R. W. Houston PHONE:

NAME OF PREPARER i

e I. LER NUMBER 82-173/03L-0 ,

II. LASALLE COUNTY STATION: Unit 1 III. DOCKET NUMBER: 050-373 IV. EVENT DESCRIPTION:

On December 21,1982 at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> during the performance of LOS-PC-Q1, Primary Containment Isolation Valves Operability Test and Inservice Inspection for Conditions 1, 2, and 3, Reactor Recirculation Coolant Sample Outboard Isolation Valve, IB33-F020, would not close when demanded from the Control Room.

V. PROBABLE CONSEQUENCES OF THE OCCURRENCE:

At the time of the occurrence the reactor was in the RUN mode at 24% MWT, 170 MWE.

The Reactor Recire. Coolant Sample Inboard Isolation Valve, 1B33-F019, was deenergized in the closed position per Technical Specification 3.6.3.

Safe plant operation was maintained at all times.

VI. CAUSE:

The E.T.O. Air Supply Solenoid Valve for 1B33-F020 was found to be sticking in the open position. This caused the air operator of 1B33-F020 to keep the valve open. 1B33-F020 is a 3/4" valve, type 70-18-9 DRT, manufactured by WKM valve division of ACF Industries.

VIl. CORRECTIVE ACTION:

Work Request #L21242 was written on 12/21/82 to troubleshoot the 1B33-F020 valve. When maintenance personnel attempted to recreate the problem, the valve cycled properly. This work request was then closed out on 12/23/82.

The Process Sample for the Reactor Recirculation System was then returned to service.

The 1B33-F020 valve failed to cycle properly again on 1/2/83 and Work Request #L21436 was written to troubitehoot. The reactor was in Opera-tional Condition #4 at the time, therefore, the affected penetration was not isolated per Tech. Spec. 3.6.3. The soledoid valve for 1B33-F020 was disassembled and cleaned and then reassembled. Work Request L21436 was completed on 1/7/83.

Prepared by: R. W. Houston