ML20010J007
| ML20010J007 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/21/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20010J008 | List: |
| References | |
| NUDOCS 8109290494 | |
| Download: ML20010J007 (1) | |
Text
Mailing Addr^ss 1
Alabama Power Company 600 Porth 18th Street Post Office Bon 2641 Birmingham, Alabama 0"/31 Telephone 205 783-6081 F. L. Clayton, Jr.
Semor Vice President Alabama Poner FI ntndge Building
!!w1 Souttun eh tinC Sf.lcm September 21, 1981 f3 Docket No. 50-364 Director of Nuclear Reactor Regulation jf h
U. S. Nuclear Regulatory Conmission i
LQ ggp2 8 /ggg Washington, D. C.
20555 Attention: Mr. S. A. Varga MD II Gentlemen:
N 4
Joseph M. Farley Nuclear Plant - Unit 2 NPF-8 License Condition 2.C.(19)(c)
As required by the Joseph M. Farley Unit 2 Full Power License, NPF-8 (paragraph 2.C.(19)(c)), the final design and implementation schedule of the modification of the lubrication system of the two Fairbanks-Morse opposed - piston diesel generators (1C and 2C) is to be submitted to the NRC, within su months of issuance of the license.
Enclosed as Attachment 1 is a design which will provide continuous lubrication to the lower crank shaft bearings with immediate lubrication to the upper crank shaft bearings upon startup.
It is Alabama Power Company's judgement that this design fully meets the requiraments of the license condition contained in paragraph 2.C.(13)
(c). Attachment 2 indicates Colt Industries' concurrence with this position. This modification is scheduled to be completed prior to power operation following the first refueling.
If you have any question, please advise.