ML20010F199

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re pull-out Performance of Hilti Kwik-Bolt Anchors,Initially Reported 801217.Condition Is Not Significant Deficiency & Is Not Reportable Per 10CFR50.55(e)
ML20010F199
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/31/1981
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.553, 10CFR-50.55E, TXX-3398, NUDOCS 8109090487
Download: ML20010F199 (1)


Text

Qo. $$V) bilf))

EB2'SEllaCo.,y TEXAS UTILITIES GENERATING COMIRNY OfM)I IlltYAN TOWE14 DAllAM,TEJCAM 7520t August 31, 1981 a A nav

"*::. :=:::'

TXX-3398 y\8, Y 5 6 u _,

.z C SEP 0 81981* t Mr. G. L. Madsen, Chief Reactor Projects Branch D v.A g,47 g/'

U. S. Nuclear Regulatory Commission @N Office of Inspection & Enforcement m s\(,

611 Ryan Plaza Drive, Suite 1000 Docket Nos. 50-445 '

Arlington, Texas' 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PULL-0VT FERFORMANCE OF HILTI KWIK-BOLT ANCHORS FILE N0: 10110

Dear Mr. Madsen:

On December 17, 1980 we verbally informed your Mr. R. G. Taylor of a change in published values of the ultimate pull-out performance of one-inch diameter HILTI Kwik-Bolt enchors.

On January 12, 1981 via TXX-3267 we advised you we were continuing our evaluation. This evaluation is now complete, and we have concluded that the condition is not a significant deficiency under the provisions of 10 CFR 50.55(e) and is not repertable.

Documentation supporting our conclusion is available for review at the site. If we can provide any additional information, please advise.

Very truly yours, f'

R. J. Gary RJG:lj

.cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

V. S. Nuclear Regulatory Commission WasV.n9 t on, D. C. 20555 81R9090487 810831 PDR ADOCK 05000445 ji 0 S PDR i

iL