Final Deficiency Rept Re Compressive Strength of Pipe Support Baseplate Grouting Matl Subjected to Elevated Temps, Initially Reported 810120.Condition Found Not Reportable Under 10CFR50.55(e)
ML20003C897
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/18/1981
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3279, NUDOCS 8103180666
Download: ML20003C897 (1)


Text

.

POR LPDR l TIC TEXAS UTILITIES GENERATING CO.TIPANY NSIC 2001 BRYM TOWER = DA1.1 A& TEXA8 75201 CENTRAL FILES'

. 2.a .y February 18, 1981

".'M;'J." ~".;l:' TXX-3279

-e,

~"

Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Decket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PIPE SUPPORT BASEPLATE GROUTING MATERIAL FILE NO. 10110

Dear Mr. Seidle:

On January 20, 1981 we verbally informed your Mr. R. G. Taylor of a deficier.cy regarding the compressive strength of pipe support baseplate grouting material when subjected to elevated temperatures.

We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.

Very truly yours ,

l Y

((y M r ,I .'%

R. J. Gary RJG:dk 01 '  ;

cc: NRC Region IV - (0 + 1 copy) ,

- mag \

6 5001,% i Director, Inspection & Enforcement - (15 copies)

T u,a,g7rg,%

c/o Distribution Services Branch, DDC, ADM.

l u. S. Nuclear Regulatory Commission  %

Washington, 0. C. 20555 &,

. y g 810s;gg(Dff .

_