ML19346A184

From kanterella
Jump to navigation Jump to search
Requests That Thorough Investigation Be Conducted Into Facility Const
ML19346A184
Person / Time
Site: Zimmer
Issue date: 04/28/1981
From: Brelje C
DAYTON, UNIV. OF, DAYTON, OH
To: Hall T
HOUSE OF REP.
References
NUDOCS 8106050343
Download: ML19346A184 (1)


Text

, e, DOCK.5T NUfd3tR

, g PROD. & UTIL FAC..g , g syg

....................u1

~.

UNIVERSITY OF DAYTON f DAYTON, OHIO 45469 os* A amec o r pwn.oso*=v e

~ th i ;.

DOCKETED M

, USWe" .--

April 28,1981 9 l

g g gggt

  • g '

i Representative Tony P. Hall Om:e a f.: seastwf United States House of Representatives 9 W ik # f 1728 Longworth House Office Building Washington, D.C. 20510

/ fpg

Dear Representative Hall:

I am shocked to learn of the possibility that the Zimmer nuclear facility under construction in southwestern Ohio contains serious construction flaws.

According to Tom Applegate, an Ondercover investigator who worked in the plant, and Tom Devine of the Government Accounting Project in Washington, D.C., there l are many problems with the facility: ,

. crucial welds were shoddily performed

. "non-critical" components were substituted for " critical." components .

. valves rated at Jow pressure tolerances were placed in piping which contains much higher pressure loads

.there have already been a number of accidents regarding piping and valve defects Representativei.Haill, all citizens, whether they be for or against the use of nuclear power, should be gravely concerned with allegations that the Zimmer plant is seriously flawed.

Please push for a thorouch investigation of the Zimmer facility. The potential cost in human lives cemands an immediate and thorough investigation.

s 5[

Sincerely, '

T \

1, 7 -ts .,

sp4 [ t I

Christopher J. Brelje' /' jutt04}9BF C Desartment of Philosophy 9 -

University of Dayton Dayton, OH 45469

' N * -

I g,

4 a jS"p 81060503% ff 1 - - . -. . ._.