ML20076M693

From kanterella
Jump to navigation Jump to search
Revises Re Bechtel Study Draft Rept on Mgt of Util.Bechtel Should Retain Rept & Arrange Meeting W/Torrey Pines Technology
ML20076M693
Person / Time
Site: Zimmer
Issue date: 07/13/1983
From: Cole G
CINCINNATI GAS & ELECTRIC CO.
To: Jones G
BECHTEL GROUP, INC.
References
GC-0012, GC-12, NUDOCS 8307210047
Download: ML20076M693 (1)


Text

.

PRitK;lPAL STAFF y/RA. 4%JENF D/RA SCSVhe,n 3%3 A/RA PA0 E)

"I'lIIC CINCINN ATI G AS & ICI lCCTILIC COM I*ANY 3PRP SLO OR*?A RC

~

July 13, 1983 GC-0012 MLhl FILE Mi j Mr. George Jones Bechtel Power Corporation P.

O.

Box 113 Moscow, Ohio 45153

Dear Mr. Jones:

RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 BECHTEL STUDY DRAFT REPORT CG&E P. O. ZC-046477 BECHTEL JOB 15697-002 This letter revises my letter GC-0006 of July 6,

1983, regarding the Bechtel Study Draft Report on Zimmer Project Management.

As arranged by CG&E's J. A. Vennemann and Torrey Pines Technology's A.

J. Neylan, Bechtel is to arrange with Torrey Pines to review the Study Draft Report at the Bechtel Los Angeles office.

Bechtel should retain all copies of the report and not transmit them to either CG&E or Torrey Pines Technology.

Please let me know what arrangements you have made

-with Torrey Pines for review of your report.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By g/

G. F.

Cole JC) ~'

h_

Assistant Vice President Nuclear Projects GFC:jac 23EGEK5khl~e'r]

cc:

A.

J.

Neylan fh ph O

A 32DI

\\\\?