ML20071L389
| ML20071L389 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 05/19/1983 |
| From: | Dobel H HARTFORD INSURANCE GROUP |
| To: | Harrison S NATIONAL BOARD OF BOILER & PRESSURE VESSEL INSPECTORS |
| References | |
| NUDOCS 8305270539 | |
| Download: ML20071L389 (2) | |
Text
Ii TIIE II A llT FOlt D ST E A SI IlOI LElt
- ,i I N N I* E CTI O N a ra tt I N S U lt A N C E CO NI I*A N Y
$1NCIPAL STAFF '
,,U A R T F O R D e CO NCTIC UT 00102 V RA lt; l') NNY
/
, 07 D/RA SCS v
A/RA
?AO L
DPRP S_LO T
[O%[
JRMA E
I DRMSP
---a DE.
L ML i
3 May 19, 1983 OL FlLM Q f
- r. S. F. Harrison, Executive Director The National Moerd of Boffer
& Pressure Vessel inspectors 1055 Crupper Avenun Columbus, Oh1o 43??9
Dear Mr. Harrison:
In response to your letter of April 22, 1983 regarding AMI activity at the Zimmer site, Moscow, Ohio we offer the following:
p h
1.
Presently, there is no ACME Code work in process at the Zinmer Site due to a stop work order by the PRC, which could necount for the
[
ANIS sperding nere time in the office than usual doing docunentation reveiws.
(
H. J. YefFer IF Continuing to resolve e73? tin 7 nonconformitfeS and verification of resolutions, in many instances, the ANIS do t
visit other areas on site e.g. reactor buf f ding, rocciving area, weld test cree., etc. to perform their verification activities.
p 2.
The procedure that has been established by H. J. Eniser is that they contact the ANIe at the office.
H. J. Kaiser personnel bring I
traveler packages, nonconfornance reports, and all other ASME Code
[
inspection related documente to the office for ANI'r review and
[
i acceptance. Travelers are reviewed and hold points established, When as a result of reviews of documentation, inspection and verffi-i l
catien ir required and the ANIS do go to the area required to verffy the resolution.
6 3.
Hartford Steen Boiler personnel are instructed to attend every
[
{
neeting they are invited to by Hartford's clients. Ucwever, it is
[
n policy of Hartford Steam Boiler not to attend ccetings to which y
l ve ere not invited.
p We informed H. J. Keirer that since we ere they're Authorized l
Inspection AFency and have en Inepcetion Agrectent with them, that
[(
j invitations to site coetings shall be through H. J. Kaiscr. When l
our presence is requested, en H. J. Eniser enployee shall riso bc j
present.
F-(
.s i
f 8305270539 830519 PDR ADOCK 05000358
'y a
PDR 43 REV. 6/76 (H S8) h 8
TII E II A RTI'Olt D ST E A h! HOI LE R
/
I N S I'ECTI O N a n ct I N N U R A N C E CO Nil *A N Y ydlNCIPAL STAFF
,u a nrro n o. cos.wcrwer 08:o2
[ON 4 3 '
\\
fRA lill/l INF D/RA SCS v
/RA AO i
DPRP S_LO
--)
JRMA RC
[h ~ N OFJ4SP
-a DE-ML 3
May 19, 1983 OL FlLM LD
- r. S. F. Harrison, Executive Director The National Board of Poiler
& Pressure Vessel Tnspectors g1055 Crupper Avenue W Columbus, Ohio 43229
Dear Mr. Unrrison:
In response to your letter of April 22, 1983 regarding AMI activity at the Zimmer site, Moscow, Ohio we offer the following:
1.
Presently, there is no A9tE Code work in process at the Zirner Site due to a stop work order by the PRC, which could account for the ANIS spending nere eine in the office than usual doing docunentation revefws.
H. J. Kaiser is continuing to resolve erfeting nonconfornities and verification of resolutions, in many instances, the ANIS do visit other areas on site e.g. reactor building, receiving area, weld test crea, etc. to perform their verification activities.
2.
The procedure that has been established by II. J. Kaiser is that they contact the ANIS at the office.
H. J. Taiser personnel bring traveler packages, nonconfornance reporta, and all other ASME Code inspection related documents to the office for ANI'r review and acceptance. Trevelers are reviewed and hold points established.
When as a result of reviews of documentation, inspection and verifi-catien ir required and the ANIS do 80 to the area required to verify the resolution.
3.
Hartford Steen Boiler personnel are instructed to attend every neeting they are invited to by Unrtford's clients. Ucwever, it is a policy of Hartford Steen Boiler not to attend nectings to which we are not invited.
We inforced H. J. Kaiser that since we ere they're Authorized Inspection AFency and have en Inspection Agreertent uith them, that invitations to site coetings shall be through H. J. Kaiser. When our presence is requested, en H. J. Kniser crployee shn11 clso be present.
8305270539 830519 PDR ADOCK 05000358 g
PDR MAY231983 D@
43 m. cne um l
~
l
- Mr. - S.) F. Harricca.
s.
.' -pcs, ~2 9
5/19/83 H. J.- Kaiser has recently requected that a monthly visit by one or more Authorized Nuclear Inspector Supervisorn be made. The first visit is scheduled for May 24 and ?5, 1983..
I assure you that we are dedicated to the. safe utilization of the nuclear option and the assistance of the Fational Board in achieving that objective is appreciated."
Very truly yours.
~
d.h.k m F. F. Dobel Director of Engineer Services HFD/SFH/1020/14 J
cc.
NRC ~ Region III 799 Roosevcit,Rond Glen Ellyn. T111 nots 60127 4
1 1
d k
4 s
^
s J
h' i
P N
..